[Adopted 5-24-1973]
The following permit (building) fee schedule is hereby adopted:
A. 
Minimum building permit fee: $5 per $1,000 or any fraction thereof.
B. 
Minimum electric permit fee: $5 per permit.
C. 
Minimum plumbing permit fee: $5 per permit.
D. 
Minimum heating permit fee: $5 per permit.
E. 
Minimum septic tank fee: $10 per repair or replacement.
F. 
Minimum well permit fee: $1 per well (fee set by state).