Township of Washington, PA
Berks County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Board of Supervisors of the Township of Washington 5-26-2005 by Ord. No. 2005-2[1]; amended in its entirety 6-28-2007 by Ord. No. 2007-02. Subsequent amendments noted where applicable.]
GENERAL REFERENCES
Uniform construction codes — See Ch. 45.
Sewers — See Ch. 95.
Subdivision and land development — See Ch. 107.
Zoning — See Ch. 131.
Fees — See Ch. A137.
099a Appendix A 099b Appendix B 099c Appendix C 099d Appendix D 099e App E p 1 099e App E p 2 099e App E p 3-7 099f Appendix F 099g Appendix G 099h Appendix H
[1]
Editor's Note: This ordinance also repealed former Ch. 99, Stormwater Management, adopted 3-8-1990 by Ord. No. 1990-3, as amended.
Article I General Provisions

§ 99-1 Title.

§ 99-2 Statement of findings.

§ 99-3 Purpose.

§ 99-4 Statutory authority.

§ 99-5 Applicability; regulated activities.

§ 99-6 Exemptions.

§ 99-7 Repealer.

§ 99-8 Severability.

§ 99-9 Compatibility with other ordinances or legal requirements; construal of provisions.

§ 99-10 through § 99-19. (Reserved)

Article II Definitions

§ 99-20 Interpretation; word usage.

§ 99-21 Definitions.

§ 99-22 through § 99-29. (Reserved)

Article III Drainage Plan Requirements

§ 99-30 General requirements.

§ 99-31 Drainage plan contents.

§ 99-32 Plan submission.

§ 99-33 Drainage plan review.

§ 99-34 Modification of plans.

§ 99-35 Resubmission of inconsistent or noncompliant drainage plans.

§ 99-36 through § 99-39. (Reserved)

Article IV Stormwater Management Requirements

§ 99-40 General requirements.

§ 99-41 Permit requirements by other governmental entities.

§ 99-42 Erosion and sediment control during regulated earth-disturbance activities.

§ 99-43 Nonstructural project design (sequencing to minimize stormwater impacts).

§ 99-44 Groundwater recharge.

§ 99-45 Water quality requirements.

§ 99-46 Stream bank erosion requirements.

§ 99-47 Stormwater peak rate control.

§ 99-48 Calculation methodology.

§ 99-49 Other requirements.

§ 99-50 Standards for detention basins.

§ 99-51 Stormwater collection and conveyance standards.

§ 99-52 through § 99-59. (Reserved)

Article V Inspections

§ 99-60 Inspections during installation; correction of deficiencies; final inspection.

§ 99-61 through § 99-69. (Reserved)

Article VI Fees and Expenses

§ 99-70 Municipality drainage plan review and inspection fee.

§ 99-71 Expenses covered by fees.

§ 99-72 through § 99-79. (Reserved)

Article VII Maintenance Responsibilities

§ 99-80 Performance guarantee.

§ 99-81 Responsibilities for operations and maintenance of stormwater controls and BMPs.

§ 99-82 Municipal review of stormwater control and BMP operations and maintenance plan.

§ 99-83 Adherence to approved stormwater control and BMP operations and maintenance plan.

§ 99-84 Operations and maintenance agreement for privately owned stormwater controls and BMPs.

§ 99-85 Stormwater management easements.

§ 99-86 Maintenance agreement for privately owned stormwater facilities.

§ 99-87 Recording of approved stormwater control and BMP operations and maintenance plan and related agreements.

§ 99-88 Municipal Stormwater Control and BMP Operation and Maintenance Fund.

§ 99-89 (Reserved)

Article VIII Prohibitions

§ 99-90 Prohibited discharges.

§ 99-91 Prohibited connections.

§ 99-92 Roof drains.

§ 99-93 Alteration of BMPs.

§ 99-94 through § 99-99. (Reserved)

Article IX Enforcement and Penalties

§ 99-100 Right-of-entry.

§ 99-101 Public nuisance.

§ 99-102 Enforcement generally.

§ 99-103 Suspension and revocation of permits and approvals.

§ 99-104 Violations and penalties.

§ 99-105 Notification.

§ 99-106 Enforcement.

§ 99-107 Appeals.