home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Lower Oxford, PA
chevron_right
2023-03-24 *
info
chevron_right
Municipal Code
chevron_right
Chapter 20 Stormwater Management
Foreword
Ch FWD
Foreword
Adopting Ordinance
Ch AO
Adopting Ordinance
Municipal Code
Ch 1
Administration and Government
Ch 2
(Reserved)
Ch 3
(Reserved)
Ch 4
(Reserved)
Ch 5
Code Enforcement
Ch 6
(Reserved)
Ch 7
Fire Prevention and Fire Protection
Ch 8
Floodplain Management
Ch 9
Grading and Excavating
Ch 10
Health and Safety
Ch 11
(Reserved)
Ch 12
(Reserved)
Ch 13
Licenses, Permits and General Business Regulations
Ch 14
Mobile Homes and Mobile Home Parks
Ch 15
Motor Vehicles
Ch 16
(Reserved)
Ch 17
(Reserved)
Ch 18
Sewers and Sewage Disposal
Ch 19
(Reserved)
Ch 20
Stormwater Management
Ch 20 Pt 1
GENERAL PROVISIONS
ยงย 20-101
Short Title.
ยงย 20-102
Statement of Findings.
ยงย 20-103
Purpose.
ยงย 20-104
Statutory Authority.
ยงย 20-105
Applicability.
ยงย 20-106
Exemptions and Modified Requirements.
ยงย 20-107
Repealer.
ยงย 20-108
Severability.
ยงย 20-109
Compatibility With Other Ordinances or Legal Requirements.
ยงย 20-110
Financial Security.
ยงย 20-111
Waivers.
ยงย 20-112
Erroneous Permit.
Ch 20 Pt 2
DEFINITIONS
ยงย 20-201
Interpretation.
ยงย 20-202
Definitions.
Ch 20 Pt 3
STORMWATER MANAGEMENT STANDARDS
ยงย 20-301
General Requirements.
ยงย 20-302
Permit Requirements by Other Governmental Entities.
ยงย 20-303
Erosion and Sediment Control.
ยงย 20-304
Site Design Process.
ยงย 20-305
Water Quality and Runoff Volume Requirements.
ยงย 20-306
Infiltration Requirements.
ยงย 20-307
Stream Channel Protection Requirements.
ยงย 20-308
Stormwater Peak Rate Control Requirements.
ยงย 20-309
Calculation Methodology.
ยงย 20-310
Other Requirements.
ยงย 20-311
Design Standards.
ยงย 20-311.1
Water-Carrying Facilities.
ยงย 20-311.2
Aboveground Storage Facilities.
ยงย 20-311.3
Volume Control.
ยงย 20-311.4
Subsurface Storage Facilities.
Ch 20 Pt 4
STORMWATER MANAGEMENT (SWM) SITE PLAN REQUIREMENTS
ยงย 20-401
General Requirements.
ยงย 20-402
SWM Site Plan Contents.
ยงย 20-403
SWM Site Plan Submission.
ยงย 20-404
SWM Site Plan Review.
ยงย 20-405
Revision of SWM Site Plans.
ยงย 20-406
Resubmission of Inconsistent or Noncompliant SWM Site Plans.
Ch 20 Pt 5
PERFORMANCE AND INSPECTION OF REGULATED ACTIVITIES, AND FINAL AS-BUILT PLANS
ยงย 20-501
Performance and Inspection of Regulated Activities.
ยงย 20-502
Final As-Built Plans.
Ch 20 Pt 6
FEES AND EXPENSES
ยงย 20-601
Municipality SWM Site Plan Review and Inspection Fees.
ยงย 20-602
Expenses Covered by Fees.
Ch 20 Pt 7
OPERATION AND MAINTENANCE (O&M) RESPONSIBILITIES AND EASEMENTS
ยงย 20-701
General Requirements for Protection, Operation and Maintenance of Stormwater BMPs and Conveyances.
ยงย 20-702
Operation and Maintenance Plans.
ยงย 20-703
Operation and Maintenance Agreements.
ยงย 20-704
Easements and Deed Restrictions.
ยงย 20-705
Other Post-Construction Responsibilities.
Ch 20 Pt 8
PROHIBITIONS
ยงย 20-801
Prohibited Discharges.
ยงย 20-802
Prohibited Connections.
ยงย 20-803
Roof Drains and Sump Pumps.
ยงย 20-804
Alteration of BMPs.
Ch 20 Pt 9
ENFORCEMENT AND PENALTIES
ยงย 20-901
Declaration of Public Nuisance; Separate Violations; Right of Future Enforcement.
ยงย 20-902
Right of Entry.
ยงย 20-903
Enforcement.
ยงย 20-904
Suspension and Revocation of Permits and Approvals.
ยงย 20-905
Penalties.
ยงย 20-906
Appeals.
ยงย 20-907
Effective Date.
