Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Canton, PA
Washington County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 3-2001, 4/11/2001, § 1.1]
As used in this Part, the following terms shall have the meanings indicated, unless a different meaning clearly appears from the context:
IMPROVED PROPERTIES
Any property located within the Township upon which there is erected a structure intended for continuous or periodic habitation, occupancy or use by human beings.
LATERAL
(1) 
Part of a water system extending from a main to the curb line or if there shall be no curb line, extending to the property line; or,
(2) 
If no such lateral shall be provided, lateral shall mean that portion of, or place in, a main which is provided for connection of any building main.
MAIN
A pipe or conduit constituting a part of the water system used or usable for water distribution purposes.
MOBILE HOME PARK
Any contiguous parcel or tract of land under single ownership, used or intended to be used for the placement of two or more mobile homes for nontransient use, together with the required improvements and facilities upon the land, whether or not consideration or rental is required for the use of the parcels or facilities thereon.
OWNER
Any person vested with ownership, legal or equitable, sole or partial of any improved property.
PERSON
Any individual, partnership, company, association, society, trust, corporation, municipality, municipal authority or other group or entity.
TOWNSHIP
Canton Township, Washington County, Pennsylvania.
WATER PROJECT 2000
Community water system to be supplied to the following locations within the Township: Route 844 to the Township line, Smiley Road, Ward and Angott Road, South Hewitt Road, McClay Road, Haney Road, Hains Road, Miller Road, and West Wylie Avenue to South Hewitt also referred to as the "project."
WATER SYSTEM
All facilities for providing, the production, transporting, transmission, storage and distribution of water in the Township of Canton owned by the Pennsylvania American Water Company (PAWC) for maintenance, operation utilized for human use and consumption wherever situated, leased to or under contract or agreement with the Township for its operation and use for Water Project 2000.
WATER USE RATE
Rental charged by PAWC to all properties using the water system for the cost of transporting and supplying water.
[Ord. 3-2001, 4/11/2001, §§ 2.1 — 2.3]
1. 
The project shall be known as Water Project 2000.
2. 
The Board of Supervisors shall contract with PAWC to provide for the design, construction, location, financing, and administration of the project.
3. 
To effectuate the project, the Board of Supervisors are authorized to transfer to PAWC any easements necessary for construction and maintenance of the water system within and upon property owned by the Township and within existing Township highway, street, road and alley right-of-ways. Upon completion of the project, the Township may convey the water system to PAWC.
[Ord. 3-2001, 4/11/2001, §§ 3.1 — 3.7]
1. 
All owners of Improved Property with a dwelling unit, principal building, mobile home park, or occupied structure within 150 feet from a water pipeline presently being constructed shall connect to the water system within 90 days after notice to the owner from the Township to make such connection; subject to such limitations, restrictions, and exceptions provided herein. The owner shall connect to the water system at the owner's expense in the manner required by the rules and regulations of PAWC.
2. 
All owners of improved property with a dwelling unit, principal building, mobile home park, or occupied structure which shall be constructed or erected within 150 feet from a water pipeline of this water system shall connect to the water system within 90 days after notice to the owner from the Township to make such connection; subject to such limitations, restrictions, and exceptions provided herein. The owner shall connect to the water system at the owner's expense in the manner required by the rules and regulations of PAWC. Occupancy permits under the Township's zoning, subdivision, or building codes and ordinances may not be issued before the connection is properly completed and approved in writing by an agent of PAWC.
3. 
All owners and occupants of improved property connected to the water system shall use the water system's water for human consumption. Those industries and farms with their own on-lot source of water may continue to use same for uses other than human consumption, but are required to use the water system to provide water for human consumption. No owner or occupant of improved property may cross-connect the water system with any nonpublic water source or system.
4. 
No person shall uncover, connect, with, make any opening into, or use, alter, or disturb in any manner any part of the water system unless the owner of the improved property shall first obtain a permit in writing from the Township.
5. 
Every person connecting to the water system shall give the Township at least 24 hours' notice of the time when the actual connection will be made so that PAWC may supervise and inspect the connection and perform necessary testing. At the time of connection the owner of the improved property shall permit the PAWC representative conducting the inspection full and complete access to all water facilities in each building and in and about all parts of the improved property. No water connection line shall be covered or in any way concealed until it has been inspected and approved by PAWC.
6. 
