The approving authority may require the submission
of the additional following data and information in support of the
environmental protection objectives set forth in this chapter.
A description with suitable sketches and plans
of the proposed project shall be submitted. This item shall summarize,
rather than duplicate, the site plan and building plan.
The applicant shall submit a reconnaissance
survey and description of the environmental features of the project
site. The applicant may utilize resource information available from
the Borough, the Morris County Soil Conservation District and other
official agencies. Generally, the survey will consider the air quality,
topography, surface water bodies, surface water quality, aquatic biota,
soils, geology, groundwater, vegetation, wildlife endangered species
and archaeological and historical features. Forest vegetation shall
be classified by type and age class and depicted on a map, at a scale
of one inch equals 100 feet or larger. The location, species and diameter
at four and one-half feet above the ground of all isolated trees of
eight inches or more, or dogwoods of two inches or more in diameter,
shall be shown on the same or on a separate map. Current land use
of the subject property and adjacent properties within 500 feet shall
be indicated on a separate map.
The applicant shall submit an estimate of the
expected flow of sanitary sewage, process water and/or other wastewater
expected from the proposed development.
A.
If on-site sanitary sewage disposal is proposed, the
application shall indicate topography, soils and underlying geology,
including water table, aquifer recharge areas and all wells within
500 feet of the disposal area. Results of required percolation tests
and soil logs shall be included.
B.
If disposal is to an existing or new private or public
sewage treatment facility (STF), the owner and location of the plant
or facility and the location of the existing collection point to which
the project would be connected shall be identified. The applicant
shall document that the expected flows from the project to the STF
will be accepted and can be treated adequately. The applicant shall
comply with all applicable state and municipal health regulations
and with all groundwater standards of the New Jersey Department of
Environmental Protection and Energy.
A.
Adequacy of supply.
(1)
If the water is to be supplied from the site and a
flow of 100,000 gallons per day or less is required, the applicant
shall:
(a)
Substantiate and explain the anticipated demand.
(b)
Present proof that the aquifer can yield the
desired amount of water.
(c)
Demonstrate that wells proposed for installation
will meet acceptable standards.
(d)
Assess the effect of proposed withdrawals on
existing and proposed wells and surface water bodies within the predicted
measurable cone of depression.
(2)
If the plan includes 50 or more dwelling units, certification
of the adequacy of the proposed water supply and sewage facilities
shall be obtained from the New Jersey Department of Environmental
Protection.
B.
If the water is to be supplied from the site or other
new sources and the total project demand for water supply is in excess
of 100,000 gallons per day, the applicant shall obtain a diversion
permit from the New Jersey Department of Environmental Protection.
Preliminary development approval shall be contingent upon the granting
of a diversion grant. The applicant shall assess the effect of any
proposed diversion on wells and surface water bodies within the predicted
measurable cone of depression. The applicant shall supply copies of
all resource information provided to the New Jersey Water Policy and
Supply Council in support of its application for a diversion grant.
C.
If the water is to be supplied from an existing private
or public system, the applicant shall identify the owner and location
of the facility and the location of the existing distribution point
to which the proposed project will be connected. The applicant shall
submit documentary proof that the facility has the available excess
capacity in terms of its allowable diversion and equipment to supply
the proposed project and is willing to do so. It shall also submit
proof that adequate pressure for fire flows exists.
[Amended 4-13-2006 by Ord. No. 04-06[1]; 9-28-2006 by Ord. No. 11-06; 2-25-2021 by Ord. No. 06-21; 6-10-2021 by Ord. No. 19-21]
A.
Scope and purpose.
(1)
Policy statement. Flood control, groundwater recharge, and pollutant
reduction shall be achieved through the use of stormwater management
measures, including green infrastructure best management practices
(GI BMPs) and nonstructural stormwater management strategies. GI BMPs
and low impact development (LID) should be utilized to meet the goal
of maintaining natural hydrology to reduce stormwater runoff volume,
reduce erosion, encourage infiltration and groundwater recharge, and
reduce pollution. GI BMPs and LID should be developed based upon physical
site conditions and the origin, nature and the anticipated quantity,
or amount, of potential pollutants. Multiple stormwater management
BMPs may be necessary to achieve the established performance standards
for water quality, quantity, and groundwater recharge.
(2)
Purpose. It is the purpose of this section to establish minimum stormwater management requirements and controls for "major development," as defined in Subsection B.
(3)
Applicability.
(a)
(b)
This section shall also be applicable to all major developments
undertaken in the Borough of Rockaway.
(4)
Compatibility with other permit and ordinance requirements. Development
approvals issued for subdivisions and site plans pursuant to this
section are to be considered an integral part of development approvals
under the subdivision and site plan review process and do not relieve
the applicant of the responsibility to secure required permits or
approvals for activities regulated by any other applicable code, rule,
act, or ordinance. In their interpretation and application, the provisions
of this section shall be held to be the minimum requirements for the
promotion of the public health, safety, and general welfare. This
section is not intended to interfere with, abrogate, or annul any
other ordinances, rule or regulation, statute, or other provision
of law except that, where any provision of this section imposes restrictions
different from those imposed by any other ordinance, rule or regulation,
or other provision of law, the more restrictive provisions or higher
standards shall control.
B.
COMMUNITY BASIN
COMPACTION
CONTRIBUTARY DRAINAGE AREA
CORE
COUNTY REVIEW AGENCY
DEPARTMENT
DESIGN ENGINEER
DESIGNATED CENTER
DEVELOPMENT
DISTURBANCE
DRAINAGE AREA
EMPOWERMENT NEIGHBORHOOD
ENVIRONMENTALLY CONSTRAINED AREA
ENVIRONMENTALLY CRITICAL AREAS
EROSION
EXEMPT DEVELOPMENT
GREEN INFRASTRUCTURE
HUC 14 or HYDROLOGIC UNIT CODE 14
IMPERVIOUS SURFACE
INFILTRATION
LEAD PLANNING AGENCY
MAJOR DEVELOPMENT
(1)
(a)
(b)
(c)
(d)
(2)
MINOR DEVELOPMENT
MOTOR VEHICLE
MOTOR VEHICLE SURFACE
MUNICIPALITY
NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL
or BMP MANUAL
NODE
NUTRIENT
PERSON
POLLUTANT
RECHARGE
REGULATED IMPERVIOUS SURFACE
(1)
(2)
(3)
REGULATED MOTOR VEHICLE SURFACE
(1)
(2)
SEDIMENT
SITE
SOIL
STATE DEVELOPMENT AND REDEVELOPMENT PLAN METROPOLITAN PLANNING
AREA (PA1)
STATE PLAN POLICY MAP
STORMWATER
STORMWATER MANAGEMENT BMP
STORMWATER MANAGEMENT MEASURE
STORMWATER MANAGEMENT PLANNING AGENCY
STORMWATER MANAGEMENT PLANNING AREA
STORMWATER RUNOFF
URBAN COORDINATING COUNCIL EMPOWERMENT NEIGHBORHOOD
URBAN ENTERPRISE ZONES
URBAN REDEVELOPMENT AREA
WATER CONTROL STRUCTURE
WATERS OF THE STATE
WETLANDS or WETLAND
Definitions. Unless specifically defined below, words or phrases
used in this section shall be interpreted so as to give them the meaning
they have in common usage and to give this section its most reasonable
application.
An infiltration system, sand filter designed to infiltrate,
standard constructed wetland, or wet pond, established in accordance
with N.J.A.C. 7:8-4.2(c)14, that is designed and constructed in accordance
with the New Jersey Stormwater Best Management Practices Manual, or
an alternate design, approved in accordance with N.J.A.C. 7:8-5.2(g),
for an infiltration system, sand filter designed to infiltrate, standard
constructed wetland, or wet pond and that complies with the requirements
of this section.
The increase in soil bulk density.
The area from which stormwater runoff drains to a stormwater
management measure, not including the area of the stormwater management
measure itself.
A pedestrian-oriented area of commercial and civic uses serving
the surrounding municipality, generally including housing and access
to public transportation.
The New Jersey Department of Environmental Protection.
A person professionally qualified and duly licensed in New
Jersey to perform engineering services that may include, but not necessarily
be limited to, development of project requirements, creation and development
of project design and preparation of drawings and specifications.
