Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of Elma, NY
Erie County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: F
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Fees
ยงย 1-10— Sale of Code book; supplementation. ยงย 8-5— Powers and duties. ยงย 10-3— Standards of conduct. ยงย 34-2— Designation of records access officer; powers and duties. ยงย 34-8— Fees for copies. ยงย 42-4— Licensing and registration. ยงย 42-6— Revocation; hearing. ยงย 43-6— Charges for avoidable alarms. ยงย 43-9— Payment of charges. ยงย 43-10— Failure to remit fee. ยงย 43-12— Penalties for offenses. ยงย 48-4— Issuance of license; fee. ยงย 48-5— Transmittal of certain fees to state. ยงย 50-7— Permit application contents and permitting fees. ยงย 50-12— Penalties for offenses. ยงย 52-3— Building permit fees. ยงย 52-4— Recreation filing fee. ยงย 52-5— Issuance of building permits. ยงย 52-6— Appeal upon denial of permit; fee. ยงย 52-13— Use of wood foundations. ยงย 52-17— Code Enforcement Officer and inspectors. ยงย 52-18— Building permits. ยงย 52-19— Construction inspections. ยงย 52-21— Certificates of occupancy and certificates of compliance. ยงย 52-25— Fire safety and property maintenance inspections. ยงย 52-29— Recordkeeping. ยงย 52-32— Fees. ยงย 56-7— Hearing findings. ยงย 56-11— Reimbursements for costs incurred by Town. ยงย 59-7— Application for permit. ยงย 59A-4— Tower special use permits application materials. ยงย 59A-9— Procedures. ยงย 59B-4— Enforcement and penalties for offenses. ยงย 59B-5— Fee schedule. ยงย 60-9— Application; fee; review; determination. ยงย 65-2— Licensing of dogs. ยงย 65-10— Penalties for offenses. ยงย 70-2— Purpose. ยงย 73-4— Fee; term of license; renewal. ยงย 75-7— Permits; fees. ยงย 75-14— Fee. ยงย 77-1— Drainage plan required. ยงย 82-12— Floodplain development permit. ยงย 82-13— Application for permit. ยงย 82-15— General standards. ยงย 97-3— Adoption of standards. ยงย 97-13— Water supply. ยงย 105-11— Exemptions. ยงย 105-12— Fees. 115-5{21}— CONNECTION CHARGE (TAP FEE) 115-5{108}— SEWERAGE SURCHARGE 115-5{137}— VOLUME CHARGE (USER CHARGE) ยงย 115-21— Construction permit application. ยงย 115-29— New sewers subject to approval, fees, inspection, testing, and reporting. Ch 115 Art VI— Building Laterals, Street Laterals Connections, and Fees ยงย 115-49— Sewer lateral permits. ยงย 115-72— Public safety provisions required; restoration of disturbed areas. ยงย 115-79— Charges for inflow. ยงย 115-80— Licenses and application. ยงย 115-99— Application for wastewater discharge permits. ยงย 115-101— Permit conditions. ยงย 115-127— Termination of permit. ยงย 115-133— Civil actions for penalties. ยงย 115-145— Surcharge for abnormal sewage. ยงย 115-148— Measurement of flow. ยงย 115-150— Pretreatment program costs. ยงย 115-153— Collection of charges. ยงย 115-155— Impact fees. ยงย 115-156— Use of revenues. ยงย 117-3— Application for preliminary site plan approval. ยงย 117-7— Planning Board action on final detailed site plan. ยงย 117-8— Reimbursable costs. ยงย 118-3— Purpose. ยงย 118-7— Billing and collection. ยงย 118A-11— Special use permit requirements. ยงย 118A-16— Inspections; continued operation. Ch 119 Art I— Refuse Fee ยงย 119-1— Assessment, payment and collection of fee; amount. ยงย 119-11— Tires. ยงย 119-12— Authorized collectors; license required. ยงย 120-4— Procedure. ยงย 120-8— Administration and enforcement; penalties for offenses. ยงย 121-6— Fees; grant or denial of permit. ยงย 123-6— Preapplication and classification. ยงย 123-7— Minor subdivision plat. ยงย 123-8— Major subdivision preliminary plat. ยงย 123-9— Major subdivision final plat. ยงย 123-11— Required public improvements; design and installation standards; inspections. ยงย 123-12— Performance bonds. ยงย 140-5— Fees payable prior to issuance. ยงย 140-8— Inspections; fee. ยงย 140-10— Taps and connections. ยงย 140-18— Fee. ยงย 140-19.1— Service for duplex buildings. ยงย 140-22— Supply and installation. ยงย 140-23— Deposits. ยงย 140-32— Water used for construction purposes. ยงย 140-39— Permanent shutoff of service. ยงย 140-55— Process. ยงย 144-67— Camps. ยงย 144-89— Prohibited and permitted uses. ยงย 144-102.1— Signs. ยงย 144-113— Appeals; fee. ยงย 144-146— Procedure; fee. ยงย 144-150— Licenses and permits. ยงย 144-153— Procedure. ยงย 144-155— Exceptions.