Each principal building or dwelling shall be connected separately and independently to the water system. Grouping more than one structure onto one connection shall not be permitted except by written consent of the Township. Mobile home park owners shall install pipelines to connect each mobile home within the park. All connections are subject to the rules, regulations and conditions prescribed by the Township and PAWC.
7. 
If required, any person connecting to the water system shall furnish satisfactory evidence to the Township that any tapping (or connection) fee which may be charged and imposed by the Township against the owner of each improved property to a main has been paid or is in compliance as stated in § 26-105, "Fees," of this Part.
[Ord. 3-2001, 4/11/2001, §§ 4.1 — 4.4; as amended by Ord. 2-2002, 5/15/2002, § 1]
1. 
In the event the owner of an improved property shall neglect or refuse to connect with and use the water system within 90 days after notice to do so as set forth herein at § 26-103, Subsection 1, the Township Supervisors or their agents, may enter upon the property and construct, the connection.
2. 
In such case the Township Supervisors shall, upon completion of the work, send an itemized bill for the cost of the connection to the owner of the improved property which bill shall be payable forthwith.
3. 
In case of neglect or refusal by the owner of the Improved Property to pay the bill within six months after the date of completion of construction by the Township Supervisors, the Supervisors shall promptly file a municipal lien for the cost of construction, which shall be subject in all respects to the general law provided for filing and recovery of municipal liens.
4. 
Every person who shall violate this Part, upon conviction thereof in an action brought before a Magisterial District Justice in the manner provided for the enforcement of summary offenses under the Pennsylvania Rules of Criminal Procedure, shall be sentenced to pay a fine of not more than $1,000 plus costs and, in default of payment of said fine and costs, to a term of imprisonment not to exceed 90 days. Each seven days that a violation shall continue shall be deemed to be a separate offense and shall be assessed as such.
[Amended at time of adoption of Code]
[Ord. 3-2001, 4/11/2001, §§ 5.1 — 5.4; as amended by Ord. 5-2001, 6/13/2001, § 5.2]
1. 
The Board of Supervisors are authorized by resolution to advance to PAWC, on behalf of the owners of Improved Property within the project, up to the sum of $260,249 for the cost of construction of Water Project 2000.
2. 
The Township is authorized to pay to Malone Ridge Water Project participants on behalf of the owners of improved property within the water system up to the sum of $1,527.81 per parcel; provided, that said sum was paid by them as an assessment for the Malone Ridge booster station. This payment shall be recouped by the Township from the owners of improved property through tapping fees charged to each owner of improved property who connects to the water system. The procedure for distribution of payments to the Malone Ridge Water Project Participants shall be determined by resolution of the Board of Supervisors.
3. 
Tapping fees shall be determined by the Township, with the advice of PAWC, when the final cost of the project is computed, but it is presently estimated that the fees are to be as follows:
A. 
Tapping fee: $950 per improved property.
4. 
Fees shall be payable pursuant to the following terms and conditions:
A. 
Water use and line connection rates shall be set by PAWC and shall not exceed those charged to all other PAWC consumers in Washington County;
B. 
Tapping Fees for structures existing as of the date of this Part shall be payable to the Township Treasurer in the following manner:
(1) 
One lump sum for the total amount due and owing on or before the date of the connection permit; or,
(2) 
Semi-annual payments of 25% of the total amount due over a two-year period with 0% the first year, at the start of the second year anniversary date an interest rate of 6% per annum shall apply; or,
(3) 
Quarterly payments in the amount of 1/4 of the total amount due over a two year period with 0% the first, year, at the start of the second year anniversary date an interest rate of 6% per annum shall apply; or,
(4) 
Monthly payments in the amount of 1/24 the total amount due over a two-year period with 0% the first year, at the start of the second year anniversary date an interest rate of 6% per annum shall apply; or,
(5) 
One payment a year over a two-year period with 0% the first year, at the start of the second year anniversary date an interest rate of 6% per annum shall apply.
(6) 
Person(s), owner(s) selecting incremental payment schedules that make payment in full within the first 90 days of the contractual obligation shall have a 2% discount applied to the remaining final balance.
C. 
Any owner of Improved Property intending to pay the assessment and tapping fees in installments must execute a written installment payment agreement with the Township on or before the date of the connection permit.
D. 
Interest upon installment payments shall be charged at the rate of 6% per annum commencing one year after the date of the connection permit. All payments must be completed within 24 months after the date of the connection permit per § 26-105 of this chapter.
E. 