A State Development and Redevelopment Plan Center as designated
by the State Planning Commission such as urban, regional, town, village,
or hamlet.
The division of a parcel of land into two or more parcels,
the construction, reconstruction, conversion, structural alteration,
relocation or enlargement of any building or structure, any mining
excavation or landfill, and any use or change in the use of any building
or other structure, or land or extension of use of land, by any person,
for which permission is required under the Municipal Land Use Law,
N.J.S.A. 40:55D-1 et seq. In the case of development of agricultural
lands, development means: any activity that requires a state permit;
any activity reviewed by the County Agricultural Board (CAB) and the
State Agricultural Development Committee (SADC), and municipal review
of any activity not exempted by the Right to Farm Act, N.J.S.A. 4:1C-1
et seq.
The placement or reconstruction of impervious surface or
motor vehicle surface, or exposure and/or movement of soil or bedrock
or clearing, cutting, or removing of vegetation. Milling and repaving
is not considered disturbance for the purposes of this definition.
A geographic area within which stormwater, sediments, or
dissolved materials drain to a particular receiving water body or
to a particular point along a receiving water body.
Neighborhoods designated by the Urban Coordinating Council
"in consultation and conjunction with" the New Jersey Redevelopment
Authority pursuant to N.J.S.A 55:19-69.
The following areas where the physical alteration of the
land is in some way restricted, either through regulation, easement,
deed restriction or ownership, such as: wetlands, floodplains, threatened
and endangered species sites or designated habitats, and parks and
preserves. Habitats of endangered or threatened species are identified
using the Department's Landscape Project as approved by the Department's
Endangered and Nongame Species Program.
An area or feature which is of significant environmental
value, including but not limited to: stream corridors; natural heritage
priority sites; habitat of endangered or threatened species; large
areas of contiguous open space or upland forest; steep slopes; and
wellhead protection and groundwater recharge areas. Habitats of endangered
or threatened species are identified using the Department's Landscape
Project as approved by the Department's Endangered and Nongame Species
Program.
The detachment and movement of soil or rock fragments by
water, wind, ice or gravity.
Any development that creates an increase of less than 1,000
square feet of impervious area and disturbs less than 2,500 square
feet of land. Further, an exempt development shall not meet the definition
of "minor development."
A stormwater management measure that manages stormwater close
to its source by:
An area within which water drains to a particular receiving
surface water body, also known as a subwatershed, which is identified
by a fourteen-digit hydrologic unit boundary designation, delineated
within New Jersey by the United States Geological Survey.
A surface that has been covered with a layer of material
so that it is highly resistant to infiltration by water.
The process by which water seeps into the soil from precipitation.
One or more public entities having stormwater management
planning authority designated by the regional stormwater management
planning committee pursuant to N.J.A.C. 7:8-3.2, that serves as the
primary representative of the committee.
An individual "development," as well as multiple developments
that individually or collectively result in:
The disturbance of one or more acres of land since February
2, 2004;
The creation of one-quarter acre or more of "regulated impervious
surface" since February 2, 2004;
The creation of one-quarter acre or more of "regulated motor
vehicle surface" since March 2, 2021 (or the effective date of this
section, whichever is earlier); or
A combination of (b) and (c) above that totals an area of one-quarter
acre or more. The same surface shall not be counted twice when determining
if the combination area equals one-quarter acre or more.
Major development includes all developments that are part of a common plan of development or sale (for example, phased residential development) that collectively or individually meet any one or more of Subsection (1)(a), (b), (c), or (d) above. Projects undertaken by any government agency that otherwise meet the definition of "major development" but which do not require approval under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq., are also considered "major development."
Any development that results in the creation of an increase
of 1,000 square feet or more of impervious area or one that disturbs
more than 2,500 square feet of land area. Further, a minor development
shall not meet the definition of "major development."
Land vehicles propelled other than by muscular power, such
as automobiles, motorcycles, autocycles, and low-speed vehicles. For
the purposes of this definition, motor vehicle does not include farm
equipment, snowmobiles, all-terrain vehicles, motorized wheelchairs,
go-carts, gas buggies, golf carts, ski-slope grooming machines, or
vehicles that run only on rails or tracks.
Any pervious or impervious surface that is intended to be
used by motor vehicles and/or aircraft, and is directly exposed to
precipitation, including, but not limited to, driveways, parking areas,
parking garages, roads, racetracks, and runways.
Any city, borough, town, township, or village.
The manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this section. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department's determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this section, provided the design engineer demonstrates to the municipality, in accordance with Subsection D(6) of this section and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this section.
An area designated by the State Planning Commission concentrating
facilities and activities which are not organized in a compact form.
A chemical element or compound, such as nitrogen or phosphorus,
which is essential to and promotes the development of organisms.
Any individual, corporation, company, partnership, firm,
association, the Borough of Rockaway, or political subdivision of
this state subject to municipal jurisdiction pursuant to the Municipal
Land Use Law, N.J.S.A. 40:55D-1 et seq.
Any dredged spoil, solid waste, incinerator residue, filter
backwash, sewage, garbage, refuse, oil, grease, sewage sludge, munitions,
chemical wastes, biological materials, medical wastes, radioactive
substance [except those regulated under the Atomic Energy Act of 1954,
as amended (42 U.S.C. § 2011 et seq.)], thermal waste, wrecked
or discarded equipment, rock, sand, cellar dirt, industrial, municipal,
agricultural, and construction waste or runoff, or other residue discharged
directly or indirectly to the land, groundwaters or surface waters
of the state, or to a domestic treatment works. "Pollutant" includes
both hazardous and nonhazardous pollutants.
The amount of water from precipitation that infiltrates into
the ground and is not evapotranspired.
Any of the following, alone or in combination:
A net increase of impervious surface;
The total area of impervious surface collected by a new stormwater
conveyance system (for the purpose of this definition, a "new stormwater
conveyance system" is a stormwater conveyance system that is constructed
where one did not exist immediately prior to its construction or an
existing system for which a new discharge location is created);
The total area of impervious surface proposed to be newly collected
by an existing stormwater conveyance system; and/or the total area
of impervious surface collected by an existing stormwater conveyance
system where the capacity of that conveyance system is increased.
Any of the following, alone or in combination:
The total area of motor vehicle surface that is currently receiving
water;
A net increase in motor vehicle surface; and/or quality treatment,
either by vegetation or soil, by an existing stormwater management
measure, or by treatment at a wastewater treatment plant, where the
water quality treatment will be modified or removed.
Solid material, mineral or organic, that is in suspension,
is being transported, or has been moved from its site of origin by
air, water or gravity as a product of erosion.
The lot or lots upon which a major development is to occur
or has occurred.
All unconsolidated mineral and organic material of any origin.
An area delineated on the State Plan Policy Map and adopted
by the State Planning Commission that is intended to be the focus
for much of the state's future redevelopment and revitalization efforts.
The geographic application of the State Development and Redevelopment
Plan's goals and statewide policies, and the official map of these
goals and policies.
Water resulting from precipitation (including rain and snow)
that runs off the land's surface, is transmitted to the subsurface,
or is captured by separate storm sewers or other sewage or drainage
facilities, or conveyed by snow removal equipment.
An excavation or embankment and related areas designed to
retain stormwater runoff. A stormwater management basin may either
be normally dry (that is, a detention basin or infiltration basin),
retain water in a permanent pool (a retention basin), or be planted
mainly with wetland vegetation (most constructed stormwater wetlands).
Any structural or nonstructural strategy, practice, technology,
process, program, or other method intended to control or reduce stormwater
runoff and associated pollutants, or to induce or control the infiltration
of groundwater recharge of stormwater or to eliminate illicit or illegal
nonstormwater discharges into stormwater conveyances.
A public body authorized by legislation to prepare stormwater
management plans.
The geographic area for which a stormwater management planning
agency is authorized to prepare stormwater management plans, or a
specific portion of that area identified in a stormwater management
plan prepared by that agency.
Water flow on the surface of the ground or in storm sewers,
resulting from precipitation.
A neighborhood given priority access to state resources through
the New Jersey Redevelopment Authority.
A zone designated by the New Jersey Enterprise Zone Authority
pursuant to the New Jersey Urban Enterprise Zones Act, N.J.S.A. 52:27H-60
et. seq.
