Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Rockaway, NJ
Morris County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Amended 9-25-2008 by Ord. No. 24-08]
Nothing contained in this chapter shall be deemed to modify or repeal any of the provisions of Chapter 172, Zoning. In the event of any inconsistency between the provisions of this chapter and the provisions of the Zoning Ordinance, such inconsistency shall be resolved in favor of the enforcement of the Zoning Ordinance.
No land area shall be disturbed by any person, partnership, corporation, municipal corporation or other public agency within the municipality unless:
A. 
The applicant has submitted to the Borough Engineer a plan to provide for soil erosion and sediment control for such land area in accordance with standards for erosion and sediment control adopted by the New Jersey Soil Conservation Committee (NJSCC) and administered by the Morris County Soil Conservation District (MCSCD) and such plan has been approved; and
B. 
A permit therefor is first secured from the Borough Council or Borough Engineer, as provided in this article.
Notwithstanding anything in this chapter to the contrary, in those cases where a building permit and/or an approved site plan has been obtained, no permit shall be required in connection with the removal of excess soil resulting from the construction or alteration of a building, structure or off-street loading or parking areas on such premises and new streets, roadways or driveways and excavation or grading incidental thereto.
A. 
A soil disturbance permit shall be obtained pursuant to the terms of this chapter in the case of any subdivision for which the subdivider proposes or is required by the Land Use Board to remove soil in excess of 500 cubic yards from the premises. Such permit must be obtained prior to grant of preliminary approval by the Land Use Board.
[Amended 12-13-2012 by Ord. No. 26-12]
B. 
The Borough Council may, in its discretion and consistent with the purposes stated in this chapter, require the completion of all soil removal or sections thereof by a subdivider prior to the erection of any dwellings or structures on the premises.
The Mayor and Borough Council shall not consider any application required by this chapter for soil disturbance, including soil removal from the premises for sale or otherwise, unless and until the owner of the premises shall first file with the Borough Clerk an application requesting such permission and listing the type of equipment to be utilized, the requested hours of operation and the effect on neighboring properties, together with a map of the premises, in duplicate, showing existing and proposed finished grade contour lines. The map shall also show the premises and the present and proposed topography of same in relation to the location and elevation of all abutting streets and adjoining properties.
A. 
Upon receipt of the required application and map, together with a fee as may be established by the Borough Council, the Borough Clerk shall transmit a copy of both the application and map to the Borough Engineer, who shall review same, inspect the site and, except where the application involves the removal of less than 500 cubic yards of soil, within 15 days make a complete written report to the Borough Council. Thereafter, the Council shall fix a time for hearing the application. Notice shall be given by the applicant in accordance with § 169-34.
B. 
In considering the application, the Borough Council shall be guided by and shall take into consideration the public health, safety and general welfare. Particular consideration shall be given to the following factors:
(1) 
Soil erosion by water and wind.
(2) 
Drainage (no sharp declivities or pits to be formed).
(3) 
Soil fertility.
(4) 
Lateral support slopes and grades of abutting streets and lands.
(5) 
Land values and uses.
(6) 
Such other factors as may bear upon or relate to the coordinated, adjusted and harmonious physical development of the Borough.
(7) 
Road damage, traffic and weather conditions.
C. 
In cases involving the removal of less than 500 cubic yards of soil, the Borough Engineer may, if all the provisions of this chapter are satisfied, issue the permit on his authority and report on the matter in full to the Mayor and Borough Council. In such event no hearing shall be required, but the performance bond required in this chapter shall be given.
In granting permits required by this chapter, the Borough Council or Borough Engineer shall have the power to impose terms and conditions in the public interest, including the fixing of a time limit on soil removal activities. If the time to complete the soil removal operation is so extended as to evidence the establishment of a soil mining or removal land use, which is contrary to the Zoning Ordinance, the permit shall not be granted.
Before a permit required by this chapter is effective, the applicant shall file with the Borough Council a performance bond conditioned upon full compliance with all of the terms and conditions of approval, including the provisions of this chapter. The amount of such bond shall be fixed by the Borough Council or Borough Engineer, and the same shall be in the form of cash or a surety bond in a form and with surety acceptable to the Borough Attorney. Where a surety bond is given, the Borough Council or Engineer shall have the right to demand a cash bond equal to 10% of the total amount, it being understood that in the event of default, the cash deposit shall be resorted to first by the Borough in pursuing its remedies.
If permission to remove the soil shall be granted, the owner or person in charge shall so conduct the operation that there shall be no sharp declivities, pits or depressions and in such manner that the area shall be properly leveled off, cleared of debris and graded to conform with the contour lines and grades as approved by the Borough Council or the Borough Engineer.
