Borough of Folsom, NJ
Atlantic County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Mayor and Council of the Borough of Folsom 11-10-1977 by Ord. No. 117. Amendments noted where applicable.]
GENERAL REFERENCES
Fees pertaining to Zoning Officer — See Ch. 103, Art. I.
Fire prevention — See Ch. 107.
Property maintenance — See Ch. 151.
Subdivision and land development — See Ch. 170.
Zoning — See Ch. 200.

§ 90-1 Local enforcing agency; Construction Official; subcode officials.

A. 
There is hereby established in the Borough of Folsom a State Uniform Construction Code Enforcing Agency to be known as the "Building Department of the Borough of Folsom," consisting of a Construction Official, building subcode official, plumbing subcode official, electrical subcode official, fire protection subcode official, and such other subcode officials for such additional subcodes as the Commissioner of the Department of Community Affairs, State of New Jersey, shall hereafter adopt as part of the State Uniform Construction Code. The Construction Official shall be the chief administrator of the enforcing agency. The incumbent Building Inspector shall be considered the building subcode official for all purposes of this chapter in lieu of his present designation as Building Inspector. All other construction and subcode officials shall be such individuals as are appointed by the Mayor and Council of the Borough of Folsom and shall be appointed for four-year terms. All appointments made after the first such appointment shall be for four-year terms commencing January 1 or for the unexpired portion of any term as the case may be.
B. 
Each official position created in Subsection A hereof shall be filled by a person qualified for such position pursuant to P.L. 1975, Ch. 217, as amended,[1] and N.J.A.C. 5:23; provided that, in lieu of any particular subcode official, an on-site inspection agency may be retained by contract pursuant to N.J.A.C. 5:23. More than one such official position may be held by the same person, provided that such person is qualified pursuant to P.L. 1975, Ch. 217, and N.J.A.C. 5:23 to hold each such position.
[1]
Editor's Note: See N.J.S.A. 52:27D-119 et seq.
C. 
The public shall have the right to do business with the enforcing agency at one office location except for emergencies and unforeseen or unavoidable circumstances, which office location shall be Borough Hall, Folsom, New Jersey.

§ 90-2 Appeals.

All appeals from decisions made by the Building Department of the Borough of Folsom shall be referred to and heard by the Atlantic County Construction Board of Appeals.

§ 90-3 Fees.

[Amended 2-14-1985 by Ord. No. 176; 9-28-1989 by Ord. No. 222; 5-7-1992 by Ord. No. 236; 6-17-1995 by Ord. No. 260; 11-13-1997 by Ord. No. 260A; 7-12-2001 by Ord. No. 260B; 8-8-2002 by Ord. No. 260C; 12-13-2006 by Ord. No. 13-2006; 3-14-2007 by Ord. No. 06-2007; 5-12-2010 by Ord. No. 08-2010]
A. 
Building Fee Schedule.
(1) 
Use Groups: A-1, A-2, A-3, A-4, A-5, F-1, F-2, S-1, S-2. Minimum fee: $58.
Line No.
Description
Work Types
Basis
From
To
Amt
Incr
Per
1
New building
NEW
Volume
$0.02000
2
Addition
ADD
Volume
$0.02000
3
Premanufactured construction
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
4
Rehabilitation - includes repair, alteration, renovation and reconstruction
REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
5
Minor work
MIN
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
6
Roofing
MIN REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
7
Siding
MIN REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
8
Deck or balcony
ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
9
Fence
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
10
Sign, pylon
NEW ADD REH
Cumulative range
First 100 square feet
1
100
$5
Next 400 square feet
101
500
$4
Each additional square foot thereafter
501
$3
11
Sign, ground or wall
NEW ADD REH
Cumulative range
First 100 square feet
1
100
$3
Next 400 square feet
101
500
$2
Each additional square foot thereafter
501
$1
12
Pool - in-ground
NEW ADD
Size range
Surface area <= 550 square feet
$95
Surface area > 550 square feet
$190
13
Pool - aboveground
NEW ADD
Size range
Surface area <= 550 square feet
$63
Surface area > 550 square feet
$127
14
Retaining wall at Class 3 residential structure
NEW ADD
Size range
With a surface area of 550 square feet or less
$95
With a surface area greater than 550 square feet
$190
15
Retaining wall of any size at structure other than Class 3 residential
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
16
Asbestos abatement
ASB
Flat fee
$107
17
Lead hazard abatement
LHZ
Flat fee
$178
18
Radon remediation
MIN RAD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
19
Demolition
DEM
Size range
<5,000 square feet in area and < 30 feet in height
$83
Over 5,000 square feet in area and over 30 feet in height
$152
20
Temporary structures
NEW ADD
Per item
$117
21
Open structural towers
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
22
Underground storage tank removal
DEM
Per item
$152
23
Plan review - alternate systems and nondepletable energy source provisions of Energy Subcode
NEW ADD REH
Size range
1- and 2-family (R-3 and R-5), and light commercial structures w/temp controlled by single point
$348
All other structures
$1,739
(2) 
Use Group: CFB. Minimum fee: $58.
