Res. 3-1959
3/28/1959
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (W.A. Road sanitary sewer)
Res. 1-1959
7/24/1959
Authorizing, directing and empowering to enter into an agreement with Lanco Incorporated, it successors and assigns for the purpose of constructing or having constructed by said Lanco Incorporated, its successors and assigns, a sewage treatment plant and disposal plant for the purpose of treating and disposing of sewage from such buildings as the said Lanco Incorporated may erect upon the property known as Hankey Farms
Res. 6-1962
5/10/1962
Completing and operating the Sewage Treatment and Disposal Plant designed to serve Hankey Farms Plans and has contracted to complete the said Plant to serve the said plans and to obtain approval of the completed plant by the Department of Health & Sanitation of the State of Pennsylvania
Res. 7-1962
5/10/1962
Completing and placing into operation the sewage treatment and disposal plant designed to serve the Glen Gormley Farms Plan and has contracted with one Sitarik to complete the said plant to serve the said plan and to obtain approval of the completed plant by the Department of Health & Sanitation of the State of Pennsylvania
Ord. 59
6/14/1962
Establishing and acquiring a sewage treatment and disposal plant, located upon property adjacent to Hankey Farms Plans in North Fayette Township as a municipal sewage treatment and disposal work of the said Township
Ord. 60
6/14/1962
Establishing and acquiring a sewage treatment and disposal plant, located on property of the Township located on the easterly side of Oakdale Road and adjacent to the northerly line of land now or formerly of Scott, as a municipal sewage treatment and disposal work of the said Township
Res. 6-1963
9/12/1963
Permitting to establish connection with the presently or to be established sanitary sewer mains of the Township, adjacent and contiguous land owners to the Hankey Farms sanitary sewage district, upon payment of the necessary fees and costs of said connection
Res. 6-1966
1966
Instructing the State Health Department to cancel permit no. 462-S-106 and inform them that the Supervisors wish to proceed with expansion of the Hankey Farms Sewage Treatment Plant under the original permit no. 9427-S
Res. 2-1969
2/28/1969
Accepting official plan for Pennsylvania Sewage Facilities Act 537
Ord. 104
7/2/1971
Approving the construction and estimated costs of certain sanitary sewers to be constructed in the Township of North Fayette by the Moon Township Municipal Authority, Allegheny County, Pennsylvania, and approving the charging of the costs of said construction within the Township of North Fayette by said Authority against the properties benefitted, improved or accommodated thereby according to the benefits method
Res. 2-1971
9/3/1971
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-ways across the properties to allow for the construction of a sanitary interceptor sewer as provided by law
Res. 3-1971
9/14/1971
Intending to construct a trunk-line interceptor sewer from the Oakdale Borough line to a point on or near the intersection of the Oakdale and McKee Roads
Res. 4-1971
10/29/1971
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-ways across the properties to allow for the construction of a sanitary interceptor sewer as provided by law
Res. 4-1972
8/29/1972
Agreeing to include a proposed sewage treatment plant to be constructed to serve the Wickes Corporation Sales Warehouse, in the Township's Act 537 Plan
Res. 1-1974
6/27/1974
Recognizing a subdivision known as the Matthew Vidmar Plan No. 1 and including said plan in the Township's Comprehensive Sewage Plan
Res. 4-1974
12/17/1974
Recognizing a subdivision known as the Thomas Carr Plan and including said plan in the Township's Comprehensive Sewage Plan
Res. 1-1975
3/4/1975
Recognizing a subdivision known as the W.H. McNees UX Plan #1 and including said plan in the Township's Comprehensive Sewage Plan
Res. 3-1975
4/29/1975
Constructing a holding tank at the proposed Stock Car Race Track to be situated at Routes 22 and 30
Res. 5-1975
8/19/1975
Including proposed project of a single residence sewage treatment plant, James Rahner, 824 Steuben Street, in the Act 537 Plan of the Township of North Fayette
Res. 6-1975
9/9/1975
Permitting the construction of a holding tank on the property of Mr. Louis Nardi
Ord. 126
1/13/1976
Authorizing the construction of an interceptor sewer and certain branch interceptor sewers along the Montour Run Creek in North Fayette Township from a point near the airport parkway at the intersection of the Moon Township interceptor sewer to a point on or near the Montour Industrial Park and branch interceptor sewers extending generally to the Westbury Sewerage Plant, the Redwood Estates Sewerage Plant and the Virginia Hills Sewerage Plant