Shall be defined as previously developed portions of areas:
A structure within, or adjacent to, a water, which intentionally
or coincidentally alters the hydraulic capacity, the flood elevation
resulting from the two-, ten-, or 100-year storm, flood hazard area
limit, and/or floodway limit of the water. Examples of a water control
structure may include a bridge, culvert, dam, embankment, ford (if
above grade), retaining wall, and weir.
The ocean and its estuaries, all springs, streams, wetlands,
and bodies of surface water or groundwater, whether natural or artificial,
within the boundaries of the State of New Jersey or subject to its
jurisdiction.
An area that is inundated or saturated by surface water or
groundwater at a frequency and duration sufficient to support, and
that under normal circumstances does support, a prevalence of vegetation
typically adapted for life in saturated soil conditions, commonly
known as hydrophytic vegetation.
C.
Design and performance standards for stormwater management measures.
(1)
Exempt developments. Any project meeting the definition of "exempt
development" shall be exempt from the provisions of this subsection.
(2)
Minor developments. Minor developments shall be designed to include
the following stormwater management measures:
(a)
Water quality: Soil erosion and sediment control measures shall
be installed in accordance with the Standards for Soil Erosion and
Sediment Control in New Jersey.
(b)
Rate/volume control: Seepage pits or other infiltration measures
shall be provided with a capacity of three inches of runoff for each
square foot of new impervious area. Stone used in the infiltration
devices shall be 2 1/2 inches clean stone and design void ratio
of 33% shall be used. The infiltration measures shall be designed
with an overflow to the surface which shall be stabilized and directed
to an existing stormwater conveyance system or in a manner to keep
the overflow on the developed property to the greatest extent feasible.
If the new impervious surface is not roof area, an equivalent area
of existing roof may be directed to the infiltration system. This
shall be permitted where the existing roof is not already directed
to infiltration devices.
(3)
Stormwater management measures for major development shall be designed
to provide erosion control, groundwater recharge, stormwater runoff
quantity control, and stormwater runoff quality treatment as follows:
(a)
The minimum standards for erosion control are those established
under the Soil and Sediment Control Act, N.J.S.A. 4:24-39 et seq.,
and implementing rules at N.J.A.C. 2:90.
(b)
The minimum standards for groundwater recharge, stormwater quality,
and stormwater runoff quantity shall be met by incorporating green
infrastructure.
(4)
The standards in this subsection apply only to new major development
and are intended to minimize the impact of stormwater runoff on water
quality and water quantity in receiving water bodies and maintain
groundwater recharge. The standards do not apply to new major development
to the extent that alternative design and performance standards are
applicable under a regional stormwater management plan or water quality
management plan adopted in accordance with Department rules.
D.
Stormwater management requirements for major development.
(1)
The development shall incorporate a maintenance plan for the stormwater management measures incorporated into the design of a major development in accordance with Subsection J.
(2)
Stormwater management measures shall avoid adverse impacts of concentrated
flow on habitat for threatened and endangered species as documented
in the Department's Landscape Project or Natural Heritage Database
established under N.J.S.A. 13:1B-15.147 through 13:1B-15.150, particularly
Helonias bullata (swamp pink) and/or Clemmys muhlenbergii (bog turtle).
(3)
The following linear development projects are exempt from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of Subsection D(16), (17) and (18).
(a)
The construction of an underground utility line, provided that
the disturbed areas are revegetated upon completion;
(b)
The construction of an aboveground utility line, provided that
the existing conditions are maintained to the maximum extent practicable;
and
(c)
The construction of a public pedestrian access, such as a sidewalk
or trail with a maximum width of 14 feet, provided that the access
is made of permeable material.
(4)
A waiver from strict compliance from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of Subsection D(16), (17) and (18) may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met:
(a)
The applicant demonstrates that there is a public need for the
project that cannot be accomplished by any other means;
(d)
The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under Subsection D(4)(c) above within the upstream drainage area of the receiving stream, that would provide additional opportunities to mitigate the requirements of Sections IV. P, Q & R that were not achievable on site.
(5)
Tables 1 through 3 below summarize the ability of stormwater best management practices identified and described in the New Jersey Stormwater Best Management Practices Manual to satisfy the green infrastructure, groundwater recharge, stormwater runoff quality and stormwater runoff quantity standards specified in Subsection D(15), (16), (17) and (18). When designed in accordance with the most current version of the New Jersey Stormwater Best Management Practices Manual, the stormwater management measures found at N.J.A.C. 7:8-5.2(f), Tables 5-1, 5-2 and 5-3 and listed below in Tables 1, 2 and 3 are presumed to be capable of providing stormwater controls for the design and performance standards as outlined in the tables below. Upon amendments of the New Jersey Stormwater Best Management Practices to reflect additions or deletions of BMPs meeting these standards, or changes in the presumed performance of BMPs designed in accordance with the New Jersey Stormwater BMP Manual, the Department shall publish in the New Jersey Registers a notice of administrative change revising the applicable table. The most current version of the BMP Manual can be found on the Department's website at: https://njstormwater.org/bmp_manual2.htm.
Table 1
| ||||
---|---|---|---|---|
Green Infrastructure BMPs for Groundwater Recharge, Stormwater
Runoff Quality, and/or Stormwater Runoff Quantity
| ||||
Best Management Practice
|
Stormwater Runoff Quality TSS Removal Rate
(percent)
|
Stormwater Runoff Quantity
|
Groundwater Recharge
|
Minimum Separation from Seasonal High Water Table
(feet)
|
Cistern
|
0
|
Yes
|
No
| |
Dry well(a)
|
0
|
No
|
Yes
|
2
|
Grass swale
|
50 or less
|
No
|
No
|
2(e)
1(f)
|
Green roof
|
0
|
Yes
|
No
|
—
|
Manufactured treatment device(a)(g)
|
50 or 80
|
No
|
No
|
Dependent upon the device
|
Pervious paving system(a)
|
80
|
Yes
|
Yes(b)
No(c)
|
2(b)
1(c)
|
Small-scale bioretention basin(a)
|
80 or 90
|
Yes
|
Yes(b)
No(c)
|
2(b)
1(c)
|
Small-scale infiltration basin(a)
|
80
|
Yes
|
Yes
|
2
|
Small-scale sand filter
|
80
|
Yes
|
Yes
|
2
|
Vegetative filter strip
|
60-80
|
No
|
No
|
—
|
(Notes corresponding to annotations (a)through(g) are found below.)
|
Table 2
| ||||
---|---|---|---|---|
Green Infrastructure BMPs for Stormwater Runoff Quantity
(or for Groundwater Recharge and/or Stormwater Runoff Quality
with a Waiver or Variance from N.J.A.C. 7:8-5.3)
| ||||
Best Management Practice
|
Stormwater Runoff Quality TSS Removal Rate
(percent)
|
Stormwater Runoff Quantity
|
Groundwater Recharge
|
Minimum Separation from Seasonal High Water Table
(feet)
|
Bioretention system
|
80 or 90
|
Yes
|
Yes(b)
No(c)
|
2(b)
1(c)
|
Infiltration basin
|
80
|
Yes
|
Yes
|
2
|
Sand filter(b)
|
80
|
Yes
|
Yes
|
2
|
Standard constructed wetland
|
90
|
Yes
|
No
|
N/A
|
Wet pond(d)
|
50-90
|
Yes
|
No
|
N/A
|
(Notes corresponding to annotations (b)through(d) are found below.)
|
Table 3
| ||||
---|---|---|---|---|
BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or
Stormwater Runoff Quantity
only with a Waiver or Variance from N.J.A.C. 7:8-5.3
| ||||
Best Management Practice
|
Stormwater Runoff Quality TSS Removal Rate
(percent)
|
Stormwater Runoff Quantity
|
Groundwater Recharge
|
Minimum Separation from Seasonal High Water Table
(feet)
|
Blue roof
|
0
|
Yes
|
No
|
N/A
|
Extended detention basin
|
40-60
|
Yes
|
No
|
1
|
Manufactured treatment device(h)
|
50 or 80
|
No
|
No
|
Dependent upon the device
|
Sand filter(c)
|
80
|
Yes
|
No
| |
Subsurface gravel wetland
|
90
|
No
|
No
|
1
|
Wet pond
|
50-90
|
Yes
|
No
|
N/A
|
Notes to Tables 1, 2, and 3:
| |
(a)
|
Subject to the applicable contributory drainage area limitation specified in Subsection D(15)(b).
|
(b)
|
Designed to infiltrate into the subsoil.
|
(c)
|
Designed with underdrains.
|
(d)
|
Designed to maintain at least a ten-foot-wide area of native
vegetation along at least 50% of the shoreline and to include a stormwater
runoff retention component designed to capture stormwater runoff for
beneficial reuse, such as irrigation.
|
(e)
|
Designed with a slope of less than 2%.
|
(f)
|
Designed with a slope of equal to or greater than 2%.
|
(g)
|
Manufactured treatment devices that meet the definition of green infrastructure in Subsection B.
|
(h)
|
Manufactured treatment devices that do not meet the definition of green infrastructure in Subsection B.
|
(6)
Where the BMP tables in the NJ Stormwater Management Rule are different
due to updates or amendments with the tables in this section, the
BMP Tables in the Stormwater Management rule at N.J.A.C. 7:8-5.2(f)
shall take precedence.