Any soil to be removed for sale from any premises in the Borough shall first be offered for sale at its fair market value to the Borough.
The owner of the premises or the person in charge of the removal of soil from such premises, when permission has been duly granted in accordance with this chapter, shall not remove the top soil for a depth of four inches. Such soil shall be stockpiled for redistribution on the premises when the rest of the soil has been removed, pursuant to the finished grading as approved by the Borough Council or the Borough Engineer.
The storage of soil taken from other premises within or outside the Borough shall be permitted without the approval required by this chapter, provided that it does not violate Chapter 172, Zoning.
See the provisions established in Chapter 171, Land Subdivision and Site Plan Review, Article II, Requirements for Subdivisions.
A. 
Upon completion of the project, the applicant shall notify the Borough Engineer who shall inspect the project area and, within seven days thereafter, either issue a report of compliance, a copy of which shall be mailed to the MCSCD, or shall state, in writing, the remedial action that must be taken to bring the project into compliance with the approved plan.
B. 
All necessary soil erosion and sediment control measures installed under this chapter shall be adequately maintained for one year after completion of the project or until such measures are permanently stabilized as determined by the Borough Engineer. Upon request, the Borough Engineer shall give the applicant a certificate indicating the date on which the measures called for in the approved plans were completed.
Before a permit required by this chapter is effective, the applicant shall file with the Borough Council a performance bond conditioned upon full compliance with all of the terms and conditions of approval, including the provisions of this chapter. The amount of such bond shall be fixed by the Borough Council or Borough Engineer, and the same shall be in the form of cash or a surety bond in the form and with surety acceptable to the Borough Attorney. Where a surety bond is given, the Borough Council or Engineer shall have the right to demand a cash bond equal to 10% of the total amount, it being understood that, in the event of default by the applicant or its successors in title, the cash deposit shall be resorted to first by the Borough in pursuing its remedies.
See the provisions established in Chapter 169, Land Use Administration and Procedures, Article V, Fees and Escrow Deposits.
A. 
Any person who violates any of the provisions of the Soil Erosion and Sediment Control Act (N.J.S.A. 4:24-9 et seq.), any standard promulgated pursuant to the provisions of the Soil Erosion and Sediment Control Act or fails to comply with the provisions of the certified plan shall be liable for the penalties set forth at N.J.S.A. 4:24-53.
B. 
If the construction of a project is being undertaken contrary to the provisions of the certified soil erosion and sediment control plan, the Borough Engineer may issue a stop construction order, in writing, which shall be given to the owner or the person granted approval under the provisions of this chapter. If the owner, developer or general contractor is not known or cannot be located with a reasonable effort, the notice may be delivered to the person in charge of or apparently in charge of the construction. No person shall continue or cause or allow to be continued the construction of a building or structure or the disturbance of any land or soil in violation of the stop construction order except with the permission of the Borough Engineer to abate a dangerous condition or to bring the project into compliance with the soil erosion and sediment control plan or except by court order. If an order to stop construction is not obeyed, the Borough Engineer shall apply to the appropriate court as otherwise established by law for an order enjoining the violation of the stop construction order. The remedy for the violation of such an order provided in this subsection shall be in addition to and not in limitation of any other remedies provided by law or ordinance.
C. 
When a project has been completed and fails to comply in any respect with the certified soil erosion and sediment control plan, no certificate of occupancy shall be issued pursuant to § 172-9 until the project complies with the submitted plan.
The following activities are specifically exempt from the soil disturbance, removal and protection provisions of this chapter:
A. 
Land disturbance associated with existing one- and two-family dwellings if such disturbance involves less than 2,000 square feet of land area.
B. 
Use of land for gardening primarily for home consumption.
C. 
Agricultural use of lands when operated in accordance with the farm conservation plan approved by the Morris County Soil Conservation District or when it is determined by the district that such use will not cause excessive erosion and sedimentation.
The requirements of this chapter shall be enforced by the Borough Engineer, who shall also inspect and require adequate inspection of the work. If the Borough Engineer finds existing conditions not as stated in the applicant's soil erosion and sediment control plan, the Borough Engineer may refuse to approve further work and may require necessary erosion and sediment control measures to be promptly installed and may seek other penalties as provided in § 170-23.
Appeals from decisions under this chapter may be made to the Mayor and Borough Council, in writing, within 10 days from the date of such decision. The appellant shall be entitled to a hearing before the Borough Council within 30 days from the date of appeal.