Res. 1-1976
3/9/1976
Acquiring rights-of-way for the construction of sanitary sewers across private property as set forth in the laws of the Commonwealth of Pennsylvania
Ord. 130
4/1/1976
Approving the construction and estimated costs of certain sewers to be constructed in the Montour Run Area of the Township of North Fayette by the Township as its sewer construction project for its sewer system and approving the charging of the costs of construction within the Township of North Fayette against the properties benefitted, improved or accommodated thereby according to the benefits method
Res. 2-1976
4/13/1976
Acquiring rights-of-way for the construction of sanitary sewers across private property as set forth in the laws of the Commonwealth of Pennsylvania
Res. 4-1976
4/13/1976
Authorizing to execute on behalf of the Township the license agreement between the Motour Railroad Company and the Township of North Fayette, covering sewer line longitudinal occupation and crossing under the track and right-of-way of the Company
Res. 5-1976
4/27/1976
Recognizing the subdivision known as the Lewis Plan and hereby includes the said subdivision into the Township's comprehensive plan and the plans as provided
Res. 12-1976
8/10/1976
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Alan Scheers)
Res. 13-1976
8/31/1976
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Gary C.Lowry)
Res. 14-1976
11/9/1976
Constructing a holding tank on the property of Dupont Company on Willow Street
Res. 15-1976
12/21/1976
Constructing a holding tank on the property of Mr. Andreini to be known as the Red Fox Bar and Restaurant near Montour Church Road
Res. 1-1977
1/25/1977
Approving and accepting a common intercepting sewer to be situated along with main branch of Robinson Run and separate collection systems in each of the participating municipalities, as presented in the Robinson Run Wastewater Management Facilities Plan
Res. 6-1977
8/30/1977
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Individual 1.459 Ac. Tract)
Res. 7-1977
9/6/1977
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Phillips Subdivision)
Res. 1-1978
3/14/1978
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Charlier residence)
Ord. 127
4/1/1978
Approving the Consulting Engineer's Report with regard to the Township's Sewer Construction Project
Res. 4-1978
4/4/1978
Executing license agreement with the Montour Railroad Company to permit construction of sanitary sewers on company right-of-way
Res. 8-1978
5/13/1978
Acquiring rights-of-way for the construction of sanitary sewers across private property as set forth in the laws of the Commonwealth of Pennsylvania
Res. 5-1978
5/16/1978
Constructing holding tanks at the corner of Route 978 and Gamble Road
Res. 7-1978
6/6/1978
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Proposed Green Residence)
Ord. 143
7/25/1978
Authorizing the construction of an interceptor sewer along the Montour Run Creek in North Fayette Township from a point west of Mahoney Road to a point in or near the Village of Enlow, and from a point in or near the Village of Enlow to a point in or near the Village of Imperial
Res. 10-1978
9/12/1978
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Davis Plan)
Res. 9-1978
9/12/1978
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Anthony Pacella)
Res. 11-1978
9/19/1978
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality
Res. 3-1979
1/23/1979
Constructing a sanitary sewer from a point extending from the North Branch interceptor sewer to a point up to and through Gamble Road in the Township of North Fayette
Res. 4-1979
3/27/1979
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Padgelek)
Res. 7-1979
5/8/1979
Constructing holding tanks at 91 Laurel Road
Res. 8-1979
5/22/1979
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Wittengale)
Res. 9-1979
5/22/1979
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (George R. Cook)
Res. 6-1980
6/10/1980
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Mobile Home Park)
Res. 10-1980
9/9/1980
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Nicholson residence)
Res. 7-1980
9/9/1980
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Fayette Commons)
Res. 9-1980
9/9/1980
Granting permission to K-D Enterprises to build a sanitary sewer along the Montour Church Road
Res. 8-1980
9/9/1980
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (R.J. Dalby single residence)
Res. 11-1980
10/14/1980
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (John/Wanda Vettorel)