In the case of default in the payment of any installment or interest for a period of 60 days after the same shall become due, the entire balance due with accrued interest thereon shall become accelerated and immediately due; and the Township Solicitor shall proceed to collect the same under the general laws relating to collection of municipal claims together with allowable attorney's fees, costs and expenses.
F. 
Any owner objecting to the amount of the assessment as determined by the Township under the formula set forth herein above may request a board of view in accordance with the Second Class Township Code, 53 P.S. § 67613.
G. 
At the time that one or more new structures are constructed or erected on property that is currently improved property or unimproved property, a separate tapping fee must be paid in full for each of the following as a condition of receiving a permit to connect to the water system:
(1) 
A building under one roof, owned or leased by one party, and occupied as one dwelling unit or as one business.
(2) 
Each unit of a multi-unit building in which each unit is used and occupied as a dwelling for one family or the premises for one business, even though the water closet and other plumbing fixtures may be used in common.
(3) 
Each apartment, office or suite of offices located in a building having several such apartments, offices, or suites of offices and using in common one or more halls and one or more means of entrance.
(4) 
Each mobile home in a mobile home park.
H. 
No new construction tapping fee may be paid in installments under Subsection 4B herein.
I. 
All costs and expenses of construction of a building main and all costs and expenses of connections of a building main to a main shall be borne by the owner of the improved property to be connected; and such owner shall indemnify and shall save harmless the Township of Canton from all loss or damage that may be occasioned directly or indirectly, as a result of construction of a building main or connection of a building main to a main.
J. 
A building main shall be connected to a main at the place designated by the Township and where, if applicable, the lateral is provided. A smooth, neat joint shall be made and the connection of a building main to the lateral shall be made secure and watertight.
K. 
Any owner eligible for an agricultural assessment, exemption as determined by the Second Class Township Code, 53 P.S. § 1241, must apply for same and provide the Township with a certification of the exemption within 60 days after notice from the Township to connect. Applications for same may be obtained at any time from the Township office. Thereupon the owner shall not be liable for the cost of installation of the water lines provided that the owner or occupants do not connect to the water system and do not change the use of the land.
[Ord. 3-2001, 4/11/2001, §§ 6.1 — 6.3]
1. 
No building main shall be covered until it has been inspected and approved by the PAWC. If any part of a building main is covered before so being inspected and approved, it shall be uncovered for inspection, at the cost and expense of the owner of the improved property to be connected to a main.
2. 
Every excavation for a building main shall be guarded adequately with barricades and lights to protect all persons from damage and injury. Any street, sidewalk or other public property disturbed in the course of installation of a building main shall be restored, at the cost and expense of the owner of the improved property being connected, in a manner satisfactory to the Township.
3. 
The Township reserves the right to adopt from time to time, additional rules and regulations it shall deem necessary and proper relating to connections with a main and with the water system, which additional rules and regulations to the extent appropriate, shall be and shall be construed as part of this Part.
[Ord. 4-2006, 6/20/2006, § 1]
This Part shall be known and cited as the Township of Canton "Mandatory Water Line Connection Ordinance."
[Ord. 4-2006, 6/20/2006, § 2]
The purpose of this Part is to require all abutting owners of property in Canton Township to connect with and use a water supply system provided by a community water system and in the alternative to authorize Canton Township to make such connection and to recover the costs thereof in case of neglect or refusal of the owners to do so.
[Ord. 4-2006, 6/20/2006, § 3]
COMMUNITY WATER SYSTEM
Any system, whether publicly or privately owned, for the supply of water.
SERVICE LINE
The water line on the property of an abutting property owner from the water distribution line to the location of the meter of an abutting property owner.
WATER METER
A device for measuring the quantity of water used, to be installed by a community water system, on the premises of the abutting property owner.
WATER SUPPLY SYSTEM
The water distribution system constructed and operated by a community water system and to include the acquisition of all necessary lands, easements and rights-of-way and the construction of a water works system including pumping stations, water distribution system, fire hydrants, valves and appurtenances thereto.
[Ord. 4-2006, 6/20/2006, § 4]
Each owner of any house, building, structure or property used for human occupancy, employment, recreation, or other purpose situated within the Borough and within 200 feet of any street, alley or right-of-way in which there has been constructed a water supply system shall connect to such water supply system within 60 days after the date of notice to do so given in the manner prescribed by law by the Board of Supervisors of the Township of Canton or their agent.
