Exciting enhancements are coming soon to eCode360! Learn more 🡪
St. Charles County, MO
 
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. No. 01-061 §§1—8, 5-30-2001]
A. 
All sites proposed to operate as recycling centers must submit certification of compliance with applicable zoning and conditional use permit (CUP) provisions recognized by the County Division of Planning and Zoning of the Department of Community Development. Such certification shall be sent to the Division of Environmental Health and Protection prior to or concurrent with initial registration.
[Ord. No. 15-034 §14, 3-30-2015]
B. 
Recycling center sites shall be operated in such a manner as to not cause nuisance conditions or violations of any Code, standard or regulation administered by any applicable unit of local, County or State Government.
C. 
Property buffer/setback distances shall conform to applicable CUP conditions and verified with operating application submittal.
[Ord. No. 15-034 §14, 3-30-2015]
[1]
Editor's Note—For designation of the Division of Planning and Zoning, see Ord. No. 02-204, adopted 12-23-2002 set out in Ch. 132 of this Code and Ord No. 03-195, adopted 12-31-2003.
[Ord. No. 01-061 §§1—8, 5-30-2001; Ord. No. 15-034 §15, 3-30-2015]
Every recycling center shall file a statement with the Division Director prior to initial opening of the center, and upon any substantial change to volume and type of waste received at the center. The Division Director reserves the right to require recycling centers to register again as often as deemed necessary but not to exceed once per year. The statement shall be on a form provided by the Department. The statement shall contain the information as follows:
A. 
Volume/tons of recovered material by type (i.e., glass, ferrous metals, paper fiber grades, etc.) received, or to be received by the facility per calendar year.
B. 
Volume/tons of recovered material by type (i.e. glass, ferrous metals, paper fiber grades, etc.) shipped, or to be shipped each calendar year from the facility for the purpose of resource recovery.
C. 
Summary of significant changes to the center's operation.
D. 
Other information as required by the Division Director.
[Ord. No. 01-061 §§1—8, 5-30-2001]
A. 
At least once per year, every hauler of residential source-separated material who hauls such material from its point of origin shall file a statement with the Division Director registering the hauler to haul source-separated material. The statement shall contain such other information as the Division Director may request, including:
1. 
Volume/tons of source-separated material by type (i.e. glass, ferrous metal, paper fiber grades, etc.) received by the hauler during the previous calendar year.
2. 
Volume/tons of recovered material by type (i.e. glass, ferrous metal, paper fiber grades, etc.) deposited at a facility for the purpose of resource recovery during the previous calendar year.