Res. 12-1980
10/14/1980
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Arthur F. Scaff)
Res. 8-1981
1/27/1981
Condemning a certain sanitary sewer right-of-way on the property of Helen Drugmand
Res. 3-1981
2/24/1981
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (John N. Hall residential plan)
Res. 5-1981
5/12/1981
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Crowley single residence)
Res. 4-1981
5/12/1981
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Westinghouse Productivity Center)
Res. 10-1981
7/14/1981
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Quaker State Oil)
Res. 9-1981
7/14/1981
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Howard Fisher)
Res. 11-1981
8/11/1981
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Newnam Garden Apartments)
Res. 15-1981
8/25/1981
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (A.W. Sadeikis)
Res. 15-1981(2)
8/25/1981
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (A.W. Sadeikis)
Res. 22-1981
11/10/1981
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Plan of A.W. Saveikis)
Res. 23-1981
11/10/1981
Constructing holding tanks at Robb Hill Road
Res. 3-1982
5/11/1982
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Robinson Run Watershed)
Res. 4-1982
7/27/1982
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Redwood Estates Mobile)
Res. 7-1982
10/12/1982
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Hawthorne Manor)
Res. 6-1983
6/14/1983
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Hawthorne Manor)
Res. 11-1983
9/13/1983
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality
Res. 1-1984
1/24/1984
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-way across the properties to allow for the construction of sewers and water lines
Res. 5-1984
5/8/1984
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Hankey Farms East)
Res. 7-1984
6/5/1984
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Crucible Compaction Metals)
Res. 8-1984
6/26/1984
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Walden Woods Phase VI)
Res. 10-1984
6/26/1984
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Timberglen-Sollinger Tract)
Res. 9-1984
6/26/1984
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Timberglen Phase II)
Res. 2-1985
2/19/1985
Releasing that property situated adjacent to the Montours Church and known as the Davis parcel into the Robinson Township Municipal Authority sewer district for the purpose of sewering the proposed Great Eastern Equipment and Electronic Mart with public sewers, the Board of Supervisors of North Fayette Township
Res. 9-1985
7/23/1985
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Enlow area sanitary sewer)
Res. 10-1985
8/20/1985
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (DeSantis Plan of Lots)
Res. 11-1985
9/24/1985
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (Connection Control Plan for 1985)
Res. 2-1986
2/11/1986
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Timberglen Sollinger Tract)
Res. 1-1986
2/11/1986
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Timberglen Phase II)
Res. 3-1986
2/11/1986
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Walden Woods Phase VI)
Res. 4-1986
2/25/1986
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality the Planning Module for land development to be known as "Enlow Area Sanitary Sewer (Revised)"
Res. 6-1986
4/8/1986
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-way across properties to allow for the construction of sewers and water lines in the Enlow/Montour Run area
Res. 9-1986
6/10/1986
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Hawthorne Manor Phase III)
Res. 10-1986
8/12/1986
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Pittsburgh International Industrial Park)
Res. 16-1986
12/9/1986
Authorizing the appropriate officers of North Fayette Township to execute an agreement relinquishing the right-of-way condemned through the land of Joyce L. Beck in consideration of her grant of an alternative right-of-way for a sanitary sewer line
Res. 3-1987
2/24/1987
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Steuvenville Pike Sewer)
Res. 2-1987
2/24/1987
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Evergood Bake Shop)
Res. 7-1987
4/14/1987
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Donna Brown)
Res. 13-1987
5/27/1987
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (North Branch Robinson Run Trunk Sewer Extension)
Res. 14-1987
7/24/1987
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Chiri Plan No. 1)
Res. 18-1987
8/25/1987