[Ord. 4-2006, 6/20/2006, § 5]
Unless the cost of the connection, as hereinafter defined, is borne by an agency of the state or federal government, pursuant to law and regulation, then the cost of connection shall be at the sole expense of the owner of any property for which connection is mandatory.
[Ord. 4-2006, 6/20/2006, § 6]
In case any owner of property shall neglect or refuse to connect with said water system for a period of 60 days after notice to do so has been served upon him by the Township or their agents, either by personal service or by registered mail, the Township or its agents may enter upon such property and construct such connection. In such case, the Township shall forthwith, upon completion of the work, send an itemized bill of the costs of construction of such connection to the owner of the property to which connection has been made, which bill shall be payable forthwith or the Township may authorize the payment of the cost of construction of connections in equal monthly installments, to bear interest at a rate not exceeding 7% per annum, for a period not to exceed one year.
[Ord. 4-2006, 6/20/2006, § 7]
The cost of construction of the connection shall include the cost of construction of the service line on the property of the abutting owner for the distribution line and all necessary connections and equipment.
[Ord. 4-2006, 6/20/2006, § 8]
The cost of construction of the connection shall be payable at the office designated from time to time by the Council either in whole within 30 days, or in equal monthly installments with interest at the rate of 7% per annum from the date of completion of construction. In case of default in the payment of any installment and interest for a period of 60 days after the same shall become due, the entire cost of construction of connection and accrued interest shall become due; and, the Borough Solicitor shall proceed to collect the same under the general laws relating to the collection of municipal claims.
[Ord. 4-2006, 6/20/2006, § 9]
Each owner of any premises set forth in this Part hereof shall make application in writing to a community water system for water service. Such application shall be in such form as the community water system shall designate.
[Ord. 4-2006, 6/20/2006, § 10]
No person shall maliciously, wilfully, or negligently break, damage, destroy, uncover, deface, or tamper with any structure, appurtenance, or equipment which is a part of a community water system.
[Ord. 4-2006, 6/20/2006, § 11]
Any duly authorized employees or agents of the Township or a community water system bearing proper credentials and identification shall be permitted to enter upon all properties for the purpose of inspection, observation, measurements, sampling and testing in accordance with the provisions of this Part.
[Ord. 4-2006, 6/20/2006, § 12]
1. 
No person shall uncover, connect with, make any opening into, or use, alter, or disturb in any manner any part of the water system unless the owner of the improved property shall first obtain a permit in writing from the Township.
2. 
Every person connecting to the water system shall give the Township at least 24 hours' notice of the time when the actual connection will be made so that PAWC may owner of the improved property shall permit the PAWC representative conducting the inspection full and complete access to all water facilities in each building and in and about all part of the improved property. No water connection line shall be covered or in any way concealed until it has been inspected and approved by PAWC.
3. 
Each principal building or dwelling shall be connected separately and independently to the water system. Grouping more than one structure onto one connection shall be permitted except by written consent of the Township. Mobile home park owners shall install pipelines to connect each mobile home within the park. All connections are subject to the rules, regulations and conditions prescribed by the Township and PAWC.
4. 
If required, any person connecting to the water system shall furnish satisfactory evidence to the Township that any tapping (or connection) fee which may be charged and imposed by the Township against the owner of each improved property to a main has been paid or is in compliance as stated in § 26-115 of this Part.
[Ord. 4-2006, 6/20/2006, § 13]
1. 
Any person who violates or permits a violation of this chapter shall, upon conviction in a summary proceeding brought before a Magisterial District Judge under the Pennsylvania Rules of Criminal Procedure, be guilty of a summary offense and shall be punishable by a fine of not more than $1,000, plus costs of prosecution. In default of payment thereof, the defendant may be sentenced to imprisonment for a term not exceeding 90 days. Each day or portion thereof that such violation continues or is permitted to continue shall constitute a separate offense, and each section of this chapter that is violated shall also constitute a separate offense.
[Amended at time of adoption of Code]
2. 
All fines and penalties imposed for violation of any part of this Part shall be paid to the Secretary-Treasurer of Canton Township for the use of the Township. Default in payment of the fine and costs shall make the defendant liable to imprisonment for a term not to exceed 30 days.
3. 
Any person violating any of the provisions of this Part, in addition to becoming liable for a fine and penalty, shall become liable to the Township of Canton for any expense, loss or damage occasioned the Township or a community water system by reason of such violation.