Editor's Note: See also Ch. 425, Water.
No subdivision will be approved unless connection with a public water main is assured for each lot. The design, construction and installation of water infrastructure shall be governed by the following.
A. 
The costs of design and installing all water infrastructure, such as mains, appurtenances, valves, service lines, meters, etc., within the subdivision shall be borne by the developer.
B. 
If the proposed subdivision is beyond the nearest City water main, the developer will be required to pay for all of the off-site extensions.
C. 
All work must be performed under City inspection. The cost of inspection and required testing, including the hiring of an independent engineer to perform said services, at the discretion of the City, shall be borne by the developer.
A. 
All construction work shall be done in conformance with the improvement construction plan previously approved by the City Engineer and the Planning Commission.
B. 
All work shall conform to standard specifications and details and other regulations established by the City of Harrington.
The developer will be responsible for water infrastructure until final acceptance and official release of the completion guaranty, including repairs, if necessary, and other reasonable provisions for the convenience and safety of the public.