Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Shapleigh, ME
York County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
The preapplication procedure is as follows:
A. 
Applicant presentation and submission of sketch plans.
B. 
Question-and-answer period. Board makes specific suggestions to be incorporated by the applicant into subsequent submissions.
C. 
Scheduling of on-site inspection.
[Amended 3-11-2006 ATM by Art. 89]
The preapplication sketch plan shall show, in simple sketch form, a proposed layout of streets, lots and other features in relation to existing conditions. The sketch plan, which may be a freehand pencilled sketch, should be supplemented with general information to describe or outline the existing conditions of the site and the proposed development. It is recommended that the sketch plan be superimposed on or accompanied by a copy of the Assessor's Map(s) on which the land is located. The sketch plan shall be accompanied by a copy of a portion of the U.S.G.S. topographic map of the area showing the outline of the proposed subdivision, unless the proposed subdivision is less than 10 acres in size. All major subdivisions as defined herein shall comply with § 89-32 of the Subdivision Regulations and § 105-45 of the Zoning Ordinance.
Within 30 days, the Board shall determine and inform the applicant, in writing, of the required contour interval on the preliminary plan, or final plan in the case of a minor subdivision, and hold an on-site inspection of the property.
The submittal or review of the preapplication sketch plan shall not be considered the initiation of the review process for the purposes of bringing the plan under the protection of Title 1, M.R.S.A. § 3O2.