Table of Contents
Table of Contents
- Adopting Ordinance
- Ch AO Adoption Ordinance
- Municipal Code
- Ch 1 Administration and Government
- Ch 2 Animals
- Ch 4 Buildings
- Ch 5 Code Enforcement
- Ch 6 Conduct
- Ch 7 Fire Insurance Proceeds
- Ch 9 Floodplain Management
- Ch 10 Health and Safety
- Ch 11 Housing
- Ch 12 Libraries
- Ch 13 Licenses, Permits and General Business Regulations
- Ch 15 Motor Vehicles and Traffic
- Ch 16 Parks and Recreation
- Ch 18 Sewers and Sewage Disposal
- Ch 19 Erosion and Sediment Control
- Ch 20 Solid Waste
- Ch 21 Streets and Sidewalks
- Ch 22 Subdivision and Land Development
- Ch 23 (Reserved)
- Ch 24 Taxation, Special
- Ch 25 Trees and Vegetation
- Ch 26 Water and Stormwater Management
- Ch 26 Pt 5 Neshaminy Creek Watershed Stormwater Management
- Ch 26 Pt 5 Art A General Provisions.
- ยงย 26-501 Short title.
- ยงย 26-502 Statement of findings.
- ยงย 26-503 Purpose.
- ยงย 26-504 Statutory authority.
- ยงย 26-505 Applicability; regulated activities.
- ยงย 26-506 Exemptions.
- ยงย 26-507 Compatibility with other ordinance or legal requirements.
- Ch 26 Pt 5 Art B Terminology.
- ยงย 26-511 Interpretation.
- ยงย 26-512 Definitions.
- Ch 26 Pt 5 Art C Stormwater Management.
- ยงย 26-521 General requirements.
- ยงย 26-522 Permit requirements by other governmental entities.
- ยงย 26-523 Volume control.
- ยงย 26-524 Stormwater peak rate control and management districts.
- ยงย 26-525 Calculation methodology.
- ยงย 26-526 Best management practice (BMP) design and construction criteria.
- ยงย 26-527 Other requirements.
- Ch 26 Pt 5 Art D Stormwater Management (SWM) Site Plan Requirements.
- ยงย 26-531 General requirements.
- ยงย 26-532 SWM site plan requirements.
- ยงย 26-533 Plan submission.
- ยงย 26-534 Stormwater Management (SWM) site plan review.
- ยงย 26-535 Modification of plans.
- ยงย 26-536 Resubmission of disapproved SWM site plans.
- ยงย 26-537 Authorization to construct and term of validity.
- Ch 26 Pt 5 Art E Inspections.
- ยงย 26-541 Inspections.
- Ch 26 Pt 5 Art F Fees and Expenses.
- ยงย 26-551 Municipal stormwater management (SWM) site plan review and inspection fee.
- ยงย 26-552 Expenses covered by fees.
- Ch 26 Pt 5 Art G Maintenance Responsibilities.
- ยงย 26-561 Performance guarantee.
- ยงย 26-562 Maintenance responsibility and guarantees.
- ยงย 26-563 Responsibilities for operations and maintenance (O&M) of stormwater facilities and BMPs.
- ยงย 26-564 Municipal review of stormwater facilities and BMP operations and maintenance (O&M) plan.
- ยงย 26-565 Operations and maintenance (O&M) agreement for privately owned stormwater facilities and BMPs.
- ยงย 26-566 Stormwater management easements.
- Ch 26 Pt 5 Art H Prohibitions.
- ยงย 26-571 Prohibited discharges.
- ยงย 26-572 Prohibited connections.
- ยงย 26-573 Roof drains.
- ยงย 26-574 Alteration of SWM BMPs.
- Ch 26 Pt 5 Art I Enforcement and Penalties.
- ยงย 26-581 Right of entry.
- ยงย 26-582 Inspection.
- ยงย 26-583 Enforcement.
- ยงย 26-584 Suspension and revocation of permits and approvals.
- ยงย 26-585 Violations and penalties.
- ยงย 26-586 Appeals.
- Ch 27 Zoning
- Disposition List
- Ch DL Disposition List
Public Documents