Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Harrington, DE
Kent County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[1]
Editor's Note: See also Ch. 330, Sewers.
No subdivision will be approved unless connection with a public sanitary sewer main is assured each lot. The design, construction and installation of sanitary sewer lines shall be governed by the following.
A. 
The cost of design and installing all sanitary sewer infrastructure, such as sewer mains, pumping stations, manholes, cleanouts, laterals, etc., within the subdivision shall be borne by the developer.
B. 
If the subdivision is beyond the nearest City sewer main, the developer will be required to pay for all of the cost of extending the main to the subdivision.
C. 
All work must be performed under City inspection. The cost of inspection and required testing, including the hiring of an independent engineer to perform said services, at the discretion of the City, shall be borne by the developer.
A. 
All construction work shall be done in conformance with the improvement construction plan previously approved by the City Engineer and the Planning Commission.
B. 
All work shall conform to standard specifications and details and other regulations established by the City of Harrington.
The developer will be responsible for sanitary sewer infrastructure, such as sewer mains, pumping stations, manholes, cleanouts, laterals, etc., until final acceptance and official release of the completion guaranty, including repairs, if necessary, and other reasonable provisions for the convenience and safety of the public.