home
Home
code
Code
Code
Index
law
Laws (1)
New Laws (1)
pubdocs
Public Documents
Public Documents
Legislation (1)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Borough of Honey Brook, PA
chevron_right
2023-03-06
info
chevron_right
Code of Ordinances
chevron_right
Chapter 23 Stormwater Management
Adopting Ordinance
Ch AO
Adopting Ordinance
Fee Schedule
Ch FS
Fee Schedule
Code of Ordinances
Ch 1
Administration and Government
Ch 2
Animals
Ch 4
Buildings
Ch 5
Code Enforcement
Ch 6
Conduct
Ch 7
Fire Prevention and Fire Protection
Ch 8
Floodplain Management
Ch 10
Health and Safety
Ch 11
Housing
Ch 13
Licenses, Permits and General Business Regulations
Ch 14
Mailboxes
Ch 15
Motor Vehicles and Traffic
Ch 17
Small Wireless Facilities
Ch 18
Sewers and Sewage Disposal
Ch 19
Nonstormwater Discharges
Ch 20
Solid Waste
Ch 21
Streets and Sidewalks
Ch 22
Subdivision and Land Development
Ch 23
Stormwater Management
Ch 23 Pt 1
GENERAL PROVISIONS
ยงย 23-101
Repealer; Adoption; Title.
ยงย 23-102
Statement of Findings.
ยงย 23-103
Purpose.
ยงย 23-104
Statutory Authority.
ยงย 23-105
Applicability.
ยงย 23-106
Exemptions and Modified Requirements.
ยงย 23-107
Repealer.
ยงย 23-108
Severability.
ยงย 23-109
Compatibility with Other Ordinances or Legal Requirements.
ยงย 23-110
Financial Security.
ยงย 23-111
Waivers.
ยงย 23-112
Erroneous Permit.
ยงย 23-113
Enforcement and Penalties.
Ch 23 Pt 2
DEFINITIONS
ยงย 23-201
Interpretation.
ยงย 23-202
Definitions.
Ch 23 Pt 3
STORMWATER MANAGEMENT STANDARDS
ยงย 23-301
General Requirements.
ยงย 23-302
Permit Requirements by Other Governmental Entities.
ยงย 23-303
Erosion and Sediment Control.
ยงย 23-304
Site Design Process.
ยงย 23-305
Water Quality and Runoff Volume Requirements.
ยงย 23-306
Infiltration Requirements.
ยงย 23-307
Stream Channel Protection Requirements.
ยงย 23-308
Stormwater Peak Rate Control Requirements.
ยงย 23-309
Calculation Methodology.
ยงย 23-310
Other Requirements.
ยงย 23-311
Other Conveyance and System Design Standards.
Ch 23 Pt 4
STORMWATER MANAGEMENT (SWM) SITE PLAN REQUIREMENTS
ยงย 23-401
General Requirements.
ยงย 23-402
SWM Site Plan Contents.
ยงย 23-403
SWM Site Plan Submission.
ยงย 23-404
SWM Site Plan Review.
ยงย 23-405
Revision of SWM Site Plans.
ยงย 23-406
Resubmission of Inconsistent or Noncompliant SWM Site Plans.
Ch 23 Pt 5
PERFORMANCE AND INSPECTION OF REGULATED ACTIVITIES; FINAL AS-BUILT PLANS
ยงย 23-501
Performance and Inspection of Regulated Activities.
ยงย 23-502
Final As-Built Plans.
Ch 23 Pt 6
FEES AND EXPENSES
ยงย 23-601
Municipality SWM Site Plan Review and Inspection Fees.
ยงย 23-602
Expenses Covered by Fees.
Ch 23 Pt 7
OPERATION AND MAINTENANCE (O&M) RESPONSIBILITIES AND EASEMENTS
ยงย 23-701
General Requirements for Protection, Operation and Maintenance of Stormwater BMPs and Conveyances.
ยงย 23-702
Operation and Maintenance Plans.
ยงย 23-703
Operation and Maintenance Agreements.
ยงย 23-704
Easements and Deed Restrictions.
ยงย 23-705
Other Post-Construction Responsibilities.
ยงย 23-706
Inspection and BMP Operation and Maintenance Requirements (Landowner or Owner's Designee).
Ch 23 Pt 8
PROHIBITIONS
ยงย 23-801
Prohibitions Enumerated.
Ch 23 Pt 9
ENFORCEMENT AND PENALTIES
ยงย 23-901
Public Nuisance.
ยงย 23-902
Right of Entry.
ยงย 23-903
Enforcement.
ยงย 23-904
Suspension and Revocation of Permits and Approvals.
ยงย 23-905
Violations and Penalties.
ยงย 23-906
Appeals.
ยงย 23-907
When Effective.