Line No.
Description
Work Types
Basis
From
To
Amt
Incr
Per
1
New building
NEW
Volume
$0.0010
2
Addition
ADD
Volume
$0.0010
3
Premanufactured construction
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
4
Rehabilitation - includes repair, alteration, renovation and reconstruction
REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
5
Minor work
MIN
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
6
Roofing
MIN REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
7
Siding
MIN REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
8
Deck or balcony
ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
9
Fence
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
10
Sign, pylon
NEW ADD REH
Cumulative range
First 100 square feet
1
100
$5
Next 400 square feet
101
500
$4
Each additional square foot thereafter
501
$3
11
Sign, ground or wall
NEW ADD REH
Cumulative range
First 100 square feet
1
100
$3
Next 400 square feet
101
500
$2
Each additional square foot thereafter
501
$1
12
Pool - in-ground
NEW ADD
Size range
Surface area <= 550 square feet
$95
Surface area > 550 square feet
$190
13
Pool - aboveground
NEW ADD
Size range
Surface area <= 550 square feet
$63
Surface area > 550 square feet
$127
14
Retaining wall at Class 3 residential structure
NEW ADD
Size range
With a surface area of 550 square feet or less
$95
With a surface area greater than 550 square feet
$190
15
Retaining wall of any size at structure other than Class 3 residential
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
16
Asbestos abatement
ASB
Flat fee
$107
17
Lead hazard abatement
LHZ
Flat fee
$179
18
Radon remediation
MIN RAD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
19
Demolition
DEM
Flat fee
$83
20
Temporary structures
NEW ADD
Per item
$117
21
Open structural towers
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
22
Underground storage tank removal
DEM
Per item
$152
23
Plan review - alternate systems and nondepletable energy source provisions of Energy Subcode
NEW ADD REH
Size range
1- and 2-family (R-3 and R-5, and light commercial structures w/temp controlled by single point
$348
All other structures
$1,739
(3) 
Use Groups: R-3, R-5. Minimum fee: $58.
Line No.
Description
Work Types
Basis
From
To
Amt
Incr
Per
1
New building
NEW
Volume
0.03
2
Addition
ADD
Volume
0.03
3
Premanufactured construction
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
4
Rehabilitation - includes repair, alteration, renovation and reconstruction
REH
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
5
Minor work
MIN
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
6
Roofing
MIN REH
Flat fee
$58
7
Siding
MIN REH
Flat fee
$58
8
Deck or balcony
ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
9
Fence
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
10
Sign, pylon
NEW ADD REH
Cumulative range
First 100 square feet
1
100
$5
Next 400 square feet
101
500
$4
Each additional square foot thereafter
501
$3
11
Sign, ground or wall
NEW ADD REH
Cumulative range
First 100 square feet
1
100
$3
Next 400 square feet
101
500
$2
Each additional square foot thereafter
501
$1
12
Pool - in-ground
NEW ADD
Size range
Surface area <= 550 square feet
$95
Surface area > 550 square feet
$190
13
Pool - aboveground
NEW ADD
Size range
Surface area <= 550 square feet
$63
Surface area > 550 square feet
$127
14
Retaining wall at Class 3 residential structure
NEW ADD
Size range
With a surface area of 550 square feet or less
$95
With a surface area greater than 550 square feet
$190
15
Retaining wall of any size at structure other than Class 3 residential
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
16
Asbestos abatement
ASB
Flat fee
$107
17
Lead hazard abatement
LHZ
Flat fee
$178
18
Radon remediation
MIN RAD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
19
Demolition
DEM
Flat fee
$83
20
Temporary structures
NEW ADD
Per item
$117
21
Open structural towers
NEW ADD
Dollar range
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
22
Underground storage tank removal
DEM
Per item
$152
23
Plan review - alternate systems and nondepletable energy source provisions of Energy Subcode
NEW ADD REH
Size range
1- and 2-family (R-3 and R-5), and light commercial structures w/temp controlled by single point
$348
All other structures
$1,739
(4) 
Use Groups: B, E, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, R-1, R-2, R-4, U. Minimum fee: $58.
