New flood management projects located within the co-permittee's jurisdiction must be assessed for impacts on water quality. Existing projects must be assessed for incorporation of additional water quality protection devices or practices, where feasible. Flood management projects in the plan area can include: regional stormwater control (retention basins, detention basins); flood control levees and associated pump stations; stormwater drainage conveyance capacity improvements; projects involving land buyouts; and designated uses of floodplain land.
B. 
Stormwater management projects in both development and redevelopment will be assessed for water quality impact, according to MSD's "Rules and Regulations and Engineering Design Requirements for Storm Water Drainage Facilities," which address the Storm Water Management Plan water quality requirements under MCM 5. All flood management projects involving channel modification will also be assessed for aquatic and water quality impacts through the Corps of Engineers 404 permit and MDNR 401 water quality certification process.
[R.O. 1998 § 550.610; Ord. No. 2802 §1, 7-17-2012]
Existing projects located within the plan area: none at this time.
[R.O. 1998 § 550.620; Ord. No. 2802 §1, 7-17-2012]
All co-permittees that plan, design or install flood management projects are subject to this Article. MSD has general responsibility for stormwater drainage facilities in the plan area. St. Louis County, municipalities, and property owners have responsibility for the drainage facilities not dedicated to, and maintained by MSD. St. Louis County and municipalities maintain control over planning and zoning, land use regulations, and floodplain management through ordinances.
[R.O. 1998 § 550.630; Ord. No. 2802 §1, 7-17-2012]
A. 
Implement and enforce ordinances and/or procedures requiring that water quality factors be incorporated into the design and operation of stormwater/flood control structures.
B. 
Inspect existing flood management facilities on a specified frequency to determine water quality impacts and exploit opportunities for improvement.
C. 
Existing control structures undergoing renovation are modified to the maximum extent practicable to meet new construction criteria in MSD's "Rules and Regulations and Engineering Design Requirements for Sanitary Sewage and Stormwater Drainage Facilities."
D. 
Design new flood management projects to prevent or minimize adverse water quality impacts, exploring alternative programs utilizing non-structural flood damage reduction and stream bank stabilization measures to the maximum extent practicable.
E. 
Use models based on fully developed conditions, and adopt a free board above base flood elevation for development.
F. 
Identify existing wetlands or other natural open space areas, particularly around streams, and preserve them from development so they can provide natural attenuation, retention or detention of runoff.
G. 
Survey watersheds downstream from proposed projects to determine potential water quality impacts. Design proposed projects to minimize downstream impact.
H. 
Work closely with local governments, environmental organizations and others to develop multi-use open space corridors along streams which will allow for over-bank floodplain storage.
I. 
Floodplains are preserved to the maximum extent practicable.
J. 
Use non-structural flood management practices to the maximum extent practicable, utilizing acquisition of flood-prone property where possible.
K. 
Open stormwater conveyance systems are used to the maximum extent practicable to preserve natural conditions and habitat.
L. 
Channel improvement projects are to use natural approaches rather than concrete, riprap or other "hard" techniques to the maximum extent practicable.
M. 
Inlets and outlets from closed portions of conveyance systems are designed to minimize scour and erosion.
N. 
Trash racks are provided at outlet structures of detention ponds and other flood control structures to capture trash and floatables.
O. 
Employ natural solutions and use controls that preserve the hydrology of a site as a first line of flood control to the maximum extent practicable.
[R.O. 1998 § 550.640; Ord. No. 2802 §1, 7-17-2012]
Employees and contractors responsible for the planning and design of the flood management projects identified in Section 550.600 will be trained on the BMPs in this Article. In addition, employees performing this work will be familiar with MSD's rules and regulations and engineering design requirements for stormwater drainage facilities.