Ch 24
Taxation; Special
Ch 25
Trees
Ch 26
Water
Ch 27
Zoning
Appendix
Apx A
Annexation of Territory
Apx B
Bond Issues and Loans
Apx C
Franchises and Services
Apx D
Governmental and Intergovernmental Affairs
Apx E
Plan Approval
Apx F
Public Property
Apx G
Sewers
Apx H
Streets and Sidewalks
Apx I
Water
Apx J
Zoning; Prior Ordinances
Table of Disposition of All Ordinances
Ch KO
Table of Disposition of All Ordinances
Table of Disposition of Significant Resolutions
Ch KR
Table of Disposition of Significant Resolutions
arrow_back
print
Print
email
Email
download
Download
share
Share
arrow_forward
Chapter 23
Stormwater Management
ATTACHMENTS
Attachment 1 - Appendix A Natural Hydrology Site Design Process
Attachment 2 - Appendix B West Nile Virus Guidance
Attachment 3 - Appendix C Runoff Coefficients and Curve Numbers
Attachment 4 - Appendix D Stormwater Best Management Practices
Attachment 5 - Appendix E Typical Water Quality Treatment Measures
Attachment 6 - Appendix F Stormwater Management Application and Simplified Approach Exemption Worksheet for Stormwater Management
Attachment 7 - Appendix G Small Project Stormwater Design Guidance
Attachment 8 - Appendix H Conservation Design and Low-Impact Development Site Design
Part 1
GENERAL PROVISIONS
chevron_right
ยงย 23-101
Repealer; Adoption; Title.
chevron_right
ยงย 23-102
Statement of Findings.
chevron_right
ยงย 23-103
Purpose.
chevron_right
ยงย 23-104
Statutory Authority.
chevron_right
ยงย 23-105
Applicability.
chevron_right
ยงย 23-106
Exemptions and Modified Requirements.
chevron_right
ยงย 23-107
Repealer.
chevron_right
ยงย 23-108
Severability.
chevron_right
ยงย 23-109
Compatibility with Other Ordinances or Legal Requirements.
chevron_right
ยงย 23-110
Financial Security.
chevron_right
ยงย 23-111
Waivers.
chevron_right
ยงย 23-112
Erroneous Permit.
chevron_right
ยงย 23-113
Enforcement and Penalties.
chevron_right
Part 2
DEFINITIONS
chevron_right
ยงย 23-201
Interpretation.
chevron_right
ยงย 23-202
Definitions.
chevron_right
Part 3
STORMWATER MANAGEMENT STANDARDS
chevron_right
ยงย 23-301
General Requirements.
chevron_right
ยงย 23-302
Permit Requirements by Other Governmental Entities.
chevron_right
ยงย 23-303
Erosion and Sediment Control.
chevron_right
ยงย 23-304
Site Design Process.
chevron_right
ยงย 23-305
Water Quality and Runoff Volume Requirements.
chevron_right
ยงย 23-306
Infiltration Requirements.
chevron_right
ยงย 23-307
Stream Channel Protection Requirements.
chevron_right
ยงย 23-308
Stormwater Peak Rate Control Requirements.
chevron_right
ยงย 23-309
Calculation Methodology.
chevron_right
ยงย 23-310
Other Requirements.
chevron_right
ยงย 23-311
Other Conveyance and System Design Standards.
chevron_right
Part 4
STORMWATER MANAGEMENT (SWM) SITE PLAN REQUIREMENTS
chevron_right
ยงย 23-401
General Requirements.
chevron_right
ยงย 23-402
SWM Site Plan Contents.
chevron_right
ยงย 23-403
SWM Site Plan Submission.
chevron_right
ยงย 23-404
SWM Site Plan Review.
chevron_right
ยงย 23-405
Revision of SWM Site Plans.
chevron_right
ยงย 23-406
Resubmission of Inconsistent or Noncompliant SWM Site Plans.
chevron_right
Part 5
PERFORMANCE AND INSPECTION OF REGULATED ACTIVITIES; FINAL AS-BUILT PLANS
chevron_right
ยงย 23-501
Performance and Inspection of Regulated Activities.
chevron_right
ยงย 23-502
Final As-Built Plans.
chevron_right
Part 6
FEES AND EXPENSES
chevron_right
ยงย 23-601
Municipality SWM Site Plan Review and Inspection Fees.
chevron_right
ยงย 23-602
Expenses Covered by Fees.
chevron_right
Part 7
OPERATION AND MAINTENANCE (O&M) RESPONSIBILITIES AND EASEMENTS
chevron_right
ยงย 23-701
General Requirements for Protection, Operation and Maintenance of Stormwater BMPs and Conveyances.
chevron_right
ยงย 23-702
Operation and Maintenance Plans.
chevron_right
ยงย 23-703
Operation and Maintenance Agreements.
chevron_right
ยงย 23-704
Easements and Deed Restrictions.
chevron_right
ยงย 23-705
Other Post-Construction Responsibilities.
chevron_right
ยงย 23-706
Inspection and BMP Operation and Maintenance Requirements (Landowner or Owner's Designee).
chevron_right
Part 8
PROHIBITIONS
chevron_right
ยงย 23-801
Prohibitions Enumerated.
chevron_right
Part 9
ENFORCEMENT AND PENALTIES
chevron_right
ยงย 23-901
Public Nuisance.
chevron_right
ยงย 23-902
Right of Entry.
chevron_right
ยงย 23-903
Enforcement.
chevron_right
ยงย 23-904
Suspension and Revocation of Permits and Approvals.
chevron_right
ยงย 23-905
Violations and Penalties.
chevron_right
ยงย 23-906
Appeals.
chevron_right
ยงย 23-907
When Effective.
chevron_right