[Adopted 12-20-1995]
[Amended 9-17-2002 by Res. No. 2002-10; 5-6-2003 by Res. No.
2003-09; 3-1-2005 by Res. No. 2005-04; 11-15-2005 by Res. No.
2005-10A; 2-6-2007 by Res. No. 2007-03; 10-3-2007 by Res. No. 2007-08; 1-5-2009 by Res. No. 2009-01]
A.
The following fee schedule is hereby adopted.
(1)
Building permits: $60, plus $3 per thousand of construction over
$2,000.
[Amended 11-21-2017 by Res. No. 2017-12]
(2)
Zoning permits: $60, plus $3 per thousand of construction over $2,000
[Amended 11-21-2017 by Res. No. 2017-12]
(3)
Demolition permits: $75.
[Amended 11-21-2017 by Res. No. 2017-12]
(4)
Inspection fees: 15% above inspection agency.
(5)
Tool / tent sales: $150.
[Amended 11-21-2017 by Res. No. 2017-12]
(6)
Business occupancy permit: $50.
(7)
Land development: $175, plus engineering fees.
[Amended 11-21-2017 by Res. No. 2017-12]
(8)
Subdivision: $75 per lot.
[Amended 11-21-2017 by Res. No. 2017-12]
(9)
Major subdivision: $300 first lot; $25 for each additional lot; plus
engineers' cost.
[Amended 11-21-2017 by Res. No. 2017-12]
(11)
Sewer tap: $750.
[Amended 11-21-2017 by Res. No. 2017-12]
(12)
Sewer surcharge: $8 per thousand gallons of usage.
[Amended 2-5-2013 by Res. No. 2013-02; 12-3-2013 by Res. No.
2013-08; 8-18-2015 by Res. No. 2015-06; 7-19-2016 by Res. No. 2016-07]
(13)
Vacating alleys and streets: $350.
(14)
Variance from Zoning Hearing Board: $400.
[Amended 11-21-2017 by Res. No. 2017-12]
(15)
Conditional use: $400.
[Amended 11-21-2017 by Res. No. 2017-12]
(16)
Trailer park permits: $75 per year, plus $20 per trailer.
[Amended 11-21-2017 by Res. No. 2017-12]
(17)
Road occupancy permits: $125.
[Amended 11-21-2017 by Res. No. 2017-12]
(18)
Driveway permits: $125.
[Amended 11-21-2017 by Res. No. 2017-12]
(19)
Timbering permits: $150.
[Amended 11-21-2017 by Res. No. 2017-12; 7-18-2023 by Res. No. 2023-03]
(20)
Mining permits: $500.
[Amended 11-21-2017 by Res. No. 2017-12]
(21)
On-lot sewer permits: $600.
[Amended 11-3-2009 by Res. No. 2009-13A]
(23)
Food truck permit: $25 annual fee.
[Added 7-18-2023 by Res. No. 2023-03]
(24)
Floodplain management permit: $50.
[Added 7-18-2023 by Res. No. 2023-03]
(25)
Peddling and solicitation permit: $50.
[Added 7-18-2023 by Res. No. 2023-03]
B.
Any violations of required permits will result in fees being doubled.
[Added 5-6-2003 by Res. No. 2003-09]
This schedule may be replaced or amended at
any time by resolution of the Board of Supervisors.