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Route 30 Area Sewer Extension)
Res. 6-1988
1/26/1988
Authorizing the appropriate officers of North Fayette Township to execute agreements relinquishing certain rights-of-way condemned during the Enlow Sewer Project in consideration of the grants by the affected condemnees of alternative rights-of-way for sanitary sewer lines
Res. 7-1988
2/9/1988
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Gary Cruise)
Res. 4-1988
4/26/1988
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the "Official Plan" of the municipality. (Metro Mall)
Res. 15-1988
5/10/1988
Authorizing and directing the Township Solicitor to commence eminent domain proceedings by filing a declaration of taking for the purpose of condemning a sewer line right-of-way through the property of Walter B. Sadauskas and Beverly a Sadauskas, his wife
Res. 18-1988
12/13/1988
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-ways across the properties to allow for the construction of a sewer from a point opposite the Mckee School in North Fayette Township to the Hankey Farms Treatment Plant
Res. 12-1989
7/11/1989
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Robert E. Himmelrich)
Res. 14-1989A
9/12/1989
Approving for acceptance as public streets those certain streets and improvements contained therein in the Walden Woods Plan of lots situate in North Fayette Township
Res. 15-1989
9/12/1989
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-ways across the properties to allow for the construction of a sewer from a point opposite the McKee School in North Fayette Township to the Hankey Farms Treatment Plant
Res. 22-1989
11/28/1989
Authorizing the filing of a declaration of taking for the securement of an easement and right-of-way across the property below listed to allow for the construction of a sewer from a point starting at the westerly 25 foot right-of-way along U.S. Route 30 on the property line between Ergen Real Estate Corp. And cook across the property of Ergen Real Estate Corp
Res. 7-1990
4/10/1990
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Tonidale Amoco)
Res. 13-1990
5/22/1990
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Plan" of the municipality. (Ralph K. Davis)
Ord. 255
8/11/1992
Providing for and regulating the accumulation, investment, and expenditure of funds in preparing plans for a sewage disposal system, and for the construction, improvement, or replacement of the sewage disposal system located within the Township and permits periodic transfers to the general fund for operating purposes as needed
Res. 6-1993
4/13/1993
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Molinaro Manor)
Res. 14-1993
8/10/1993
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (McKee Road sanitary sewer)
Res. 13-1993
8/10/1993
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-way across the carnahan property described below to allow for the construction of a sanitary sewer
Res. 18-1993
9/14/1993
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (New World Sewer Extension)
Res. 20-1993
10/12/1993
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (Brooktree Plan of Lots)
Res. 26-1993
12/21/1993
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-ways across the property to allow for the construction of a sanitary sewer herein referred to as the Fannie Street Sewer Extension
Res. 3-1994
6/28/1994
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Timberglen Phase 6)
Res. 4-1994
7/13/1994
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Metro Property)
Res. 8-1994
9/27/1994
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Brockettee Phase II and III)
Res. 2-1995
3/28/1995
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Carolyn Drive Sanitary Sewer)
Res. 4-1995
3/28/1995
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Cal Hollow Sanitary Sewer)
Res. 6-1995
4/11/1995
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Crossroads Church Sanitary Sewer)
Res. 10-1995
7/11/1995
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (K.J. Gratkie Plan of Lots)
Res. 12-1995
7/25/1995
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (Metro Property-Phase II)
Res. 17-1995
11/14/1995
Authorizing the filing of declaration of taking for the securement of easements and rights-of-way across the Bantikou property described below to allow for the construction of a sanitary sewer
Res. 20-1995
12/12/1995
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (Santiago Road Sanitary Sewer)
Res. 1-1996
1/23/1996
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-way across the North Star Coal Company property to allow for the construction of a sanitary sewer