(7)
An alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate may be used if the design engineer demonstrates the capability of the proposed alternative stormwater management measure and/or the validity of the alternative rate or method to the municipality. A copy of any approved alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate shall be provided to the Department in accordance with Subsection D(2). Alternative stormwater management measures may be used to satisfy the requirements at Subsection D(15) only if the measures meet the definition of green infrastructure at Subsection B. Alternative stormwater management measures that function in a similar manner to a BMP listed at Subsection D(15)(b) are subject to the contributory drainage area limitation specified at Subsection D(15)(b) for that similarly functioning BMP. Alternative stormwater management measures approved in accordance with this subsection that do not function in a similar manner to any BMP listed at Subsection D(15)(b) shall have a contributory drainage area less than or equal to 2.5 acres, except for alternative stormwater management measures that function similarly to cisterns, grass swales, green roofs, standard constructed wetlands, vegetative filter strips, and wet ponds, which are not subject to a contributory drainage area limitation. Alternative measures that function similarly to standard constructed wetlands or wet ponds shall not be used for compliance with the stormwater runoff quality standard unless a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with Subsection D(4) is granted from Subsection D(15).
(8)
Whenever the stormwater management design includes one or more BMPs
that will infiltrate stormwater into subsoil, the design engineer
shall assess the hydraulic impact on the groundwater table and design
the site, so as to avoid adverse hydraulic impacts. Potential adverse
hydraulic impacts include, but are not limited to, exacerbating a
naturally or seasonally high water table, so as to cause surficial
ponding, flooding of basements, or interference with the proper operation
of subsurface sewage disposal systems or other subsurface structures
within the zone of influence of the groundwater mound, or interference
with the proper functioning of the stormwater management measure itself.
(9)
Design standards for stormwater management measures are as follows:
(a)
Stormwater management measures shall be designed to take into
account the existing site conditions, including, but not limited to,
environmentally critical areas; wetlands; flood-prone areas; slopes;
depth to seasonal high water table; soil type, permeability, and texture;
drainage area and drainage patterns; and the presence of solution-prone
carbonate rocks (limestone);
(b)
Stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure, as appropriate, and shall have parallel bars with one-inch spacing between the bars to the elevation of the water quality design storm. For elevations higher than the water quality design storm, the parallel bars at the outlet structure shall be spaced no greater than 1/3 the width of the diameter of the orifice or one-third the width of the weir, with a minimum spacing between bars of one inch and a maximum spacing between bars of six inches. In addition, the design of trash racks must comply with the requirements of Subsection H(3);
(c)
Stormwater management measures shall be designed, constructed,
and installed to be strong, durable, and corrosion resistant. Measures
that are consistent with the relevant portions of the Residential
Site Improvement Standards at N.J.A.C. 5:21-7.3, 7.4, and 7.5 shall
be deemed to meet this requirement;
(d)
Stormwater management BMPs shall be designed to meet the minimum safety standards for stormwater management BMPs at Subsection H; and
(e)
The size of the orifice at the intake to the outlet from the
stormwater management BMP shall be a minimum of 2 1/2 inches
in diameter.
(10)
Manufactured treatment devices may be used to meet the requirements of this section, provided the pollutant removal rates are verified by the New Jersey Corporation for Advanced Technology and certified by the Department. Manufactured treatment devices that do not meet the definition of green infrastructure at Subsection B may be used only under the circumstances described at Subsection D(15)(d).
(11)
Any application for a new agricultural development that meets the definition of major development at Subsection B shall be submitted to the Soil Conservation District for review and approval in accordance with the requirements at Subsection D(15), (16), (17) and (18) and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber, and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacture of agriculturally related products.
(12)
If there is more than one drainage area, the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at Subsection D(16), (17) and (18) shall be met in each drainage area, unless the runoff from the drainage areas converge on site and no adverse environmental impact would occur as a result of compliance with any one or more of the individual standards being determined utilizing a weighted average of the results achieved for that individual standard across the affected drainage areas.
(13)
Any stormwater management measure authorized under the municipal stormwater management plan or ordinance shall be reflected in a deed notice recorded in the office of the Morris County Clerk. A form of deed notice shall be submitted to the municipality for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at Subsection D(15), (16), (17) and (18) and shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US Feet or Latitude and Longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to Subsection J(2)(e). Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the Clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality.
(14)
A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to Subsection D of this section and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the office of the Morris County Clerk and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with Subsection D(13) above. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality in accordance with Subsection D(13) above.
(15)
Green infrastructure standards.
(a)
This subsection specifies the types of green infrastructure
BMPs that may be used to satisfy the groundwater recharge, stormwater
runoff quality, and stormwater runoff quantity standards.
(b)
To satisfy the groundwater recharge and stormwater runoff quality standards at Subsection D(16) and (17), the design engineer shall utilize green infrastructure BMPs identified in Table 1 at Subsection D(6) and/or an alternative stormwater management measure approved in accordance with Subsection D(7). The following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations:
Best Management Practice
|
Maximum Contributory Drainage Area
|
---|---|
Dry well
|
1 acre
|
Manufactured treatment device
|
2.5 acres
|
Pervious pavement systems
|
Area of additional inflow cannot exceed three times the area
occupied by the BMP
|
Small-scale bioretention systems
|
2.5 acres
|
Small-scale infiltration basin
|
2.5 acres
|
Small-scale sand filter
|
2.5 acres
|
(d)
If a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with Subsection D(4) is granted from the requirements of this subsection, then BMPs from Table 1, 2, or 3, and/or an alternative stormwater management measure approved in accordance with Subsection D(7) may be used to meet the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at Subsection D(16), (17) and (18).
(e)
For separate or combined storm sewer improvement projects, such as sewer separation, undertaken by a government agency or public utility (for example, a sewerage company), the requirements of this subsection shall only apply to areas owned in fee simple by the government agency or utility, and areas within a right-of-way or easement held or controlled by the government agency or utility; the entity shall not be required to obtain additional property or property rights to fully satisfy the requirements of this subsection. Regardless of the amount of area of a separate or combined storm sewer improvement project subject to the green infrastructure requirements of this subsection, each project shall fully comply with the applicable groundwater recharge, stormwater runoff quality control, and stormwater runoff quantity standards at Subsection D(16), (17) and (18), unless the project is granted a waiver from strict compliance in accordance with Subsection D(4).
(16)
Groundwater recharge standards.
(a)
This subsection contains the minimum design and performance
standards for groundwater recharge as follows.
(b)
The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations at Subsection E, either:
[1]
Demonstrate through hydrologic and hydraulic analysis that the
site and its stormwater management measures maintain 100% of the average
annual pre-construction groundwater recharge volume for the site;
or
[2]
Demonstrate through hydrologic and hydraulic analysis that the
increase of stormwater runoff volume from pre-construction to post-construction
for the two-year storm is infiltrated.
(c)
This groundwater recharge requirement does not apply to projects within the urban redevelopment area, or to projects subject to Subsection D(16)(d) below.
