Index: B
Backfilling
ยงย 152-8—
Excavation and earthwork.
ยงย 152-10—
Pipe.
ยงย 186-10—
Water main installation.
ยงย 186-11—
Testing and sterilization.
ยงย 186-14—
Connections.
ยงย A197-12—
Construction and inspection.
ยงย A197-34—
Fine grading of subgrade.
ยงย A197-36—
Asphalt cement concrete (plant mix).
ยงย A197-61—
Trench excavation and backfill.
ยงย A197-62—
Pipe laying.
ยงย A197-63—
Catch basin and manhole installation.
Barricades
Batteries
Bed and breakfast
Bicycles
Blasting
ยงย 132-5—
Permissible acts, sounds and noises.
ยงย 132-7—
Prohibited acts and associated sounds.
ยงย 136-2—
Prohibited activities.
ยงย 152-8—
Excavation and earthwork.
ยงย 154-11—
Construction, inspection and monitoring.
194-3{113}—
PROCESSING
ยงย 194-70—
Permit for preparation of mulching materials.
ยงย A197-32—
Rough grading.
ยงย A197-90—
Securities.
Blocks
ยงย 131-6—
General regulations.
ยงย 132-6—
Acts, sounds and noises authorized; permit required.
ยงย 152-9—
Manholes.
ยงย 163-7—
Sketch plan.
ยงย 163-13—
Required improvements.
ยงย 163-17—
Streets.
ยงย 186-12—
Valves.
194-3{16}—
BUFFER
ยงย 194-116—
Improvements.
ยงย A197-51—
Catch basins.
ยงย A197-63—
Catch basin and manhole installation.
Board of Appeals
ยงย 40-2—
Designation of records access officers; responsibilities.
ยงย 65-1—
Applications deemed abandoned.
ยงย 94-2—
Appeals.
ยงย 108-14—
General standards.
110-2{5}—
ENVIRONMENTAL ADVISORY BOARD (EAB)
110-2{35}—
ZONING BOARD
ยงย 110-5—
Permit application and procedures.
ยงย 110-10—
Retention of wetlands consultants.
ยงย 117-1—
Adoption of Greenway Connections.
131-3{8}—
ZONING BOARD OF APPEALS
ยงย 131-5—
Application for license; processing.
ยงย 131-8—
Management; duties of licensees.
ยงย 134-8—
Waivers.
ยงย 144-4—
Appeal.
ยงย 154-5—
Approval authority.
ยงย 154-8—
Permit procedures.
ยงย 156-13—
Appeal of notice of violation.
157-2{2}—
APPROVING AUTHORITY
ยงย 157-5—
Applicability.
ยงย 163-8—
Major subdivision.
194-3{10}—
AUTOMOBILE SERVICE FACILITY (FORMERLY CALLED "GARAGE")
194-3{99}—
MOTOR VEHICLE REPAIR FACILITY
194-3{112}—
PREPARATION OF MULCHED MATERIALS
ยงย 194-6—
Interpretation of district boundaries.
ยงย 194-12—
Irregularly shaped lots.
ยงย 194-38—
Appropriate reviewing agency.
ยงย 194-40—
Procedures.
ยงย 194-46.9—
Hopewell Hamlet and Route 52 Corridor revitalization special permit.
ยงย 194-50—
Lots subject to flooding.
ยงย 194-55.2—
Contractors' yards.
ยงย 194-61—
Commercial stables and riding academies.
ยงย 194-68—
General.
ยงย 194-69—
Cemeteries.
ยงย 194-70—
Permit for preparation of mulching materials.
ยงย 194-74—
Private stables.
ยงย 194-75—
Land excavations and filling.
ยงย 194-76—
Commercial communications towers and antenna installations.
ยงย 194-77—
Compliance required.
ยงย 194-79—
Application for collocation or placement on an eligible structure.
ยงย 194-85—
Gasoline filling stations.
ยงย 194-86—
Automobile service facility.
ยงย 194-88—
Car washes.
ยงย 194-89—
Medical or dental clinics.
ยงย 194-90—
Accessory professional offices.
ยงย 194-98—
Walls and fences.
ยงย 194-118—
Location.
ยงย 194-122—
Changes.
ยงย 194-123—
Enlargements or extensions.
ยงย 194-130—
Undersized lots.
ยงย 194-132—
Site plan required.
ยงย 194-132.1—
Gas stations.
ยงย 194-138—
Permit required.