Ch 21
Streets, Sidewalks and Driveways
Ch 22
Subdivision and Land Development
Ch 23
Swimming Pools
Ch 24
Taxation, Special
Ch 25
(Reserved)
Ch 26
Water
Ch 27
Zoning
Appendix
Ch A
Annexation of Territory
Ch B
Bond Issues and Loans
Ch C
Franchises and Services
Ch D
Governmental and Intergovernmental Affairs
Ch E
Plan Approval
Ch F
Public Property
Ch G
Sewers
Ch H
Streets and Sidewalks
Ch I
Water
Ch J
Zoning; Prior Ordinances
Key to the Disposition of All Ordinances
Ch KO
Key to the Disposition of All Ordinances
arrow_back
print
Print
email
Email
download
Download
share
Share
arrow_forward
Chapter 20
Stormwater Management
ATTACHMENTS
Attachment 1 - Appendix A, Stormwater Mgmt for Small Projects
Attachment 2 - Appendix B, Site Design Process
Attachment 3 - Appendix C, Runoff Coefficients and Curve Numbers
Attachment 4 - Appendix D, West Nile Virus Design Guidance
Part 1
GENERAL PROVISIONS
chevron_right
ยงย 20-101
Short Title.
chevron_right
ยงย 20-102
Statement of Findings.
chevron_right
ยงย 20-103
Purpose.
chevron_right
ยงย 20-104
Statutory Authority.
chevron_right
ยงย 20-105
Applicability.
chevron_right
ยงย 20-106
Exemptions and Modified Requirements.
chevron_right
ยงย 20-107
Repealer.
chevron_right
ยงย 20-108
Severability.
chevron_right
ยงย 20-109
Compatibility With Other Ordinances or Legal Requirements.
chevron_right
ยงย 20-110
Financial Security.
chevron_right
ยงย 20-111
Waivers.
chevron_right
ยงย 20-112
Erroneous Permit.
chevron_right
Part 2
DEFINITIONS
chevron_right
ยงย 20-201
Interpretation.
chevron_right
ยงย 20-202
Definitions.
chevron_right
Part 3
STORMWATER MANAGEMENT STANDARDS
chevron_right
ยงย 20-301
General Requirements.
chevron_right
ยงย 20-302
Permit Requirements by Other Governmental Entities.
chevron_right
ยงย 20-303
Erosion and Sediment Control.
chevron_right
ยงย 20-304
Site Design Process.
chevron_right
ยงย 20-305
Water Quality and Runoff Volume Requirements.
chevron_right
ยงย 20-306
Infiltration Requirements.
chevron_right
ยงย 20-307
Stream Channel Protection Requirements.
chevron_right
ยงย 20-308
Stormwater Peak Rate Control Requirements.
chevron_right
ยงย 20-309
Calculation Methodology.
chevron_right
ยงย 20-310
Other Requirements.
chevron_right
ยงย 20-311
Design Standards.
chevron_right
ยงย 20-311.1
Water-Carrying Facilities.
chevron_right
ยงย 20-311.2
Aboveground Storage Facilities.
chevron_right
ยงย 20-311.3
Volume Control.
chevron_right
ยงย 20-311.4
Subsurface Storage Facilities.
chevron_right
Part 4
STORMWATER MANAGEMENT (SWM) SITE PLAN REQUIREMENTS
chevron_right
ยงย 20-401
General Requirements.
chevron_right
ยงย 20-402
SWM Site Plan Contents.
chevron_right
ยงย 20-403
SWM Site Plan Submission.
chevron_right
ยงย 20-404
SWM Site Plan Review.
chevron_right
ยงย 20-405
Revision of SWM Site Plans.
chevron_right
ยงย 20-406
Resubmission of Inconsistent or Noncompliant SWM Site Plans.
chevron_right
Part 5
PERFORMANCE AND INSPECTION OF REGULATED ACTIVITIES, AND FINAL AS-BUILT PLANS
chevron_right
ยงย 20-501
Performance and Inspection of Regulated Activities.
chevron_right
ยงย 20-502
Final As-Built Plans.
chevron_right
Part 6
FEES AND EXPENSES
chevron_right
ยงย 20-601
Municipality SWM Site Plan Review and Inspection Fees.
chevron_right
ยงย 20-602
Expenses Covered by Fees.
chevron_right
Part 7
OPERATION AND MAINTENANCE (O&M) RESPONSIBILITIES AND EASEMENTS
chevron_right
ยงย 20-701
General Requirements for Protection, Operation and Maintenance of Stormwater BMPs and Conveyances.
chevron_right
ยงย 20-702
Operation and Maintenance Plans.
chevron_right
ยงย 20-703
Operation and Maintenance Agreements.
chevron_right
ยงย 20-704
Easements and Deed Restrictions.
chevron_right
ยงย 20-705
Other Post-Construction Responsibilities.
chevron_right
Part 8
PROHIBITIONS
chevron_right
ยงย 20-801
Prohibited Discharges.
chevron_right
ยงย 20-802
Prohibited Connections.
chevron_right
ยงย 20-803
Roof Drains and Sump Pumps.
chevron_right
ยงย 20-804
Alteration of BMPs.
chevron_right
Part 9
ENFORCEMENT AND PENALTIES
chevron_right
ยงย 20-901
Declaration of Public Nuisance; Separate Violations; Right of Future Enforcement.
chevron_right
ยงย 20-902
Right of Entry.
chevron_right
ยงย 20-903
Enforcement.
chevron_right
ยงย 20-904
Suspension and Revocation of Permits and Approvals.
chevron_right
ยงย 20-905
Penalties.
chevron_right
ยงย 20-906
Appeals.
chevron_right
ยงย 20-907
Effective Date.
chevron_right