(d)
The following types of stormwater shall not be recharged:
[1]
Stormwater from areas of high pollutant loading. High pollutant
loading areas are areas in industrial and commercial developments
where solvents and/or petroleum products are loaded/unloaded, stored,
or applied, areas where pesticides are loaded/unloaded or stored;
areas where hazardous materials are expected to be present in greater
than "reportable quantities" as defined by the United States Environmental
Protection Agency (EPA) at 40 CFR 302.4; areas where recharge would
be inconsistent with Department-approved remedial action work plan
or landfill closure plan and areas with high risks for spills of toxic
materials, such as gas stations and vehicle maintenance facilities;
and
[2]
Industrial stormwater exposed to source material. "Source material"
means any material(s) or machinery, located at an industrial facility,
that is directly or indirectly related to process, manufacturing or
other industrial activities, which could be a source of pollutants
in any industrial stormwater discharge to groundwater. Source materials
include, but are not limited to, raw materials; intermediate products;
final products; waste materials; by-products; industrial machinery
and fuels, and lubricants, solvents, and detergents that are related
to process, manufacturing, or other industrial activities that are
exposed to stormwater.
(17)
Stormwater runoff quality standards.
(a)
This subsection contains the minimum design and performance
standards to control stormwater runoff quality impacts of major development.
Stormwater runoff quality standards are applicable when the major
development results in an increase of one-quarter acre or more of
regulated motor vehicle surface.
(b)
Stormwater management measures shall be designed to reduce the
postconstruction load of total suspended solids (TSS) in stormwater
runoff generated from the water quality design storm as follows:
[1]
Eighty-percent TSS removal of the anticipated load, expressed
as an annual average, shall be achieved for the stormwater runoff
from the net increase of motor vehicle surface.
[2]
If the surface is considered regulated motor vehicle surface
because the water quality treatment for an area of motor vehicle surface
that is currently receiving water quality treatment either by vegetation
or soil, by an existing stormwater management measure, or by treatment
at a wastewater treatment plant is to be modified or removed, the
project shall maintain or increase the existing TSS removal of the
anticipated load expressed as an annual average.
(c)
The requirement to reduce TSS does not apply to any stormwater runoff in a discharge regulated under a numeric effluent limitation for TSS imposed under the New Jersey Pollutant Discharge Elimination System (NJPDES) rules, N.J.A.C. 7:14A, or in a discharge specifically exempt under an NJPDES permit from this requirement. Every major development, including any that discharge into a combined sewer system, shall comply with Subsection D(17)(b) above, unless the major development is itself subject to an NJPDES permit with a numeric effluent limitation for TSS or the NJPDES permit to which the major development is subject exempts the development from a numeric effluent limitation for TSS.
(d)
The water quality design storm is 1.25 inches of rainfall in
two hours. Water quality calculations shall take into account the
distribution of rain from the water quality design storm, as reflected
in Table 4, below. The calculation of the volume of runoff may take
into account the implementation of stormwater management measures.
Table 4 - Water Quality Design Storm Distribution
| |||||
---|---|---|---|---|---|
Time
(minutes)
|
Cumulative Rainfall
(inches)
|
Time
(minutes)
|
Cumulative Rainfall
(inches)
|
Time (minutes)
|
Cumulative Rainfall
(inches)
|
1
|
0.00166
|
41
|
0.1728
|
81
|
1.0906
|
2
|
0.00332
|
42
|
0.1796
|
82
|
1.0972
|
3
|
0.00498
|
43
|
0.1864
|
83
|
1.1038
|
4
|
0.00664
|
44
|
0.1932
|
84
|
1.1104
|
5
|
0.00830
|
45
|
0.2000
|
85
|
1.1170
|
6
|
0.00996
|
46
|
0.2117
|
86
|
1.1236
|
7
|
0.01162
|
47
|
0.2233
|
87
|
1.1302
|
8
|
0.01328
|
48
|
0.2350
|
88
|
1.1368
|
9
|
0.01494
|
49
|
0.2466
|
89
|
1.1434
|
10
|
0.01660
|
50
|
0.2583
|
90
|
1.1500
|
11
|
0.01828
|
51
|
0.2783
|
91
|
1.1550
|
12
|
0.01996
|
52
|
0.2983
|
92
|
1.1600
|
13
|
0.02164
|
53
|
0.3183
|
93
|
1.1650
|
14
|
0.02332
|
54
|
0.3383
|
94
|
1.1700
|
15
|
0.02500
|
55
|
0.3583
|
95
|
1.1750
|
16
|
0.03000
|
56
|
0.4116
|
96
|
1.1800
|
17
|
0.03500
|
57
|
0.4650
|
97
|
1.1850
|
18
|
0.04000
|
58
|
0.5183
|
98
|
1.1900
|
19
|
0.04500
|
59
|
0.5717
|
99
|
1.1950
|
20
|
0.05000
|
60
|
0.6250
|
100
|
1.2000
|
21
|
0.05500
|
61
|
0.6783
|
101
|
1.2050
|
22
|
0.06000
|
62
|
0.7317
|
102
|
1.2100
|
23
|
0.06500
|
63
|
0.7850
|
103
|
1.2150
|
24
|
0.07000
|
64
|
0.8384
|
104
|
1.2200
|
25
|
0.07500
|
65
|
0.8917
|
105
|
1.2250
|
26
|
0.08000
|
66
|
0.9117
|
106
|
1.2267
|
27
|
0.08500
|
67
|
0.9317
|
107
|
1.2284
|
28
|
0.09000
|
68
|
0.9517
|
108
|
1.2300
|
29
|
0.09500
|
69
|
0.9717
|
109
|
1.2317
|
30
|
0.10000
|
70
|
0.9917
|
110
|
1.2334
|
31
|
0.10660
|
71
|
1.0034
|
111
|
1.2351
|
32
|
0.11320
|
72
|
1.0150
|
112
|
1.2367
|
33
|
0.11980
|
73
|
1.0267
|
113
|
1.2384
|
34
|
0.12640
|
74
|
1.0383
|
114
|
1.2400
|
35
|
0.13300
|
75
|
1.0500
|
115
|
1.2417
|
36
|
0.13960
|
76
|
1.0568
|
116
|
1.2434
|
37
|
0.14620
|
77
|
1.0636
|
117
|
1.2450
|
38
|
0.15280
|
78
|
1.0704
|
118
|
1.2467
|
39
|
0.15940
|
79
|
1.0772
|
119
|
1.2483
|
40
|
0.16600
|
80
|
1.0840
|
120
|
1.2500
|
(e)
If more than one BMP in series is necessary to achieve the required
80% TSS reduction for a site, the applicant shall utilize the following
formula to calculate TSS reduction:
R = A + B - (A x B)/100
|
Where:
| ||
R
|
=
|
total TSS percent load removal from application of both BMPs
|
A
|
=
|
the TSS percent removal rate applicable to the first BMP
|
B
|
=
|
the TSS percent removal rate applicable to the second BMP
|
(f)
Stormwater management measures shall also be designed to reduce, to the maximum extent feasible, the post-construction nutrient load of the anticipated load from the developed site in stormwater runoff generated from the water quality design storm. In achieving reduction of nutrients to the maximum extent feasible, the design of the site shall include green infrastructure BMPs that optimize nutrient removal while still achieving the performance standards in Subsection D(16), (17) and (18).
(g)
In accordance with the definition of FW1 at N.J.A.C. 7:9B-1.4,
stormwater management measures shall be designed to prevent any increase
in stormwater runoff to waters classified as FW1.
(h)
The Flood Hazard Area Control Act Rules at N.J.A.C. 7:13-4.1(c)1
establish 300-foot riparian zones along Category One waters, as designated
in the Surface Water Quality Standards at N.J.A.C. 7:9B, and certain
upstream tributaries to Category One waters. A person shall not undertake
a major development that is located within or discharges into a 300-foot
riparian zone without prior authorization from the Department under
N.J.A.C. 7:13.
(i)
Pursuant to the Flood Hazard Area Control Act Rules at N.J.A.C.
7:13-11.2(j)3.i, runoff from the water quality design storm that is
discharged within a 300-foot riparian zone shall be treated in accordance
with this subsection to reduce the postconstruction load of total
suspended solids by 95% of the anticipated load from the developed
site, expressed as an annual average.