Ch 194 Pt 3 Art XIX—
Board of Appeals
ยงย 194-147—
Appointment; rules of conduct and procedure.
ยงย 194-148—
Powers and duties.
ยงย 194-149.1—
Appointment and designation of alternate voting members.
194-149.1A{1}—
ALTERNATE VOTING MEMBER
194-149.1A{2}—
REGULAR ZONING BOARD OF APPEALS MEMBER or ZONING BOARD MEMBER
194-149.1A{3}—
ZONING BOARD OF APPEALS or BOARD
ยงย 194-150—
Interpretation.
ยงย 194-151—
Special permits.
ยงย 194-152—
Variances.
ยงย 194-153—
Procedure.
ยงย 194-161—
Effect on public utilities.
Boats and Boating
Bonds
ยงย 1-8—
Repeal of enactments not included in Code; exceptions.
ยงย 17-2—
Powers and duties.
ยงย 94-1—
Conditions for accessory use.
ยงย 100-7—
Permitting requirements for Tier 2 solar energy systems.
ยงย 100-8—
Permitting requirements for Tier 3 solar energy systems.
ยงย 100-10—
Permit time frame and abandonment.
ยงย 110-7—
Permit limitations; certificate of completion.
ยงย 110-9—
Wetland mitigation plan requirements.
ยงย 140-7—
Insurance.
ยงย 153-6—
Temporary signs.
ยงย 157-11—
Performance guarantee; maintenance guarantee; recordkeeping.
ยงย 159-3—
Bond required.
ยงย 163-9—
Final plat.
Ch 163 Art IV—
Improvements, Bonds and Agreements
ยงย 163-11—
Completion of improvements required.
ยงย 163-12—
Performance bonds.
ยงย 163-13—
Required improvements.
ยงย 186-24—
Opening of streets; permits.
ยงย 186-30—
Water rates.
194-3{54}—
FAMILY
ยงย 194-23—
Applications procedure.
ยงย 194-26—
Standards.
ยงย 194-27—
Action by Planning Board.
ยงย 194-75—
Land excavations and filling.
ยงย 194-91.1—
Workforce housing.
ยงย 194-144—
Application for certificate.
ยงย 194-145—
Temporary certificates of occupancy.
ยงย A197-14—
Dedication.
ยงย A197-90—
Securities.
ยงย A197-94—
Building permits.
Brush, grass and weeds
100-3{5}—
NATIVE PERENNIAL VEGETATION
ยงย 110-3—
Regulated activities.
ยงย 131-6—
General regulations.
134-3{1}—
FIREWOOD
ยงย 136-2—
Prohibited activities.
ยงย 152-8—
Excavation and earthwork.
ยงย 153-7—
Design criteria.
ยงย 194-53—
Planned business neighborhood.
ยงย 194-54—
Planned commercial parks.
ยงย 194-55—
Planned research and development parks.
ยงย 194-70—
Permit for preparation of mulching materials.
ยงย A197-31—
Clearing and grubbing.
ยงย A197-38—
Restoration of disturbed areas within a right-of-way or easement.
ยงย A197-41—
Drainage easements.
ยงย A197-81—
Vegetative control measures.
ยงย A197-82—
Structural control measures.
Buffers
ยงย 105-2—
Applicability.
110-2{15}—
MITIGATION PLAN
110-2{19}—
REGULATED AREA
110-2{30}—
WETLANDS
110-2{31}—
WETLAND BUFFER AREA
ยงย 110-3—
Regulated activities.
ยงย 110-5—
Permit application and procedures.
ยงย 110-6—
Issuance or denial of permits.
ยงย 110-7—
Permit limitations; certificate of completion.
ยงย 110-8—
Applicability; prevailing standards.
ยงย 110-9—
Wetland mitigation plan requirements.
ยงย 163-19—
Lots.
ยงย 163-33—
Development standards and controls.
194-3{16}—
BUFFER
194-3{81}—
LANDSCAPE BUFFER
194-3{125}—
STRUCTURE
ยงย 194-4.2.3—
Taconic Parkway Overlay District (TPOD).
ยงย 194-22—
Development standard and controls.
ยงย 194-25—
Application.
ยงย 194-46.3—
Contractor's recycling yard.
ยงย 194-46.4—
Solid waste management facility and recyclables handling and recovery facility.
ยงย 194-46.6—
Recreational indoor sports dome facility.
ยงย 194-46.7—
Economic redevelopment special permit.