Line No.
Description
Work Types
Basis
From
To
Amt
Incr
Per
Min Fee
Max Fee
1
New building
NEW
Volume
$0.03
$0
$0
2
Addition
ADD
Volume
$0.03
$0
$0
3
Pre-manufactured construction
NEW ADD
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
4
Rehabilitation - includes repair, alteration, renovation and reconstruction
REH
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
5
Minor work
MIN
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
6
Roofing
MIN REH
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
7
Siding
MIN REH
Dollar range
$24
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
8
Deck or balcony
ADD
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
9
Fence
NEW ADD
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
10
Sign, pylon
NEW ADD REH
Cumulative range
$30
$0
First 100 square feet
1
100
$5
Next 400 square feet
101
500
$4
Each additional square foot thereafter
501
$3
11
Sign, ground or wall
NEW ADD REH
Cumulative range
$58
$0
First 100 square feet
1
100
$3
Next 400 square feet
101
500
$2
Each additional square foot thereafter
501
$1
12
Pool - in-ground
NEW ADD
Size range
$0
$0
Surface area <= 550 square feet
$95
Surface area > 550 square feet
$190
13
Pool - aboveground
NEW ADD
Size range
$0
$0
Surface area <= 550 square feet
$63
Surface area > 550 square feet
$127
14
Retaining wall at Class 3 residential structure
NEW ADD
Size range
$0
$0
With a surface area of 550 square feet or less
$93.25
With a surface area greater than 550 square feet
$190.50
15
Retaining wall of any size at structure other than Class 3 residential
NEW ADD
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30.48
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$22.86
$1,000
Over $100,000 estimated cost
$100,001
$19.05
$1,000
16
Asbestos abatement
ASB
Flat fee
$106.68
$0
$0
17
Lead hazard abatement
LHZ
Flat fee
$177.80
$0
$0
18
Radon remediation
MIN RAD
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
19
Demolition
DEM
Size range
$0
$0
<5,000 square feet in area and > 30 feet in height
$83
Over 5,000 square feet in area and over 30 feet in height
$153
20
Temporary structures
NEW ADD
Per item
$117
$0
$0
21
Open structural towers
NEW ADD
Dollar range
$30
$0
$1 - $50,000 estimated cost
$1
$50,000
$30
$1,000
$50,001 - $100,000 estimated cost
$50,001
$100,000
$23
$1,000
Over $100,000 estimated cost
$100,001
$19
$1,000
22
Underground storage tank removal
DEM
Size range
$0
$0
R-3/R-5/CFB
$83
All other use groups
$152
23
Plan review - alternate systems and nondepletable energy source provisions of Energy Subcode
NEW ADD REH
Size range
$0
$0
1- and 2-Family (R-3 and R-5), and light commercial structures w/temp controlled by single point
$348
All other structures
$1,739
B. 
Electrical Fee Schedule. Minimum fee: $58.
[Amended 11-9-2011 by Ord. No. 10-2011]
Line No.