Res. 2-1996
2/13/1996
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Penn Lincoln Center)
Res. 20-1996
11/12/1996
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (Abundant Life Church Tng Center)
Res. 2-1997
2/11/1997
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Santiago Area Sanitary Sewers)
Res. 10-1997
9/23/1997
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Robinson Town Centre-Phase II)
Res. 16-1997
10/14/1997
Adopting and submitting to the Department of Environmental Resources for its approval as a revision to the Official Sewage Plan of North Fayette Township. (J.B. Herron Farm plan of lots)
Res. 17-1997
11/25/1997
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-way across properties owned by the following: Ronald and Marlene D'Amico to allow for the construction of a storm sewer
Res. 3-1999
4/27/1999
Authorizing the filing of a declaration of taking for the securement of easements and rights-of-way across properties by Harry E. and George E. Kehm and Frieda Lutz to allow for the construction of a sanitary sewer
Res. 16-2001
10/4/2001
Authorizing the filing of a declaration of taking for the securement of easement and right-of-way across property owned by Sidcon South, Inc., Max Rozum, Jr. and Carol K. Rozum, John R. King, III, and Allegheny Neuropsychiatric Institute described below to allow for the construction of a sanitary sewer
Res. 8-2003
9/9/2003
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Kenneth Gratkie)
Res. 1-2004
1/13/2004
Authorizing the proper officers of the Township to execute the Allegheny County Health Department's Administrative Consent Order
Res. 4-2004
2/24/2004
Adopting and submitting to the Department of Environmental Protection for its approval as a revision to the "Official Sewage Facilities Plan" of the municipality. (Fayette Farms)
Res. 13-2006
2006
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Plan" of the municipality. (HDR Engineering)
Res. 4-2008
4/8/2008
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality. (PTI Dormitory Buildings and Clubhouse)
Res. 1-2009
1/13/2009
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Plan" of the municipality
Res. 5-2012
2/14/2012
Authorizing the condemnation, through the use of eminent domain, for acquisition of legal rights-of-way of certain property portions of the Bateman Road Area Sanitary Sewerline Extension Project, for the purpose of constructing the necessary sewer lines, and authorizing, empowering and directing the proper officers of the Township and its Solicitor to take such lawful actions as necessary for said condemnation, to create necessary documents, to institute any attendant proceedings and to have authority to offer just compensation, if any
Res. 1-14
1/6/2014
Amending sewer rate schedule and providing for sewer rate charges for metered and unmetered sanitary sewer system users
Res. 4-14
1/28/2014
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Vasselo Plan of Lots)
Res. 5-14
2/25/2014
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Pittsburgh Botanic Garden - Bayer Welcome Center and Farmstead)
Res. 8-14
2/25/2014
Adopting and accepting for public dedication as-built sanitary sewer lines as constructed in the Point West Plan of Lots, Phase 9, Phase 10, Phase 11, Phase 13A, and Phase 13
Res. 19-14
6/24/2014
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Quattlebaum Plan of Subdivision)
Res. 20-14
7/17/2014
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Pointe West Plan of Lots, Phases 8, 12B, 14 and 15)
Res. 23-14
8/26/2014
Accepting for public dedication certain as-built storm sewers and associated sewer easements as constructed in the Seabright Plans of Lots
Res. 24-14
8/27/2014
Accepting for public dedication certain as-built sanitary sewers and associated sewer easements as constructed in the Seabright Plans of Lots
Res. 26-14
8/27/2014
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (113 Sturgeon Street)
Res. 15-15
8/25/2015
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Steubenville Senior Residential Development)
Res. 20-15
11/10/2015
Authorizing the Township to enter into an interim consent order and agreement with the Allegheny County Health Department concerning alleged sanitary sewer overflows
Res. 21-15
11/10/2015
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Fayette Farms)
Res. 3-16
3/22/2016
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Tonidale Comfort Inn & Suites)
Res. 4-16
4/12/2016
Adopting and accepting for public dedication certain as-built sanitary sewer lines as constructed pursuant to the Little-Tropeck sanitary sewer extension
Res. 10-16
9/27/2016
