No subdivision will be approved unless connection
with a public water main is assured for each lot. The design, construction
and installation of water infrastructure shall be governed by the
following.
A.
The costs of design and installing all water infrastructure,
such as mains, appurtenances, valves, service lines, meters, etc.,
within the subdivision shall be borne by the developer.
B.
If the proposed subdivision is beyond the nearest
City water main, the developer will be required to pay for all of
the off-site extensions.
C.
All work must be performed under City inspection.
The cost of inspection and required testing, including the hiring
of an independent engineer to perform said services, at the discretion
of the City, shall be borne by the developer.
The developer will be responsible for water
infrastructure until final acceptance and official release of the
completion guaranty, including repairs, if necessary, and other reasonable
provisions for the convenience and safety of the public.