(j)
This stormwater runoff quality standards do not apply to the
construction of one individual single-family dwelling, provided that
it is not part of a larger development or subdivision that has received
preliminary or final site plan approval prior to December 3, 2018,
and that the motor vehicle surfaces are made of permeable material(s)
such as gravel, dirt, and/or shells.
(18)
Stormwater runoff quantity standards.
(a)
This subsection contains the minimum design and performance
standards to control stormwater runoff quantity impacts of major development.
(b)
In order to control stormwater runoff quantity impacts, the design engineer shall, using the assumptions and factors for stormwater runoff calculations at Subsection E, complete one of the following:
[1]
Demonstrate through hydrologic and hydraulic analysis that for
stormwater leaving the site, post-construction runoff hydrographs
for the two-, ten-, and 100-year storm events do not exceed, at any
point in time, the pre-construction runoff hydrographs for the same
storm events;
[2]
Demonstrate through hydrologic and hydraulic analysis that there
is no increase, as compared to the pre-construction condition, in
the peak runoff rates of stormwater leaving the site for the two-,
ten- and 100-year storm events and that the increased volume or change
in timing of stormwater runoff will not increase flood damage at or
downstream of the site. This analysis shall include the analysis of
impacts of existing land uses and projected land uses assuming full
development under existing zoning and land use ordinances in the drainage
area;
[3]
Design stormwater management measures so that the post-construction
peak runoff rates for the two-, ten- and 100-year storm events are
50%, 75% and 80%, respectively, of the pre-construction peak runoff
rates. The percentages apply only to the post-construction stormwater
runoff that is attributable to the portion of the site on which the
proposed development or project is to be constructed; or
[4]
In tidal flood hazard areas, stormwater runoff quantity analysis in accordance with Subsection D(18)(b)[1] and [2] above is required unless the design engineer demonstrates through hydrologic and hydraulic analysis that the increased volume, change in timing, or increased rate of the stormwater runoff, or any combination of the three, will not result in additional flood damage below the point of discharge of the major development. No analysis is required if the stormwater is discharged directly into any ocean, bay, inlet, or the reach of any watercourse between its confluence with an ocean, bay, or inlet and downstream of the first water control structure.
(c)
The stormwater runoff quantity standards shall be applied at
the site's boundary to each abutting lot, roadway, watercourse, or
receiving storm sewer system.
E.
Calculation of stormwater runoff and groundwater recharge.
(1)
Stormwater runoff shall be calculated in accordance with the following:
(a)
The design engineer shall calculate runoff using one of the
following methods:
[1]
The USDA Natural Resources Conservation Service (NRCS) methodology, including the NRCS Runoff Equation and Dimensionless Unit Hydrograph, as described in Chapters 7, 9, 10, 15 and 16 Part 630, Hydrology National Engineering Handbook, incorporated herein by reference as amended and supplemented. This methodology is additionally described in Technical Release 55 - Urban Hydrology for Small Watersheds (TR-55), dated June 1986, incorporated herein by reference as amended and supplemented. Information regarding the methodology is available from the Natural Resources Conservation Service website at: https://www.nrcs.usda.gov/Internet/FSE DOCUMENTS/stelprdb1044171.pdf or at United States Department of Agriculture Natural Resources Conservation Service, 220 Davison Avenue, Somerset, New Jersey 08873; or
[2]
The Rational Method for peak flow and the Modified Rational
Method for hydrograph computations. The Rational and Modified Rational
Methods are described in "Appendix A-9 Modified Rational Method" in
the Standards for Soil Erosion and Sediment Control in New Jersey,
January 2014. This document is available from the State Soil Conservation
Committee or any of the Soil Conservation Districts listed at N.J.A.C.
2:90-1.3(a)3. The location, address, and telephone number for each
Soil Conservation District is available from the State Soil Conservation
Committee, PO Box 330, Trenton, New Jersey 08625. The document is
also available at: http://www.nj.gov/agriculture/divisions/anr/pdf/2014NJSoilErosionControlStandardsComplete.pdf.
(b)
For the purpose of calculating runoff coefficients and groundwater recharge, there is a presumption that the preconstruction condition of a site or portion thereof is a wooded land use with good hydrologic condition. The term "runoff coefficient" applies to both the NRCS methodology at Subsection E(1)(a)[1] and the Rational and Modified Rational Methods at Subsection E(1)(a)[2]. A runoff coefficient or a groundwater recharge land cover for an existing condition may be used on all or a portion of the site if the design engineer verifies that the hydrologic condition has existed on the site or portion of the site for at least five years without interruption prior to the time of application. If more than one land cover have existed on the site during the five years immediately prior to the time of application, the land cover with the lowest runoff potential shall be used for the computations. In addition, there is the presumption that the site is in good hydrologic condition (if the land use type is pasture, lawn, or park), with good cover (if the land use type is woods), or with good hydrologic condition and conservation treatment (if the land use type is cultivation).
(c)
In computing preconstruction stormwater runoff, the design engineer
shall account for all significant land features and structures, such
as ponds, wetlands, depressions, hedgerows, or culverts, that may
reduce preconstruction stormwater runoff rates and volumes.
(d)
In computing stormwater runoff from all design storms, the design
engineer shall consider the relative stormwater runoff rates and/or
volumes of pervious and impervious surfaces separately to accurately
compute the rates and volume of stormwater runoff from the site. To
calculate runoff from unconnected impervious cover, urban impervious
area modifications as described in the NRCS Technical Release 55 -
Urban Hydrology for Small Watersheds and other methods may be employed.
(e)
If the invert of the outlet structure of a stormwater management
measure is below the flood hazard design flood elevation as defined
at N.J.A.C. 7:13, the design engineer shall take into account the
effects of tail water in the design of structural stormwater management
measures.
(2)
Groundwater recharge may be calculated in accordance with the following:
The New Jersey Geological Survey Report GSR-32, A Method for
Evaluating Groundwater-Recharge Areas in New Jersey, incorporated
herein by reference as amended and supplemented. Information regarding
the methodology is available from the New Jersey Stormwater Best Management
Practices Manual; at the New Jersey Geological Survey website at:
https://www.nj.gov/dep/njgs/pricelst/gsreport/gsr32.pdf or at New
Jersey Geological and Water Survey, 29 Arctic Parkway, PO Box 420
Mail Code 29-01, Trenton, New Jersey 08625-0420.
F.
Sources for technical guidance.
(1)
Technical guidance for stormwater management measures can be found
in the documents listed below, which are available to download from
the Department's website at: http://www.nj.gov/dep/stormwater/bmp_manual2.htm.
(a)
Guidelines for stormwater management measures are contained
in the New Jersey Stormwater Best Management Practices Manual, as
amended and supplemented. Information is provided on stormwater management
measures such as, but not limited to, those listed in Tables 1, 2,
and 3.
(b)
Additional maintenance guidance is available on the Department's
website at: https://www.njstormwater.org/maintenance_guidance.htm.
(2)
Submissions required for review by the Department should be mailed
to: The Division of Water Quality, New Jersey Department of Environmental
Protection, Mail Code 401-02B, PO Box 420, Trenton, New Jersey 08625-0420.
(3)
The "Standards for Soil Erosion and Sediment Control in New Jersey"
promulgated by the State Soil Conservation Committee and incorporated
into N.J.A.C. 2:90. Copies of these standards may be obtained by contacting
the State Soil Conservation Committee or any of the Soil Conservation
Districts listed in N.J.A.C. 2:90-1.3(a)3. The location, address,
and telephone number of each Soil Conservation District may be obtained
from the State Soil Conservation Committee, P.O. Box 330, Trenton,
New Jersey 08625; (609) 292-5540.
(4)
The Rutgers Cooperative Extension Service, (732) 932-9306.
(5)
The Soil Conservation Districts listed in N.J.A.C. 2:90-1.3(a)3.
The location, address, and telephone number of each Soil Conservation
District may be obtained from the State Soil Conservation Committee,
P.O. Box 330, Trenton, New Jersey, 08625, (609) 292-5540.
G.
Solids and floatable materials control standards.