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Princeton Place PRD)
Res. 12-16
11/8/2016
Accepting for public dedication certain as-built sanitary sewers and associated easements, as constructed in the Bright Oaks PRD, Phases 1 and 2
Res. 11-17
6/13/2017
Authorizing the condemnation, through the use of eminent domain, for acquisition of legal rights-of-way of certain properties along the Bateman Road-Logan Road Sanitary Sewerline Extension Project area, for the purpose of constructing the necessary sewer lines, and authorizing, empowering and directing the proper officers of the Township and its Solicitor to take such lawful actions as necessary for said condemnations, to create necessary documents, to institute any attendant proceedings and to have authority to offer just compensation, if any
Res. 18-17
11/14/2017
Adopting and submitting to the Department of Environmental Protection for its approval a revision to the "Official Sewage Facilities Plan" of the municipality (Meadow View Plan of Lots)
Res. 9-18
5/8/2018
Authorizing the condemnation, through the use of eminent domain, for acquisition of legal rights-of-way of certain properties along the Bateman Road Sanitary Sewerline Extension Project area, for the purpose of constructing the necessary sewer lines, and authorizing, empowering and directing the proper officers of the Township and its Solicitor to take such lawful actions as necessary for said condemnations, to create necessary documents, to institute any attendant proceedings and to have authority to offer just compensation, if any
Res. 11-18
5/22/2018
Accepting for public dedication certain as-built sanitary sewers and associated easements, as constructed in the Fayette Farms PRD, Phase Nos. 1, 2-A1, 2-A2, 2-C, 2-C-2, 3-C, 4, 5, 7 and 8
Res. 27-18
11/13/2018
Accepting for public dedication certain as-built sanitary sewers and associated easements, as constructed in the Princeton Place PRD, Phase 1
Res. 11-19
3/26/2019
Accepting for public dedication those certain "as built" sanitary sewers and associated sewer easements, as constructed in Pointe West — Phase 12B plan of lots
Res. 13-19
5/14/2019
Accepting for public dedication those certain "as built" sanitary sewers and associated easements, as constructed in the Bright Oaks PRD, Phase 3
Res. 25-19
9/10/2019
Adopting and accepting for public dedication those certain "as built" sanitary sewer lines as described herein, as constructed in the Canterbury Woods PRD plan, Phase 2
Res. 26-19
9/24/2019
Amending sewer rate schedule 18-1-B by setting forth rates for sewer user charges for metered and unmetered sanitary sewer system users effective October 1, 2019, and restating existing policies
Res. 32-19
11/12/2019
Authorizing the condemnation, through the use of eminent domain, for acquisition of legal rights-of-way of certain properties along the North Road sanitary sewer line extension project area, for the purpose of constructing the necessary sewer lines, and authorizing, empowering and directing the proper Township officers and its solicitor to take such lawful actions as necessary for said condemnations, to create necessary documents, to institute any attendant proceedings, and to have authority to offer just compensation, if any
Res. 8-20
3/24/2020
Authorizing the relinquishment of condemnation proceedings filed for acquisition of legal rights-of-way of certain properties identified as Tax Parcel I.D. Nos. 585-G-6 and 585-H-1 along the North Road sanitary sewer line extension project area, empowering and directing the proper Township officers and its solicitor to take such lawful actions as necessary for relinquishment of said condemnations
Res. 9-20
4/28/2020
Accepting for public dedication those certain "as built" sanitary sewers and associated easements, as constructed in the 2000 Park Lane plan of lots, as recorded at the Allegheny County Department of Real Estate, at PBV 289, page 142 [Tax Parcel No. 497-C-1], and partially within the adjacent revision 1 to RIDC Park plan no. 3, as recorded at PBV 156, page 5, parcel 4 [Tax Parcel No. 497-D-50], to service the 2000 Park Lane properties, LP "Boardwalk I land development plan"
Res. 10-20
4/28/2020
Accepting for public dedication those certain "as built" sanitary sewers and associated easements, as constructed in revision 1 to RIDC Park Plan No. 3, as recorded at PBV 156, page 5, parcel 4 [Tax Parcel No. 497-D-50], to service Summit Park Drive lot 4 Partners LP's "Boardwalk II land development plan"
Res. 21-20
9/22/2020
Authorizing the submission of the sewage facilities planning module for the Burns/Zaslocke Subdivision plan to the Pennsylvania Department of Environmental Protection (DEP), for its approval as a revision to the "Official Sewage Facilities Plan"
