[Prior code § 18.07(1)]
A. 
No person, firm or corporation shall divide any land located within the corporate limits of the Village which shall result in a minor subdivision as defined by this title without first filing an application and a certified survey map for approval by the Plan Commission and the Village Board, and subsequently recording said map with the Walworth County register of deeds. The certified survey map shall comply fully with Section 236.34, Wisconsin Statutes and with all applicable requirements of this title.
B. 
Pre-Application Procedure. Before filing an application for approval of a certified survey, the subdivider shall consult with the director of public works and shall prepare the following:
1. 
Prepare a preliminary sketch for review and approval;
2. 
Complete a site assessment checklist (per Section 16.12.030), or when required, an expanded site assessment report (per Section 16.12.040) for review and approval;
3. 
Complete a concept plan (per Section 16.12.050) for review and approval.
This procedure is intended to assist the developer in appraising the objectives of these regulations, the master plan, the official map and other pertinent Village ordinances. The pre-application information shall be submitted to the Plan Commission as a preliminary certified survey map for review and approval.
C. 
Plan Commission Action. The Plan Commission shall within 45 days approve, approve conditionally or reject the certified survey map. In certain instances, the Plan Commission may not require a preliminary certified survey map. The reason for conditional approval or for rejection shall be recorded in the minutes and a letter detailing the action taken shall be sent to the applicant. After the conditions of approval have been satisfied, the resolution of approval and of acceptance for any land dedications shall be presented to the appropriate governmental body for action and if approved shall be placed on the face of the map with nonfading ink.
D. 
Compliance.
1. 
The applicant shall comply with the provisions of Section 16.08.010 (General Requirements) and Chapters 16.32 through 16.44 (Required Improvements and Design Standards) of this title.
2. 
Where streets or other areas are dedicated to the public, the certified survey map shall contain an owner's and a mortgagee's certificate which are in substantially the same form as required by Section 236.21(2)(a), Wisconsin Statutes.
3. 
Before an approved certified survey map is recorded, the applicant must pay to the Village or other unit of government, any accrued real estate taxes and special assessments owing on any land dedicated by the survey and to the Walworth County Treasurer any delinquent taxes on the dedicated land.
4. 
Upon recordation by the developer, two copies of the recorded document shall be furnished to the Village.
[Prior code § 18.07(2)]
A. 
The certified survey map shall be prepared by a registered land surveyor and shall comply with the provisions of Section 236.34, Wisconsin Statutes. and of this title.
B. 
The certificate of approval shall be placed on the face of the map.
C. 
When a dedication of land is required, the Village Board resolution accepting the dedication and approving the map shall be placed on the face of the map.
[Prior code § 18.07(3)]
Lot line adjustments shall require a complete application as determined by the Zoning Administrator, along with the associated fee established by Section 16.08.020. Upon approval of a lot line adjustment, a copy of the final survey shall be filed with the Village Clerk and the Walworth County register of deeds.