(1)
Site design features identified under Subsection D(6) above, or alternative designs in accordance with Subsection D(7) above, to prevent discharge of trash and debris from drainage systems shall comply with the following standard to control passage of solid and floatable materials through storm drain inlets. For purposes of this subsection, "solid and floatable materials" means sediment, debris, trash, and other floating, suspended, or settleable solids. For exemptions to this standard see Subsection G(1)(b) below.
(a)
Design engineers shall use one of the following grates whenever
they use a grate in pavement or another ground surface to collect
stormwater from that surface into a storm drain or surface water body
under that grate:
[1]
The New Jersey Department of Transportation (NJDOT) bicycle-safe
grate, which is described in Chapter 2.4 of the NJDOT Bicycle Compatible
Roadways and Bikeways Planning and Design Guidelines; or
[2]
A different grate, if each individual clear space in that grate
has an area of no more than 7.0 square inches, or is no greater than
0.5 inch across the smallest dimension. Examples of grates subject
to this standard include grates in grate inlets, the grate portion
(non-curb-opening portion) of combination inlets, grates on storm
sewer manholes, ditch grates, trench grates, and grates of spacer
bars in slotted drains. Examples of ground surfaces include surfaces
of roads (including bridges), driveways, parking areas, bikeways,
plazas, sidewalks, lawns, fields, open channels, and stormwater system
floors used to collect stormwater from the surface into a storm drain
or surface water body.
[3]
For curb-opening inlets, including curb-opening inlets in combination
inlets, the clear space in that curb opening, or each individual clear
space if the curb opening has two or more clear spaces, shall have
an area of no more than 7.0 square inches, or be no greater than 2.0
inches across the smallest dimension.
(b)
The standard in Subsection G(1)(a) above does not apply:
[1]
Where each individual clear space in the curb opening in an
existing curb-opening inlet does not have an area of more than 9.0
square inches;
[2]
Where the municipality agrees that the standards would cause
inadequate hydraulic performance that could not practicably be overcome
by using additional or larger storm drain inlets;
[3]
Where flows from the water quality design storm as specified
in N.J.A.C. 7:8 are conveyed through any device (e.g., end of pipe
netting facility, manufactured treatment device, or a catch basin
hood) that is designed, at a minimum, to prevent delivery of all solid
and floatable materials that could not pass through one of the following:
[a]
A rectangular space 4.625 inches long and 1.5 inches
wide (this option does not apply for outfall netting facilities);
or
[b]
A bar screen having a bar spacing of 0.5 inch.
Note that these exemptions do not authorize any infringement
of requirements in the Residential Site Improvement Standards for
bicycle-safe grates in new residential development [N.J.A.C. 5:21-4.18(b)2
and 5:21-7.4(b)1].
[4]
Where flows are conveyed through a trash rack that has parallel
bars with one-inch spacing between the bars, to the elevation of the
water quality design storm as specified in N.J.A.C. 7:8; or
[5]
Where the New Jersey Department of Environmental Protection
determines, pursuant to the New Jersey Register of Historic Places
Rules at N.J.A.C. 7:4-7.2(c), that action to meet this standard is
an undertaking that constitutes an encroachment or will damage or
destroy the New Jersey Register listed historic property.
H.
Safety standards for stormwater management basins.
(1)
This subsection sets forth requirements to protect public safety
through the proper design and operation of stormwater management BMPs.
This section applies to any new stormwater management BMP.
(2)
The provisions of this section are not intended to preempt more stringent municipal or county safety requirements for new or existing stormwater management BMPs. Municipal and county stormwater management plans and ordinances may, pursuant to their authority, require existing stormwater management BMPs to be retrofitted to meet one or more of the safety standards in Subsection H(3)(a), (b), and (c) for trash racks, overflow grates, and escape provisions at outlet structures.
(3)
Requirements for trash racks, overflow grates and escape provisions.
(a)
A trash rack is a device designed to catch trash and debris
and prevent the clogging of outlet structures. Trash racks shall be
installed at the intake to the outlet from the stormwater management
BMPs to ensure proper functioning of the BMP outlets in accordance
with the following:
[1]
The trash rack shall have parallel bars, with no greater than
six-inch spacing between the bars.
[2]
The trash rack shall be designed so as not to adversely affect
the hydraulic performance of the outlet pipe or structure.
[3]
The average velocity of flow through a clean trash rack is not
to exceed 2.5 feet per second under the full range of stage and discharge.
Velocity is to be computed on the basis of the net area of opening
through the rack.
[4]
The trash rack shall be constructed and installed to be rigid,
durable, and corrosion resistant, and shall be designed to withstand
a perpendicular live loading of 300 pounds per square foot.
(b)
An overflow grate is designed to prevent obstruction of the
overflow structure. If an outlet structure has an overflow grate,
such grate shall meet the following requirements:
[1]
The overflow grate shall be secured to the outlet structure
but removable for emergencies and maintenance.
[2]
The overflow grate spacing shall be no less than two inches
across the smallest dimension.
[3]
The overflow grate shall be constructed and installed to be
rigid, durable, and corrosion resistant, and shall be designed to
withstand a perpendicular live loading of 300 pounds per square foot.
(c)
Stormwater management BMPs shall include escape provisions as
follows:
[1]
If a stormwater management BMP has an outlet structure, escape provisions shall be incorporated in or on the structure. Escape provisions include the installation of permanent ladders, steps, rungs, or other features that provide easily accessible means of egress from stormwater management BMPs. With the prior approval of the municipality pursuant to Subsection H(3), a freestanding outlet structure may be exempted from this requirement;
[2]
Safety ledges shall be constructed on the slopes of all new
stormwater management BMPs having a permanent pool of water deeper
than 2 1/2 feet. Such safety ledges shall be comprised of two
steps. Each step shall be four to six feet in width. One step shall
be located approximately 2 1/2 feet below the permanent water
surface, and the second step shall be located one to 1 1/2 feet
above the permanent water surface. See H(5) for an illustration of
safety ledges in a stormwater management BMP; and
[3]
In new stormwater management BMPs, the maximum interior slope
for an earthen dam, embankment, or berm shall not be steeper than
three horizontal to one vertical.
(4)
Variance or exemption from safety standards. A variance or exemption
from the safety standards for stormwater management BMPs may be granted
only upon a written finding by the appropriate reviewing agency (municipality,
county or department) that the variance or exemption will not constitute
a threat to public safety.
I.
Requirements for a site development stormwater plan.
(1)
Submission of site development stormwater plan.
(a)
Whenever an applicant seeks municipal approval of a development subject to this subsection, the applicant shall submit all of the required components of the checklist for the site development stormwater plan at Subsection I(3) below as part of the submission of the applicant's application for subdivision or site plan approval.
(b)
The applicant shall demonstrate that the project meets the standards
set forth in this subsection.
(2)
Site development stormwater plan approval. The applicant's site development
project shall be reviewed as a part of the subdivision or site plan
review process by the municipal board or official from which municipal
approval is sought. That municipal board or official shall consult
the engineer retained by the Planning and/or Zoning Board (as appropriate)
to determine if all of the checklist requirements have been satisfied
and to determine if the project meets the standards set forth in this
subsection.
(3)
Site development stormwater plan checklist requirements. The following
information shall be required:
(a)
Topographic base map. The reviewing engineer may require upstream
tributary drainage system information as necessary. It is recommended
that the topographic base map of the site be submitted which extends
a minimum of 200 feet beyond the limits of the proposed development,
at a scale of one inch equals 200 feet or greater, showing two-foot
contour intervals. The map as appropriate may indicate the following:
existing surface water drainage, shorelines, steep slopes, soils,
erodible soils, perennial or intermittent streams that drain into
or upstream of the Category One waters, wetlands and floodplains along
with their appropriate buffer strips, marshlands and other wetlands,
pervious or vegetative surfaces, existing man-made structures, roads,
bearing and distances of property lines, and significant natural and
man-made features not otherwise shown.
(b)
Environmental site analysis. A written and graphic description
of the natural and man-made features of the site and its environs.
This description should include a discussion of soil conditions, slopes,
wetlands, waterways and vegetation on the site. Particular attention
should be given to unique, unusual, or environmentally sensitive features
and to those that provide particular opportunities or constraints
for development.
