Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Byrnes Mill, MO
Jefferson County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[R.O. 2011 §700.030; Ord. No. 150-90 §III, 3-7-1990; Ord. No. 937-21, 3-3-2021]
A. 
It shall be unlawful for any person to connect, or permit the connection of, or authorize the connection of any service line to a sanitary sewer main or lateral within the City without obtaining a sanitary sewer connection permit from the City and from Jefferson County Public Sewer District.
B. 
No building permit for the construction or alteration of any building or structure which requires a potable water supply or sanitary sewer connection shall be issued unless the owner of the property on which such building or structure is to be situated has obtained sanitary sewer connection permits. This provision shall not apply where a structure connected to the sanitary sewer system exists on the lot or parcel on which the building or structure is to be built and the proposed construction will not increase the load on the sewer system, either by increasing the number of persons residing on the land or by increasing the total number of gallons or liters of waste flowing through the system, increasing the number of pounds or grams of suspended solids in the sewage, increasing the number of pounds of grams of heavy metals or by increasing the amount of biochemical oxygen demand of the sewage from the entire lot or parcel.
[R.O. 2011 §700.040; Ord. No. 150-90 §III, 3-7-1990; Ord. No. 314-94 §§I — II, 5-4-1994; Ord. No. 937-21, 3-3-2021[1]]
A. 
The owner or owner's agent of any real estate who desires a sanitary sewer connection permit shall submit an application therefor on forms approved by the City for excavation. The application shall be, in writing, shall be signed and verified by the owner or owner's agent of the property which is to be connected to the sanitary sewer system, and shall contain the following information:
1. 
The name and address of the owner.
2. 
The size, type, and proposed use of the building which is being served by the sewer.
3. 
A permit must be obtained from Jefferson County Public Sewer District and a copy supplied to the City.
B. 
The contractor shall be required to post a refundable five hundred dollar ($500.00) bond on application for a sanitary sewer connection permit.
[1]
Editor's Note: Ord. No. 937-21 also changed the title of this Section from "Application to Permit" to "Application For Excavation Permit."
[1]
Editor's Note: Former Section 700.050, Additional Regulations and Section 700.060, Service Line, were repealed 3-3-2021 by Ord. No. 937-21.