[HISTORY: Adopted by the Board of Trustees of the Village of Croton-on-Hudson 6-11-1979 by L.L. No. 6-1979. Amendments noted where applicable.]
GENERAL REFERENCES
Greenway Compact Plan — See Ch. 23.
Planning Board — See Ch. 40.
Building construction — See Ch. 86.
Environmental review — See Ch. 116.
Excavations — See Ch. 120.
Flood damage prevention — See Ch. 129.
Steep slopes — See Ch. 195.
Stormwater, drainage, erosion and water pollution control — See Ch. 196.
Tree preservation — See Ch. 208, Art. II.
Abandoned vehicles — See Ch. 212.
Water supply protection — See Ch. 223, Art. II.
Wetlands — See Ch. 227.