ยงย 194-53—
Planned business neighborhood.
ยงย 194-54—
Planned commercial parks.
ยงย 194-55—
Planned research and development parks.
ยงย 194-55.1—
Kennels.
ยงย 194-57—
Hospitals.
ยงย 194-59—
Large-scale recreation developments and camps.
ยงย 194-60—
Churches, schools and other public uses.
ยงย 194-62—
Nursing homes and alternative care housing.
ยงย 194-64—
Historic structures.
ยงย 194-65—
Subdivision recreation areas.
ยงย 194-67—
Outdoor recreation developments.
ยงย 194-67.1—
Shared driveways.
ยงย 194-67.5—
Contractors' and commercial vehicle storage yards on agricultural parcels.
ยงย 194-69—
Cemeteries.
ยงย 194-70—
Permit for preparation of mulching materials.
ยงย 194-71—
Membership clubs.
ยงย 194-80—
Application for a special permit to place new commercial communications tower.
ยงย 194-82—
Standards for issuing a special permit.
ยงย 194-86—
Automobile service facility.
ยงย 194-89—
Medical or dental clinics.
ยงย 194-109—
Landscaping, screening and buffer areas.
ยงย 194-112.2—
Boundary markers for wetlands, wetland buffers, conservations easements or any other sensitive environmental lands.
ยงย 194-116—
Improvements.
ยงย A197-21—
Classes and right-of-way.
Building construction
Ch 57—
Alarms
Ch 80—
Building Construction and Fire Prevention
Ch 80 Art I—
Department of Engineering; Code Administration
ยงย 80-7—
Code Enforcement Officer and inspectors.
Ch 96—
Electrical Standards
Ch 100—
Energy
Ch 108—
Flood Damage Prevention
Ch 144—
Property Maintenance
Ch 157—
Stormwater Management and Erosion and Sediment Control
ยงย 157-5—
Applicability.
ยงย 194-23—
Applications procedure.
Ch 194 Pt 3 Art XVII—
Building Permits
ยงย A197-94—
Building permits.
ยงย A197-95—
Certificate of occupancy.
ยงย DL-1—
Disposition of legislation.
Building Inspector
57-2{4}—
ALARM ADMINISTRATOR
57-2{20}—
ENFORCEMENT OFFICIAL
ยงย 57-3—
Application for installation and user permits, general provisions.
ยงย 57-4—
System certification.
ยงย 57-8—
Emergency response repository container units (lock box).
ยงย 57-10—
Remedies and penalties.
ยงย 57-11—
Reconnection of fire alarm system.
ยงย 57-17—
Appeals.
80-6{3}—
CODE ENFORCEMENT OFFICER
ยงย 87-4—
Investigation and report.
ยงย 87-7—
Hearing.
ยงย 96-5—
Penalties for offenses.
ยงย 96-6—
Qualified Electrical Inspectors.
ยงย 96-7—
Duties of qualified Electrical Inspectors.
108-4B{25}—
LOCAL ADMINISTRATOR
110-2{2}—
APPROVAL AUTHORITY
110-2{4}—
BUILDING INSPECTOR
ยงย 110-5—
Permit application and procedures.
ยงย 110-7—
Permit limitations; certificate of completion.
ยงย 110-10—
Retention of wetlands consultants.
ยงย 110-11—
Penalties for offenses.
131-3{1}—
BUILDING INSPECTOR
ยงย 131-5—
Application for license; processing.
ยงย 131-7—
Sanitary and other facilities.
ยงย 131-8—
Management; duties of licensees.
ยงย 131-9—
Fire and accident provisions.
ยงย 132-6—
Acts, sounds and noises authorized; permit required.
ยงย 134-4—
Permit required.
ยงย 134-5—
Existing outdoor furnaces.
ยงย 134-7—
Suspension of permit.
ยงย 140-10—
Restrictions.
ยงย 140-11—
Enforcement.
ยงย 152-11—
Building sewers.
ยงย 152-15—
Penalties for offenses.
ยงย 153-16—
Penalties for offenses.
ยงย 154-5—
Approval authority.
ยงย 154-8—
Permit procedures.
ยงย 154-11—
Construction, inspection and monitoring.
ยงย 154-12—
Applicability; effect on other provisions.
ยงย 154-13—
Penalties for offenses.
157-2{2}—
APPROVING AUTHORITY
157-2{35}—
STORMWATER MANAGEMENT OFFICER
ยงย 157-5—
Applicability.
