Village of Oxford, NY
Chenango County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Board of Trustees of the Village of Oxford 8-4-1987 as L.L. No. 3-1987. Amendments noted where applicable.]
GENERAL REFERENCES

Wastewater Treatment Commission — See Ch. 65.

Water — See Ch. 285.

ARTICLE I
Short Title and Purpose (§ 230-1 — § 230-3) 

ARTICLE II
Definitions (§ 230-4 — § 230-6) 

ARTICLE III
Use (§ 230-7 — § 230-13) 

ARTICLE IV
Private Wastewater Disposal (§ 230-14 — § 230-21) 

ARTICLE V
New Sewers or Sewer Extensions (§ 230-22 — § 230-28) 

ARTICLE VI
Building and Street Laterals (§ 230-29 — § 230-43) 

ARTICLE VII
Inflow (§ 230-44 — § 230-45) 

ARTICLE VIII
Scavenger Wastes (§ 230-46) 

ARTICLE IX
Discharge Restrictions (§ 230-47 — § 230-52) 

ARTICLE X
Discharge Permits and Pretreatment Requirements (§ 230-53 — § 230-58) 

ARTICLE XI
Enforcement and Penalties (§ 230-59 — § 230-67) 

ARTICLE XII
Charges (§ 230-68 — § 230-77) 

ARTICLE XIII
Public Disclosure of POTW Operations (§ 230-78) 

ARTICLE XIV
Conflicts and Applicability (§ 230-79 — § 230-80) 

230a Appendix A 230b Appendix B 230c Appendix C
Article I Short Title and Purpose

§ 230-1 Short title.

§ 230-2 General purpose.

§ 230-3 Specific purposes.

Article II Definitions

§ 230-4 Definitions; word usage.

§ 230-5 Abbreviations.

§ 230-6 Undefined terms.

Article III Use

§ 230-7 Waste disposal unlawful.

§ 230-8 Wastewater disposal unlawful.

§ 230-9 Unlawful private wastewater disposal.

§ 230-10 Connection required.

§ 230-11 Limitation on use.

§ 230-12 Exception to limitations.

§ 230-13 Basis of sewer use requirement.

Article IV Private Wastewater Disposal

§ 230-14 Use where public sewer unavailable.

§ 230-15 Construction permit application.

§ 230-16 Construction permit required; right to inspect.

§ 230-17 Preventing nuisances; rehabilitation required.

§ 230-18 Sanitary operation required.

§ 230-19 Septage removal.

§ 230-20 Direct connection to new public sewers required.

§ 230-21 Additional requirements.

Article V New Sewers or Sewer Extensions

§ 230-22 Proper design.

§ 230-23 New sewers.

§ 230-24 Pipe specifications and installation.

§ 230-25 Testing.

§ 230-26 Final acceptance; guaranties.

§ 230-27 Approved wastewater disposal required for building permit.

§ 230-28 Liability insurance coverage during construction period.

Article VI Building and Street Laterals

§ 230-29 Permit and other requirements.

§ 230-30 Sewer lateral permits.

§ 230-31 General buildings lateral requirements.

§ 230-32 Using existing building laterals.

§ 230-33 Lateral pipe materials.

§ 230-34 Street lateral connections.

§ 230-35 Laterals at and near buildings.

§ 230-36 Sewage lifting.

§ 230-37 Lateral pipe installation.

§ 230-38 Joints.

§ 230-39 Connection and maintenance.

§ 230-40 Inspections.

§ 230-41 Public safety provisions required; restoration of disturbed areas.

§ 230-42 Interior clean-out.

§ 230-43 Costs to be borne by owner.

Article VII Inflow

§ 230-44 New inflow sources prohibited.

§ 230-45 Charges for inflow.

Article VIII Scavenger Wastes

§ 230-46 Discharge prohibited.

Article IX Discharge Restrictions

§ 230-47 General prohibitions.

§ 230-48 Specific prohibitions.

§ 230-49 Modification of limitations.

§ 230-50 Dilution.

§ 230-51 Categorical standards.

§ 230-52 Grease, oil and sand interceptors.

Article X Discharge Permits and Pretreatment Requirements

§ 230-53 Notification to industrial users.

§ 230-54 Monitoring stations (control manholes).

§ 230-55 Access to property.

§ 230-56 Sampling and analysis.

§ 230-57 Vandalism; tampering with measuring devices.

§ 230-58 Special agreements.

Article XI Enforcement and Penalties

§ 230-59 Notification of violation.

§ 230-60 Show cause hearing.

§ 230-61 Civil penalties.

§ 230-62 Criminal penalties.

§ 230-63 Damages.

§ 230-64 Injunction.

§ 230-65 Summary abatement.

§ 230-66 Delinquent payments.

§ 230-67 Public notification.

Article XII Charges

§ 230-68 Normal sewage service charges.

§ 230-69 Measurement of flow.

§ 230-70 Measurement of other parameters.

§ 230-71 Surcharge for abnormal sewage.

§ 230-72 Debt retirement.

§ 230-73 Capital recovery.

§ 230-74 Collection of charges.

§ 230-75 Permit application fees.

§ 230-76 Fiscal year for system.

§ 230-77 Records and accounts.

Article XIII Public Disclosure of POTW Operations

§ 230-78 Full disclosure policy.

Article XIV Conflicts and Applicability

§ 230-79 Conflicts with other provisions.

§ 230-80 Applicability.