McLean County, IL
 
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the County Board of McLean County as amended through 6-15-2010 (Ch. 36 of the 1986 Code). Subsequent amendments noted where applicable.]
GENERAL REFERENCES
Fees — See Ch. 205.
Sewage disposal systems, water wells and geothermal exchange systems — See Ch. 310.
Zoning — See Ch. 350.
Attachment 1 - Appendix A Attachment 2 - Appendix B Attachment 3 - Appendix C Attachment 4 - Appendix D
Article I Title

§ 317-1 Title and citation.

§ 317-2 Pre-design conference.

Article II General Provisions

§ 317-3 Jurisdiction.

§ 317-4 Policy; additional standards; Manual of Practice.

§ 317-5 Purpose.

§ 317-6 Rules of construction.

§ 317-7 Definitions.

§ 317-8 Interpretation; conflict with other provisions.

§ 317-9 Effect on prior rights and provisions.

§ 317-10 Amendments.

§ 317-11 Conditions.

§ 317-12 Resubdivision or future subdivision of land.

§ 317-13 Vacation of plats.

§ 317-14 Variations.

§ 317-15 Compliance required; exceptions.

§ 317-16 Penalties.

§ 317-17 Plat Officer.

§ 317-18 Disclosure of beneficial interests in land trusts.

§ 317-19 Timing.

Article III Submission and Review Procedures

§ 317-20 Pre-design conference.

§ 317-21 Preliminary plan.

§ 317-22 Public improvement engineering plans and specifications.

§ 317-23 Public improvement installation and inspection procedures.

§ 317-24 Final plat.

§ 317-25 Final development plans for planned unit developments.

§ 317-26 Payment, performance, and workmanship guarantees.

§ 317-27 Submission of record drawings.

§ 317-28 Acceptance for maintenance.

§ 317-29 Final release of final plat public improvement payment, performance and workmanship bonds.

Article IV Form and Content

§ 317-30 Concept plan.

§ 317-31 Preliminary plans and supporting material.

§ 317-32 Public improvement engineering plans and specifications.

§ 317-33 Final plat.

§ 317-34 Final development plans for planned unit developments.

§ 317-35 Performance and workmanship guarantees.

§ 317-36 Record drawings.

Article V Planned Unit Developments

§ 317-37 Purpose; standards.

Article VI Erosion, Sediment and Stormwater Control

§ 317-38 General requirement.

§ 317-39 Design and installation standards.

§ 317-40 Maintenance standards.

Article VII Stream Buffer Regulations

§ 317-41 Findings.

§ 317-42 Purpose.

§ 317-43 Definitions.

§ 317-44 Compliance required.

§ 317-45 Application for permit.

§ 317-46 Design standards.

§ 317-47 Buffer management and maintenance.

§ 317-48 Enforcement procedures; penalties.

§ 317-49 Variances.

§ 317-50 Conflict with other codes and regulations.