The purpose of this Chapter is to give a general view of the working relationship between the developer and the local government concerning the specifications listed in this manual. This chapter also explains some of the terminology used throughout this manual and lists the references herein.
These specifications are established under the authority of the Henderson City-County Planning Commission for the use of all persons, firms, or corporations constructing improvements which are or may become public facilities under the jurisdiction of the City and County of Henderson. Whenever, in these specifications, the term developer is used, it shall refer to the person, firm or corporation installing the work, and includes contractors, subcontractors, agents, and any other person or entity installing or constructing public improvements.
Whenever, in these specifications, the term Engineer is used, it shall refer to Engineers employed by the City of Henderson, Henderson County, a Local Utility Engineer, or any other duly authorized representative having jurisdiction over the work to be performed, including inspectors employed by local government or a public utility.
The term HWU in these specifications refers to the Henderson Water Utility.
Certain technical aspects concerning construction materials and methods of construction are based on the Kentucky Transportation Cabinet, Standard Specifications for Road and Bridge Construction, current edition, hereafter referred to as the KYTC Specifications. A copy of said specifications is available for reference in the office of the Henderson City Engineer.
Other standards or specifications referred to are those of the American Society of Testing Materials (ASTM), American Association of State Highway and Transportation Officials (AASHTO), the American National Standards Institute (ANSI) and the American Waterworks Association (AWWA).
Standard drawings showing details of certain improvements which may be issued by the various Engineers shall be complementary to and a part of these specifications.
The Engineer shall decide on all questions which may arise as to the interpretation of the specifications or plans relating to the work, and all questions as to the acceptable fulfillment of the work performed by the developer. The Engineer shall decide any and all questions which may arise as to the quality and acceptability of materials furnished and work performed and as to the manner of performance of the work.
The developer shall perform and complete the work to the satisfaction of the Engineer and in accordance with these specifications. The developer shall conduct his work so as to minimize interference with public and private business and traffic, and shall, at his own expense, whenever necessary or required, provide barricades, flagmen, maintain lights, and take other precautions as may be necessary to protect life, property, adjacent buildings, and structures. The developer shall be liable for all damages and injuries received or sustained by any person, persons or property in consequence of any neglect or misconduct by him or his agents, subcontractors, employees, or workmen.
For use during construction of improvements, two (2) complete sets of prints of all improvement plans shall be furnished to the office of the Engineer. These plans shall have received preliminary approval by the Henderson City-County Planning Commission, when appropriate. All plans for potable water lines, sanitary sewers, and storm sewers shall be certified by a Licensed Professional Engineer registered in the State of Kentucky. In addition, copies of all design calculations in connection with sanitary and storm drainage facilities shall be furnished to the Engineer and to the Planning Commission. The Engineer may at his discretion require submittal of suitable electronic copies of plans in a standard format (e.g., AutoCAD).
GPS coordinates in an appropriate datum specified by the City or County shall be collected and submitted to the Engineer for all utility improvements, including sanitary, water and stormwater, and other utilities when required. Coordination of this activity with local government and utility staff shall be the responsibility of the developer, and the developer may be required to uncover any facilities not so recorded. Utility connections (laterals and services) shall be included in this location information. One (1) copy of this information shall be furnished to the Engineer.
Plans shall be complete, and shall show all information necessary to allow construction of the improvements to the requirements of these specifications. Plans shall be drawn to a scale, and shall include all construction notes, topographic details, elevations, property lines, proposed improvements and other information as required by the Engineer.
Cooperation with the Engineer concerning construction planning and procedures is required. Reasonable notice shall be given the Engineer or his representative prior to beginning any phase of construction, normally 24 hours prior to work activity. In emergencies notice may be given not less than 4 hours in advance of work. In instances where the developer fails to request inspections prior to or during performance of the work, the Engineer may require cores, samples, destructive testing or other measures to insure that work performed meets the requirements of these specifications, and all such additional tests or procedures and costs of removing, replacing or repairing items so tested shall be at the sole expense of the developer.
All improvements must conform to the adopted Public Improvement Specifications and be satisfactory to the Engineer. Materials not in accordance with the specifications or defective work may be rejected by the Engineer at any time before final approval and acceptance by the Engineer. Failure by the Engineer to reject defective work shall not be construed as acceptance of same. Defective work shall be removed and replaced at the developer's sole expense.
All improvements must be inspected by the Engineer or his representative. The Developer may be required to uncover, test and/or remove work that was not inspected prior to backfill.
In addition to normal inspection which may be conducted during construction of development improvements, a final inspection will be made by the Engineer or his representative, prior to acceptance of any part of the work for maintenance by the local government. As part of the final inspection, all sanitary and storm manholes shall be opened. All sanitary and storm drain facilities shall be cleaned of all dirt, mud, and other foreign matter. The developer shall provide personnel as required to aid in the final inspection.
CCTV inspection of Sanitary and Storm Sewers in the HWU service areas shall consist of televising 10% of the main pipelines and 25% of the sanitary laterals, and a fee is computed and assessed at the time of approval of the plans. Should CCTV inspection reveal the failure of any portion of the system to meet the requirements of the applicable Technical Standards, HWU reserves the right to televise any additional portions up to and including the entire system in which a failure was identified at the developer's expense.
Special precautions shall be taken by the Developer to avoid damage to existing overhead and underground utilities owned and operated by the City or by public or private utility companies.