Fences
50-3B{3}— AGRICULTURE ยงย 50-15— Special conditions. ยงย 59-3— Shop requirements. ยงย 59A-4— Tower special use permits application materials. ยงย 59A-5— Communications facility standards. ยงย 60-2— Dealers. ยงย 75-4— Sand bank and gravel pits and pit excavations. ยงย 87-4— Certificate of appropriateness for alteration, demolition or new construction. ยงย 97-10— Setbacks, buffer strips and screening. ยงย 117-3— Application for preliminary site plan approval. ยงย 118A-10— Large utility-scale solar energy systems. ยงย 118A-11— Special use permit requirements. ยงย 120-3— General provisions. ยงย 123-17— Design standards. ยงย 130-8— Location of towers; noise restrictions. ยงย 144-19— Excavations. ยงย 144-24— Visibility at intersections. ยงย 144-29— Obstructions in public rights-of-way. ยงย 144-44— Site requirements. ยงย 144-79— Design standards. ยงย 144-86.3— Design standards. ยงย 144-86.8— Permitted uses. ยงย 144-86.13— Design standards. ยงย 144-90— District regulations. ยงย 144-93.9— Design standards. ยงย 144-142— Guidelines to be considered. ยงย 144-142.4— Objectives. ยงย 144-142.7— Other zoning requirements and design standards. ยงย 144-142.11— Objectives. ยงย 144-142.14— Other zoning requirements and design standards. ยงย 144-142.18— Objectives. ยงย 144-142.21— Other zoning requirements and design standards. ยงย 144-142.25— Objectives. ยงย 144-142.28— Other zoning requirements and design standards. ยงย 144-151— Standards for all tanks.
Fines
ยงย 1-11— Penalties for tampering with Code. ยงย 10-6— Penalties for offenses. ยงย 42-7— Penalties for offenses. ยงย 43-8— Notice of violation and review. ยงย 50-9— Bonds and insurance. ยงย 50-12— Penalties for offenses. ยงย 50-15— Special conditions. ยงย 52-8— Inspection of buildings; condemnation of noncomplying buildings; penalty for removal of condemnation notice. ยงย 52-9— Penalties for offenses. ยงย 52-31— Remedies; appearance tickets; penalties for offenses; injunctive relief. ยงย 56-13— Penalties for offenses. ยงย 59-8— Penalties for offenses. ยงย 59B-4— Enforcement and penalties for offenses. ยงย 59B-5— Fee schedule. ยงย 65-10— Penalties for offenses. ยงย 68-7— Penalties for offenses. ยงย 68-9— Penalties for offenses. ยงย 75-10— Penalties for offenses. ยงย 77-1— Drainage plan required. ยงย 77-2— Penalties for offenses. ยงย 82-9— Penalties for noncompliance. ยงย 87-12— Penalties for offenses. ยงย 105-6— Penalties for offenses. ยงย 115-33— Sewer pipe installation. ยงย 115-105— Permit revocation. ยงย 115-125— Administrative fines. ยงย 115-127— Termination of permit. ยงย 115-129— Show-cause hearing. ยงย 115-130— Failure of user to petition Superintendent. ยงย 115-135— Criminal penalties. ยงย 115-141— Informant rewards. ยงย 115-174— Enforcement; penalties for offenses. ยงย 116-5— Penalties for offenses. ยงย 118-5— Penalties for offenses. ยงย 118A-13— Violations. ยงย 118A-20— Penalties for offenses. 119-3{20}— PAPER ยงย 119-13— Failure to comply; enforcement procedure; inspections and appearance tickets. ยงย 119-15— Penalties for offenses. ยงย 120-8— Administration and enforcement; penalties for offenses. ยงย 134-5— Penalties for offenses. ยงย 134-9— Penalties for offenses. ยงย 140-51— Penalties for offenses. ยงย 144-124— Penalties for offenses; notice. ยงย 144-135— Special use permits. ยงย 144-154— Penalties for offenses.