Description
Basis
From
To
Amt
Incr
Per
1
Receptacles, fixtures, devices
Quantity range
First 50
1
50
$46
Each additional block of 25
51
$8
25
Lighting fixtures
Receptacles
Switches
Detectors
Light standards < 8 feet in height
Motors- fractional HP
Emergency and exit lights
Communications points
Alarm devices/FAC panel
Devices rated < 20 amps
Equipment rated <1 kw
2
Pool permit/with UW lights
Per item
$13
3
Private pool/spa/hot tub/fountain
Per item
$58
4
Storable pool/ hydromassage bath tub
Per item
$13
5
Electrical range/receptacle
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
6
Oven/surface unit
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
7
Household electrical cooking equipment (rated up to 16 kw)
Per item
$13
8
Electrical water heater
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
9
Electric dryer/receptacle
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
10
Dishwasher
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
11
Garbage disposal
Size range
1 to 10 hp
$13
11 to 50 hp
$58
51 to 100 hp
$117
Over 100 hp
$580
12
Central A/C unit
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
13
Space heater/air handler
Size range
1 to 10 hp or 1 to 10 kw
$13
11 to 50 hp or 11 to 50 kw
$58
51 to 100 hp or 51 to 100 kw
$117
Over 100 hp or over 100 kw
$580.39
14
Baseboard heat
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
15
Motors (1+ hp)
Size range
1 to 10 hp
$13
11 to 50 hp
$58
51 to 100 hp
$117
Over 100 hp
$580
16
Transformer/ generator
Size range
1 to 10 kw or kva
$13
11 to 45 kw or kva
$58
46 to 112.5 kw or kva
$117
Over 112.5 kw or kva
$580
17
Service
Size range
<= 225 amps
$58
>225 but <= 1,000 amps
$117
Over 1,000 amps
$580
18
Subpanels
Size range
<=225 amps
$58
>225 but <= 1,000 amps
$117
Over 1,000 amps
$580
19
Motor control center
Size range
<=225 amps
$58
>225 but <= 1,000 amps
$117
Over 1,000 amps
$580
20
Electric sign/outline light (in kws)
Size range
1 to 10 kw
$13
11 to 50 kw
$58
51 to 100 kw
$117
Over 100 kw
$580
21
Electric sign (> 20 but <= 225 amps)
Per item
$58
22
Fire, security or burglar alarm control unit
Per item
$13
23
Light-standard > 8 feet in height
Per item
$13
24
Communications closet
Per item
$13
25
Single/multi-station smoke/heat detectors, fire, burglar or security alarm systems, 1- and 2-family dwellings
Flat fee
$29
26
Utility load management device
Per item
$58
27
Other
Size range
> 1 but <= 10 hp or > 1 but <= 10 kw or >30 but <= 50 amps
$13
> 10 but <= 50 hp or > 10 but <= 45 kw or > 50 amps
$58
> 50 but <= 100 hp or > 45 but <= 112.5 kw
$117
Over 100 hp or over 112.5 kw
$580
28
Pool bonding
Per item
$13
29
Equipotential bonding grid
Per item
$13
30
Rain sensor
Per item
$13
C. 
Fire Protection Fee Schedule. Minimum fee: $58.
Line No.
