The Town Engineer is hereby appointed to administer and implement the provisions of this chapter.
Application for a development permit shall be made to the Town Engineer on forms furnished by him or her prior to any development activities, and may include, but not be limited to, the following plans in duplicate: plans drawn to scale showing the nature, location, dimensions, and elevations of the area in question; dimensions and elevations of the area in question; existing or proposed structures, fill, storage of materials and drainage facilities; and the location of the foregoing. Specifically, the following information is required:
A. 
Application stage.
(1) 
An application for a development permit shall include the following:
(a) 
Elevation in relation to mean sea level of the proposed lowest floor (including basement) of all structures included in § 223-17A;
(b) 
A description of the extent to which any watercourse will be altered or relocated as a result of the proposed development;
(c) 
A statement as to whether or not the proposed alterations to an existing structure meet the criteria of the substantial improvement definition in § 223-5;
(d) 
A statement as to whether there will be dry access to the structure during the one-hundred-year storm event.
(2) 
Where applicable, the following certifications by a registered engineer or architect are required, and must be provided to the Town Engineer. The design and methods of construction must be certified to be in accordance with accepted standards of practice, and with the provisions of Article V:
(a) 
No increase in floodway heights is allowed. Any development in a floodway must meet the provisions of § 223-17B;
(b) 
Structural anchoring must meet the provisions of § 223-18C and D.
B. 
Construction stage: Upon completion of the applicable portion of construction, the applicant shall provide verification to the Town Engineer of the following as is applicable:
(1) 
Lowest floor elevation.
(a) 
For a structure in a numbered A Zone, the lowest floor elevation is the top of the lowest floor (including basement) as set forth in § 223-17A.
C. 
Deficiencies detected during the review of the above listed shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make said corrections required hereby shall be cause for the issuance of a stop-work order for the project.
Duties of the Town Engineer shall include, but not be limited to:
A. 
Reviewing all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
B. 
Reviewing all development permits to assure that the permit requirements of this chapter have been satisfied.
C. 
Advising permittees that additional federal or state permits may be required, and if specific federal or state permit requirements are known, requiring that copies of such permits be provided and maintained on file with the development permit. These may concern, without limiting the generality of the foregoing, Coastal Area Management, Water Diversion, Dam Safety, and Corps of Engineers 404.
D. 
Notifying the Regional Planning Agency and the affected municipality at least 35 days prior to the public hearing if any change of regulation or use of a flood zone will affect an area within 500 feet of another municipality.
E. 
Notifying adjacent communities and the Department of Environmental Protection, Water Resources Unit, prior to any alteration or relocation of a watercourse, and submitting evidence of such notification to the Federal Emergency Management Agency.
F. 
Assuring that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished.
G. 
Recording the elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, in accordance with § 223-17A.
H. 
Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where an apparent conflict arises between a mapped boundary and actual field conditions), the Town Engineer shall make the necessary interpretation. A person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided herein.
I. 
When base flood elevation data or floodway data have not been provided pursuant to § 223-7 hereof then the Town Engineer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source in order to administer the provisions of Article V.
J. 
All records pertaining to the provisions of this chapter shall be maintained in the office of the Town Engineer.
K. 
The Town Engineer shall cause notice of the issuance of a development permit within 15 days of its issuance to be published in a newspaper having general circulation in the Town of Orange.
L. 
The Town Engineer may request floodway data of an applicant for watercourses without FEMA-published floodways. When such data is provided by an applicant or whenever such data is available from any other source (in response to the municipality's request or not), the community shall adopt a regulatory floodway based on the principle that the floodway must be able to convey the waters of the base flood without increasing the water surface elevation more than one foot at any point within the community.
M. 
When BFEs have been determined within areas of special flood hazard on the community's FIRM but a regulatory floodway has not been designated, the Town Engineer must require that no new construction, substantial improvements, repair to structures which have sustained substantial damage or other development, including fill, shall be permitted which will increase the water surface elevation of the base flood more than one foot at any point within the community when all existing and anticipated development is considered cumulatively with the proposed development.