Where existing utilities or appurtenant structures, whether underground or aboveground are encountered, they shall not be displaced or disturbed unless necessary, and in such cases shall be replaced in as good or better condition than found as quickly as possible.
The developer shall bear the entire responsibility for locating, avoiding or repairing damage to said existing utilities. No work shall be performed prior to contacting Kentucky 811 and existing underground utilities being located and marked. Developer is responsible for contacting utilities that do not subscribe to Kentucky 811.
In accordance with KRS 367.4901 through .4917, Developers are responsible for notification of utility companies prior to the commencement of work. All underground facilities installed after January 1, 2013, shall include a means to accurately identify and locate the underground facilities from the surface. This does not apply to the repair of existing facilities.
Unless otherwise required by the agencies involved, the developer shall make application for, obtain and pay for all licenses, permits, easements, and rights-of-way. The developer shall be required to comply with all State and local ordinances, laws, and codes which may apply to the work.
Material and soil testing shall be performed by the Developer under the direction of the engineer or street inspector. When an independent laboratory test is requested by the Engineer or the developer, such testing shall be paid in full by the party requesting the additional testing.
Developer shall control water pollution through use of best management practices that limit eroded sediment leaving the site, and shall coordinate these measures with the construction schedule to ensure effective and continuous erosion control throughout the construction and post construction periods.
Before any disturbance is made, perform an initial site inspection with the Engineer, record what areas are to be disturbed, submit an erosion and sediment control plan showing what BMPs will be used, design BMPs according to good engineering practices, and install the designated BMPs. Before opening or affecting any new areas, repeat this process and ensure all BMPs are installed before starting work.
For sites containing more than one (1) acre of disturbed area, a Notice of Intent (NOI) must be filed with the Kentucky Division of Water. The complete NOI submittal shall be copied to the Engineer, for local review and permitting, and this review and permitting is separate and apart from State approval of any plan.
1.13.1. 
DESIGN REQUIREMENTS. Grading, erosion control practices, sediment control practices, and waterway crossings shall meet the design criteria set forth in the most recent version of the applicable Technical Stormwater Manual, and shall be adequate to prevent transportation of sediment from the site. Design requirements include:
a. 
Cut and fill slopes shall be no greater than 2:1 (horizontal: vertical), except as approved by the Engineer to meet other community or environmental objectives.
b. 
Clearing and grading of natural resources, such as forests and wetlands, shall not be permitted, except when in compliance with State and Federal regulations. Clearing techniques shall retain natural vegetation and drainage patterns to the maximum extent practicable, as described in the Technical Stormwater Manual.
c. 
Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and stabilized.
d. 
Phasing is encouraged on all sites, with the size of each phase to be established at plan review and as approved by the Engineer.
e. 
Erosion control measures shall include the following:
(i.) 
Soil stabilization shall be initiated within fourteen (14) days of clearing or inactivity in construction.
(ii.) 
If seeding or another vegetative erosion control method is used, adequate temporary erosion control may be required until permanent cover is established.
(iii.) 
Special techniques that meet the design criteria outlined in the applicable Technical Stormwater Manual on steep slopes or in drainage ways shall be used to ensure stabilization.
(iv.) 
Soil stockpiles must be contained at the end of each workday, with adequate measures taken to control and treat runoff.
(v.) 
The entire site must be stabilized, using a heavy mulch layer or another method that does not require germination to control erosion, at the close of the construction season.
(vi.) 
Techniques shall be employed to prevent the blowing of dust or sediment from the site.
(vii.) 
Techniques that divert upland runoff past disturbed slopes shall be employed.
f. 
Sediment control measures may be required to include, if applicable:
(i.) 
Settling basins, sediment traps, or tanks and perimeter controls.
(ii.) 
Settling basins that are designed in a manner that allows adaptation to provide long term storm water quantity and quality management, if required by the Engineer.
(iii.) 
Protection for adjacent properties by the use of a vegetated buffer strip in combination with perimeter controls.
g. 
Waterway and watercourse protection requirements shall include:
(i.) 
A temporary stream crossing installed and approved by the Kentucky Division of Water if a wet watercourse will be crossed regularly during construction.
(ii.) 
Stabilization of the watercourse channel before, during, and after in-channel work.
(iii.) 
All on-site storm water conveyance channels designed according to the criteria outlined in the applicable Technical Stormwater Manual.
(iv.) 
Stabilization adequate to prevent erosion located at the outlets of all pipes and paved channels.
(v.) 
Vegetative buffer strips may be required along watercourses, in conformance with the applicable Flood Damage Prevention Ordinance.
h. 
Construction site access requirements shall include:
(i.) 
Approved temporary access entrance(s) provided at all sites.
(ii.) 
Other measures necessary to ensure that sediment is not tracked onto public streets by construction vehicles or washed into storm drains.
i. 
Other requirements include:
(i.) 
Trash control.
(ii.) 
Contained washout facility for concrete trucks.
j. 
Stormwater Management Measures Post-Construction. Owners or operators of any new development or redevelopment project shall design, construct and perpetually maintain stormwater management facilities or measures that will treat, filter, infiltrate, screen, harvest or reuse stormwater runoff from all impervious areas to manage stormwater quality. Facilities constructed or measures used to meet this requirement shall capture or treat all such runoff up to and including that from an 80th percentile storm event. The 80th percentile storm intensity and technical details of treatment requirements in the applicable Technical Stormwater Manual.