B.
(1)
The Township or its designee shall inspect all phases of the installation
of the stormwater management facilities as deemed appropriate by the
Township.
(2)
During any stage of the work, if the Township or its designee determines
that the stormwater management facilities are not being installed
in accordance with the approved drainage plan, the Township shall
revoke any existing building permits, zoning permits, or drainage
plan approval and issue a cease and desist order until the deficiencies
are corrected or a revised drainage plan is submitted and approved.
(3)
A final inspection of all stormwater management facilities shall
be conducted by the Township or its designee and to confirm compliance
with the approved drainage plan prior to the issuance of any occupancy
permit.