Res. 24-20
10/27/2020
Authorizing the submission of the sewage facilities planning module for the Imperial Business Park — Lot 11 & Lot 12 land development to the Pennsylvania Department of Environmental Protection (DEP), for its approval as a revision to the "Official Sewage Facilities Plan"
Res. 28-20
11/24/2020
Accepting for public dedication those certain "as built" sanitary sewers and associated easements, as constructed in the Princeton Place Prd. Phase 2
Res. 04-21
1/12/2021
Adopting and accepting for public dedication that certain "as built" sanitary sewer line as described herein, as constructed pursuant to the Showaker sanitary sewer extension
Res. 09-21
2/22/2021
Accepting for public dedication those certain "as built" sanitary sewers and associated easements, as constructed in the Fayette Farms Prd, Phase No. 11 Plan of Lots
Res. 12-21
3/23/2021
Authorizing the submission of the sewage facilities planning module for the North Fayette Business Park Pnrd Land Development to the Pennsylvania Department of Environmental Protection (DEP), for its approval as a revision to the "Official Sewage Facilities Plan"
Res. 18-21
4/27/2021
Authorizing the submission of the sewage facilities planning module for the Baselj Subdivision Plan to the Pennsylvania Department of Environmental Protection (DEP), for its approval as a revision to the "Official Sewage Facilities Plan"
Res. 25-21
5/11/2021
Accepting for public dedication certain "as built" sanitary sewers and associated easements, as constructed in the Imperial Business Park Revision 3 Plan
Res. 27-21
5/25/2021
Accepting for public dedication those certain "as built" sanitary sewers and associated easements, as constructed in the Fayette Farms Prd, Phase No. 12 Plan of Lots
Res. 40-21
10/12/2021
Authorizing the Township to enter into a consent order and agreement with the Allegheny County Health Department concerning alleged sanitary sewer overloads related to the Township's sanitary sewer system and to authorize the proper officers of the Township to execute the consent order and agreement
Res. 25-22
6/14/2022
Adopting the Act 537 Sewage Facilities Plan Special Study as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette and authorizing the submission of the plan update to DEP by the Township Engineer for approval
Res. 26-22
6/14/2022
Authorizing the submission of the Sewage Facilities Planning Module for the Fayette Farms PRD Plan to the Pennsylvania Department of Environmental Protection (DEP) for its approval as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette
Res. 52-22
9/21/2022
Accepting the rate revision of the Moon Township Municipal Authority as set forth in Resolution 15 of 2022
Res. 59-22
12/13/2022
Authorizing the submission of the Sewage Facilities Planning Module for the Standee Property PRD Plan to the Pennsylvania Department of Environmental Protection (DEP) for its approval as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette
Res. 60-22
12/13/2022
Authorizing the submission of the Sewage Facilities Planning Module for the Pointe West Subdivision Plan to the Pennsylvania Department of Environmental Protection (DEP) for its approval as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette
Res. 09-23
1/24/2023
Authorizing the submission of the Sewer Facilities Planning Module for the North Fayette Bussiness Park – Lot 10 land development to the Pennsylvania Department of Environmental Protection (DEP) for its approval as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette
Res. 22-23
3/28/2023
Authorizing the submission of the Sewage Facilities Planning Module for the Little Subdivision Plan to the Pennsylvania Department of Environmental Protection (DEP) for its approval as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette
Res. 77-23
11/14/2023
Accepting the rate revision of the Moon Township Municipal Authority as set forth in Resolution No. 8-2023
Res. 78-23
11/14/2023
Accepting the rate revision of the Allegheny County Sanitary Authority as set forth in Resolution No. 2021-10-02
Res. 82-23
12/12/2023
Accepting for public dedication those certain "as built" sanitary sewers and associated easements as constructed in the Ashford North Fayette Business Park, Phase No. 1 Plan of Lots
Res. 09-24
1/9/2024
Authorizing the submission of the Sewage Facilities Planning Module for the Highland Ridge Townhomes Plan to the Pennsylvania Department of Environmental Protection (DEP) for its approval as a revision to the "Official Sewage Facilities Plan" of the Township of North Fayette