Fires
ยงย 42-4— Licensing and registration. Ch 43— Alarm Systems ยงย 43-1— Purpose. 43-2{1}— ALARM SYSTEM 43-2{3}— EMERGENCY AGENCY ยงย 43-7— Notice of excessive use. ยงย 43-11— Enforcement. ยงย 50-6— Permit application procedures. ยงย 52-13— Use of wood foundations. ยงย 52-15— Purpose and intent. 52-16{9}— FCNYS 52-16{10}— FIRE SAFETY AND PROPERTY MAINTENANCE INSPECTION 52-16{25}— UNIFORM CODE ยงย 52-17— Code Enforcement Officer and inspectors. ยงย 52-19— Construction inspections. ยงย 52-21— Certificates of occupancy and certificates of compliance. ยงย 52-22— Notification regarding fire or explosion. ยงย 52-24— Operating permits. ยงย 52-25— Fire safety and property maintenance inspections. ยงย 52-27— Condition assessments of parking garages. ยงย 52-32— Fees. Ch 56— Buildings, Unsafe 56-2{2}— UNSAFE BUILDING Ch 59— Collision Shops ยงย 59-3— Shop requirements. ยงย 59-4— Equipment. ยงย 59A-4— Tower special use permits application materials. ยงย 59B-11— Plumbing. ยงย 60-8— Requirements. Ch 71— Electrical Standards ยงย 71-1— Inspectors designated. ยงย 71-3— Application and certification required for electrical work. Ch 79— Fire Prevention Ch 97— Mobile Home Parks ยงย 97-16— Community service facilities. ยงย 97-17— Refuse. ยงย 97-20— Fire protection. ยงย 115-85— General prohibitions. ยงย 117-3— Application for preliminary site plan approval. ยงย 117-4— Planning Board review of preliminary site plan. ยงย 118-2— Findings; legislative intent. ยงย 118-3— Purpose. 118-4{7}— RESPONSE COSTS ยงย 118-6— Recovery of response costs. ยงย 118-7— Billing and collection. ยงย 118A-6— General regulations. ยงย 118A-10— Large utility-scale solar energy systems. ยงย 123-2— Declaration; objectives. ยงย 123-6— Preapplication and classification. ยงย 123-11— Required public improvements; design and installation standards; inspections. ยงย 123-16— General requirements. ยงย 123-17— Design standards. ยงย 123-20— Major subdivision preliminary plat. ยงย 123-21— Major subdivision final plat. ยงย 134-3— No parking on certain streets. ยงย 140-40— Fire service connections; lawn sprinkler connections. ยงย 140-43— Responsibility for facilities within streets or easements. ยงย 140-45— Fire hydrants. Ch 144— Zoning ยงย 144-1— Statutory authority; purpose. ยงย 144-10— Nonconforming uses, buildings and lots. ยงย 144-89— Prohibited and permitted uses. ยงย 144-92— Performance standards. ยงย 144-141— Special procedure for multiple dwellings. ยงย 144-142— Guidelines to be considered. ยงย 144-146— Procedure; fee.