Description
Basis
From
To
Amt
Incr
Per
1
Flammable/ combustible tanks
Per item
$0
2
Alarm systems
Quantity range
1 to 12 devices
1
12
$46
Each additional 25
13
$15
25
Detection devices
Supervisory devices
Signaling devices
Other devices
3
110v interconnected alarms
Quantity range
1 to 12 devices
1
12
$46
Each additional 25
13
$15
25
4
110v interconnected — 1- and 2-family dwellings (per dwelling unit)
Per item
$29
5
CO detectors/110v interconnected alarms
Quantity range
1 to 12 devices
1
12
$46
Each additional 25
13
$15
25
6
CO detector/110v interconnected alarms 1- and 2-family dwellings (per dwelling unit)
Per item
$29
7
Suppression systems
Size range
Fire pump
$0
GPM type
$0
8
Number of sprinkler heads
Flat fee range
Up to 20
1
20
$83
21 to 100
21
100
$152
101 to 200
101
200
$291
201 to 400
201
400
$754
401 to 1,000
401
1,000
$1,044
Over 1,000
1,001
$1,333
9
Number of dry pipe/alarm valves
Per item
$0
10
Number of pre-action valves
Per item
$0
11
Number of standpipes
Per item
$291
12
Preengineered systems: wet chemical
Per item
$117
13
Preengineered systems: dry chemical
Per item
$117
14
Preengineered systems: CO2 suppression
Per item
$117
15
Preengineered systems: foam suppression
Per item
$117
16
Preengineered systems: FM200 suppression
Per item
$117
17
Preengineered systems: other
Per item
$117
18
Kitchen hood exhaust
Per item
$58
19
Smoke control system
Per item
$58
20
Gas-fired appliances
Per item
$58
21
Oil-fired appliances
Per item
$58
22
Fireplace venting
Per item
$0
23
Incinerator
Per item
$464
24
Crematorium
Per item
$464
25
Other
Per item
$58
D. 
Plumbing Fee Schedule. Minimum fee: $58.
[Amended 11-9-2011 by Ord. No. 10-2011]
Line No.
Description
Basis
From
To
Amt
Incr
Per
1
Water closet
Per item
$13
2
Urinal/bidet
Per item
$13
3
Bathtub
Per item
$13
4
Lavatory
Per item
$13
5
Shower
Per item
$13
6
Floor drain
Per item
$13
7
Sink
Per item
$13
8
Dishwasher
Per item
$13
9
Drinking fountain
Per item
$13
10
Washing machine
Per item
$13
11
Hose bibb
Per item
$13
12
Water heater
Per item
$13
13
Fuel oil piping
Per item
$13
14
Gas piping
Per item
$83
15
LP gas tank
Per item
$83
16
Steam boiler
Per item
$83
17
Hot-water boiler
Per item
$83
18
Sewer pump
Per item
$83
19
Interceptor/ separator
Per item
$83
20
Backflow preventer
Size range
With test ports
$83
Without test ports
$13
21
Grease trap
Per item
$83
22
Sewer connection
Per item
$83
23
Water service connection
Per item
$83
24
Stacks
Per item
$13
25
Water-cooled airconditioning units
Per item
$13
26
Refrigeration units
Per item
$13
27
Active solar systems
Per item
$83
28
Other fixtures
Per item
$13
29
Other special devices
Per item
$83
E. 
Additional fees.
Line No.
Description
Amt
1
Certificate of occupancy
$70
2
Certificate of continued occupancy
$120
3
Certificate of approval
$0
4
Certificate of clearance lead abatement
$28
6
Certificate of compliance
$0
7
Sheds
$35

§ 90-4 Reporting requirements.

A. 
The Construction Official shall, with the advice of the subcode officials, prepare and submit to the Mayor and Council of the Borough of Folsom, biannually, a report recommending a fee schedule based on the operating expenses of the agency and any other expenses of the municipality fairly attributable to the enforcement of the State Uniform Construction Code Act.[1]
[1]
Editor's Note: See N.J.S.A. 52:27D-119 et seq.
B. 
In order to provide for the training, certification and technical support programs required by the Uniform Construction Code Act and the regulations,[2] the enforcing agency shall collect, in addition to the fees specified above, a surcharge (training) fee. Said surcharge (training) fee shall be remitted to the Bureau of Housing Inspection, Department of Community Affairs, on a quarterly basis for the fiscal quarter ending September 30, December 31, March 31 and June 30, and not later than one month next succeeding the end of the quarter for which it is due. In the fiscal year in which the regulations first become effective, said fee shall be collected and remitted for the third and fourth quarters only.
[Amended 5-20-2004 by Ord. No. 9-2004]
[2]
Editor's Note: "The regulations" refers to the regulations established by the Commissioner of the Department of Community Affairs.
C. 
The enforcing agency shall report annually at the end of each fiscal year to the Bureau of Housing Inspection, and not later than July 31, the total amount of the surcharge fee collected in the fiscal year. In the fiscal year in which the regulations first become effective, said report shall be for the third and fourth quarters only.