ยงย 157-9—
Maintenance and repair of stormwater facilities.
ยงย 157-12—
Enforcement; penalties for offenses.
ยงย 189-8—
Enforcement.
ยงย 189-10—
Responsibility for enforcement.
ยงย 194-4.2.1—
Hamlet Center District.
ยงย 194-4.2.3—
Taconic Parkway Overlay District (TPOD).
ยงย 194-28—
Appointment; membership.
ยงย 194-30—
Submission procedures.
ยงย 194-33—
Effect on other approvals.
ยงย 194-46.3—
Contractor's recycling yard.
ยงย 194-46.4—
Solid waste management facility and recyclables handling and recovery facility.
ยงย 194-55.5—
Chickens.
ยงย 194-74—
Private stables.
ยงย 194-75—
Land excavations and filling.
ยงย 194-80—
Application for a special permit to place new commercial communications tower.
ยงย 194-83—
Conditions on special permits.
ยงย 194-91—
Accessory residential units in residential districts.
ยงย 194-91.1—
Workforce housing.
ยงย 194-102—
Exterior lighting.
ยงย 194-108—
Construction sheds.
ยงย 194-116—
Improvements.
ยงย 194-163—
Complaints of violations.
ยงย 194-164—
Affordable Housing.
ยงย A197-76—
Driveways.
ยงย A197-94—
Building permits.
ยงย A197-95—
Certificate of occupancy.
Building permits
80-6{1}—
BUILDING PERMIT
80-6{10}—
PERMIT HOLDER
ยงย 80-7—
Code Enforcement Officer and inspectors.
ยงย 80-8—
Building permits.
ยงย 80-9—
Construction inspections.
ยงย 80-10—
Stop-work orders.
ยงย 80-11—
Certificates of occupancy/certificates of compliance.
ยงย 80-17—
Recordkeeping.
ยงย 80-19.1—
Occupancy permits.
ยงย 80-20—
Enforcement; penalties for offenses.
ยงย 80-21—
Fees.
ยงย 100-5—
General requirements.
ยงย 100-6—
Permitting requirements for Tier 1 solar energy systems.
ยงย 100-10—
Permit time frame and abandonment.
ยงย 103-7—
Approvals prohibited prior to payment.
ยงย 105-2—
Applicability.
ยงย 132-6—
Acts, sounds and noises authorized; permit required.
ยงย 152-3—
Permits.
ยงย 157-6—
Exemptions.
163-4{5}—
CONDITIONAL APPROVAL OF A FINAL PLAT
ยงย 186-3—
Permits.
ยงย 189-8—
Enforcement.
ยงย 194-4.2.3—
Taconic Parkway Overlay District (TPOD).
ยงย 194-14—
Average density subdivisions.
ยงย 194-23—
Applications procedure.
ยงย 194-24—
General.
ยงย 194-27—
Action by Planning Board.
ยงย 194-29—
Functions of ARC.
ยงย 194-33—
Effect on other approvals.
ยงย 194-34—
Enforcement; penalties for offenses.
ยงย 194-37—
General.
ยงย 194-55.5—
Chickens.
ยงย 194-67.1—
Shared driveways.
ยงย 194-67.2—
Assisted living and congregate care facilities.
ยงย 194-67.4—
Senior independent living apartment complexes.
ยงย 194-75—
Land excavations and filling.
ยงย 194-77—
Compliance required.
ยงย 194-79—
Application for collocation or placement on an eligible structure.
ยงย 194-80—
Application for a special permit to place new commercial communications tower.
ยงย 194-83—
Conditions on special permits.
ยงย 194-102—
Exterior lighting.
ยงย 194-107—
Accessory structures.
ยงย 194-108—
Construction sheds.
ยงย 194-131—
Lots in approved subdivisions.
ยงย 194-132—
Site plan required.
ยงย 194-134—
Enforcement officer.
ยงย 194-137—
Reports.
Ch 194 Pt 3 Art XVII—
Building Permits
ยงย 194-138—
Permit required.
ยงย 194-139—
Application for permit.
ยงย 194-140—
Fees.
ยงย 194-141—
Expiration of permits.
ยงย 194-142—
Records.
ยงย 194-144—
Application for certificate.
ยงย 194-164—
Affordable Housing.
ยงย A197-31—
Clearing and grubbing.
ยงย A197-94—
Building permits.
Burning