(c)
Project description and site plan(s). A map (or maps) at the
scale of the topographical base map indicating the location of existing
and proposed buildings, roads, parking areas, utilities, structural
facilities for stormwater management and sediment control, and other
permanent structures. The map(s) shall also clearly show areas where
alterations occur in the natural terrain and cover, including lawns
and other landscaping, and seasonal high groundwater elevations. A
written description of the site plan and justification of proposed
changes in natural conditions may also be provided.
(d)
Land use planning and source control plan. This plan shall provide a demonstration of how the goals and standards of Subsection I(3)(c) through (f) are being met. The focus of this plan shall be to describe how the site is being developed to meet the objective of controlling groundwater recharge, stormwater quality and stormwater quantity problems at the source by land management and source controls whenever possible.
(e)
Stormwater management facilities map. The following information,
illustrated on a map of the same scale as the topographic base map,
shall be included:
[1]
Total area to be paved or built upon, proposed surface contours,
land area to be occupied by the stormwater management facilities and
the type of vegetation thereon, and details of the proposed plan to
control and dispose of stormwater.
[2]
Details of all stormwater management facility designs, during
and after construction, including discharge provisions, discharge
capacity for each outlet at different levels of detention and emergency
spillway provisions with maximum discharge capacity of each spillway.
(f)
Calculations.
[1]
Comprehensive hydrologic and hydraulic design calculations for the predevelopment and post-development conditions for the design storms specified in Subsection D of this section.
[2]
When the proposed stormwater management control measures (e.g.,
infiltration basins) depend on the hydrologic properties of soils,
or require certain separation from the seasonal high water table,
then a soils report shall be submitted. The soils report shall be
based on on-site boring logs or soil pit profiles. The number and
location of required soil borings or soil pits shall be determined
based on what is needed to determine the suitability and distribution
of soils present at the location of the control measure.
(g)
Maintenance and repair plan. The design and planning of the stormwater management facility shall meet the maintenance requirements of Subsection J.
(h)
Waiver from submission requirements. The municipal official or board reviewing an application under this subsection may, in consultation with the Municipal Engineer, waive submission of any of the requirements in Subsection I(3)(a) through (f) of this section when it can be demonstrated that the information requested is impossible to obtain or it would create a hardship on the applicant to obtain and its absence will not materially affect the review process.
J.
Maintenance and repair.
(2)
General maintenance.
(a)
The design engineer shall prepare a maintenance plan for the
stormwater management measures incorporated into the design of a major
development.
(b)
The maintenance plan shall contain specific preventative maintenance tasks and schedules; cost estimates, including estimated cost of sediment, debris, or trash removal; and the name, address, and telephone number of the person or persons responsible for preventative and corrective maintenance (including replacement). The plan shall contain information on BMP location, design, ownership, maintenance tasks and frequencies, and other details as specified in Chapter 8 of the NJ BMP Manual, as well as the tasks specific to the type of BMP, as described in the applicable chapter containing design specifics.
(c)
If the maintenance plan identifies a person other than the property
owner (for example, a developer, a public agency or homeowners' association)
as having the responsibility for maintenance, the plan shall include
documentation of such person's or entity's agreement to assume this
responsibility, or of the owner's obligation to dedicate a stormwater
management facility to such person under an applicable ordinance or
regulation.
(d)
Responsibility for maintenance shall not be assigned or transferred
to the owner or tenant of an individual property in a residential
development or project, unless such owner or tenant owns or leases
the entire residential development or project. The individual property
owner may be assigned incidental tasks, such as weeding of a green
infrastructure BMP, provided the individual agrees to assume these
tasks; however, the individual cannot be legally responsible for all
of the maintenance required.
(e)
If the person responsible for maintenance identified under Subsection J(2)(c) above is not a public agency, the maintenance plan and any future revisions based on Subsection J(2)(g) below shall be recorded upon the deed of record for each property on which the maintenance described in the maintenance plan must be undertaken.
(f)
Preventative and corrective maintenance shall be performed to
maintain the function of the stormwater management measure, including
repairs or replacement to the structure; removal of sediment, debris,
or trash; restoration of eroded areas; snow and ice removal; fence
repair or replacement; restoration of vegetation; and repair or replacement
of nonvegetated linings.
(g)
The person responsible for maintenance identified under Subsection J(2)(c) above shall perform all of the following requirements:
[1]
Maintain a detailed log of all preventative and corrective maintenance
for the structural stormwater management measures incorporated into
the design of the development, including a record of all inspections
and copies of all maintenance- related work orders;
[2]
Evaluate the effectiveness of the maintenance plan at least
once per year and adjust the plan and the deed as needed; and
(i)
In the event that the stormwater management facility becomes
a danger to public safety or public health, or if it is in need of
maintenance or repair, the municipality shall so notify the responsible
person in writing. Upon receipt of that notice, the responsible person
shall have 14 days to effect maintenance and repair of the facility
in a manner that is approved by the Municipal Engineer and/or his
designee. The municipality, in its discretion, may extend the time
allowed for effecting maintenance and repair for good cause. If the
responsible person fails or refuses to perform such maintenance and
repair, the municipality or county may immediately proceed to do so
and shall bill the cost thereof to the responsible person. Nonpayment
of such bill may result in a lien on the property.
(3)
Nothing in this subsection shall preclude the municipality in which
the major development is located from requiring the posting of a performance
or maintenance guarantee in accordance with N.J.S.A. 40:55D-53.
K.
Waivers and exceptions.
(1)
Standards for relief. Waivers from strict compliance with the major
development design standards shall only be granted upon showing that
meeting the standards would result in an exceptional hardship on the
applicant or that the benefits to the public good of the deviation
from the standards would outweigh any detriments of the deviation.
A hardship will not be considered to exist if reasonable reductions
in the scope of the project would eliminate the noncompliance.
(2)
Mitigation. If the reviewing agency for the project determines that
a waiver is appropriate, the applicant must execute a mitigation plan.
The scope of the mitigation plan shall be commensurate with the size
of the project and the magnitude of the relief required. The mitigation
project may be taken from the list of projects in the municipal stormwater
management plan. All mitigation projects are subject to the approval
of the Borough Engineer.
(3)
Reviewing agency. All applications subject to the review of the Land
Use Board shall be reviewed by the Board concurrently with subdivision
or site plan review. Applications not subject to Land Use Board review
shall be reviewed by the Borough Engineer and/or his/their designee.
(4)
Appeals. The appeal of the determination of the Borough Engineer
shall be made in accordance with N.J.S.A. 40:55D-70a.
L.
Application and review fees. There shall be no additional fees for
stormwater review for applications to the Land Use Board. Minor development
applications to the Borough of Rockaway for review by the Borough
Engineer shall be accompanied by a review fee in the amount of $250.
Major development applications shall be accompanied by a review fee
in the amount of $1,000. If a project is approved, an inspection escrow
deposit shall be made in an amount to be determined by the Borough
Engineer.
M.
Violations and penalties. Any person who erects, constructs, alters,
repairs, converts, maintains, or uses any building, structure or land
in violation of this section shall, upon conviction thereof by any
court authorized by law to hear and determine the matter, be liable
to a fine of not more than $1,000, or to imprisonment for a term of
not more than 90 days, or both, as such court in its discretion may
impose. Each day during or on which a violation occurs or continues
shall be deemed a separate offense.
N.
Effective date. This section shall be in full force and effect from
and after its adoption and any publication as required by law; all
of which is adopted this 26th day of February, 2021, by the Mayor
and Council of the Borough of Rockaway.[2]
O.
Severability. Each subsection, sentence, clause and phrase of this
section is declared to be an independent subsection, sentence, clause
and phrase, and the finding or holding of any such portion of this
section to be unconstitutional, void, or ineffective for any cause,
or reason, shall not affect any other portion of this section.
[1]
Editor's Note: This ordinance also repealed
former § 170-36, Surface drainage.
A.
Any proposed stream diversion or encroachment shall
require approval of the New Jersey Department of Environmental Protection.
Preliminary development approval shall be subject to this approval.
B.
A certified copy of the stream encroachment application
to the Division of Water Resources, New Jersey Department of Environmental
Protection, shall accompany the environmental site data for any plan
for which such permit is required by state law. The applicant shall
provide copies to the Borough of all resource information submitted
to the Division of Water Resources in support of its application for
a stream encroachment permit.