Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Borough of Lake City, PA
Erie County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: R
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Records
ยงย 8-6— Approval of plats. ยงย 10-14— Intervening military service credit. ยงย 15-3— Submission of ordinance to Secretary of Commonwealth. ยงย 22-9— Board of Adjustment. ยงย 30-8— Duties and responsibilities of the Floodplain Administrator. ยงย 30-18— Description and special requirements of identified floodplain areas. ยงย 30-23— Elevation and floodproofing requirements. ยงย 30-36— Variance procedures and conditions. 30-38{9}— DECLARATION OF LAND RESTRICTION (NONCONVERSION AGREEMENT) ยงย 43-4— Procedure for abatement; costs. ยงย 52-54— Wastewater discharge permit revocation. ยงย 52-69— Recordkeeping. ยงย 52-70— Right of entry: inspection and sampling. ยงย 52-76— Show-cause hearing. ยงย 52-84— Criminal prosecution. ยงย 54B-15— Waivers. ยงย 54B-22— Easement. ยงย 54B-26— SWM site plan and report contents. ยงย 54B-31— Authorization to construct; term of validity. ยงย 54B-32— Record drawings; completion certificate; final inspection. ยงย 54B-33— Easements. ยงย 54B-34— Financial guarantee. ยงย 54B-35— Maintenance responsibilities. ยงย 54B-36— Maintenance agreement for privately owned stormwater facilities. ยงย 54B-45— Prohibited discharges and connections. ยงย 54B-50— Recording of approved SWM site plan and related agreements. ยงย 55-22— Requirements for work; correction of unsatisfactory work; completion of incomplete work. ยงย 57-5— Compliance. 57-13{21}— LOT OF RECORD 57-13{30}— PLAN, FINAL SUBDIVISION ยงย 57-16— Approval of final plan. ยงย 57-17— Recording. ยงย 57-18— Completion of improvements or guaranty. ยงย 57-46— Final plan. ยงย 57-50— Preventive remedies. ยงย 57-111— Record; appeal. ยงย 61-6— Powers and duties of officer. ยงย 61-9— Violations and penalties. ยงย 62-7— Recordkeeping. ยงย 63-6— Dates for determining tax liability and payment. ยงย 63-10— Administration of tax. ยงย 63-12— Violations and penalties. 65-3{3}— DOCUMENT 65-3{10}— TRANSACTION ยงย 65-4— Imposition of tax; interest. ยงย 65-6— Excluded transaction ยงย 65-8— Acquired companies. ยงย 65-12— Duties of Recorder of Deeds. ยงย 65-13— Statement of value. ยงย 65-14— Civil penalty. ยงย 70-10— Turning on and shutting off of water. ยงย 72-22— Application of area, lot, yard and height requirements. ยงย 72-24— Nonconforming lots of record. ยงย 72-29— Structure on small lot of record. ยงย 72-48— Office of Zoning Officer. ยงย 72-50— Application for permit and certificate of use and occupancy. ยงย 72-51— Action on permits and certificates of use and occupancy. ยงย 72-58— Functions. 72-68{42}— DWELLING, SINGLE-FAMILY 72-68{65}— LOT OF RECORD ยงย A80-2— Street vacations. ยงย A81-3— Compensation to the Borough. ยงย A81-7— Regulation by Borough. ยงย A81-9— Franchise violations and revocation.
Reports
ยงย 7-4— Duties. ยงย 8-2— Membership and organization of Commission; contractual powers. ยงย 10-2— Administration. ยงย 16A-4— Report of Commission. ยงย 30-8— Duties and responsibilities of the Floodplain Administrator. ยงย 30-36— Variance procedures and conditions. 30-38{15}— FLOOD INSURANCE STUDY (FIS) ยงย 32-9— Report to Council. ยงย 52-31— Purpose and policy. ยงย 52-48— Application signatures and certification. ยงย 52-51— Wastewater discharge permit contents. ยงย 52-52— Wastewater discharge permit modification. ยงย 52-54— Wastewater discharge permit revocation. Ch 52 Pt 3 Art VIII— Reporting Requirements ยงย 52-57— Baseline monitoring reports. ยงย 52-58— Compliance schedule progress reports. ยงย 52-59— Reports on compliance with categorical pretreatment standard deadline. ยงย 52-60— Periodic compliance reports. ยงย 52-61— Reports of changed conditions. ยงย 52-62— Reports of potential problems. ยงย 52-63— Reports from unpermitted users. ยงย 52-64— Notice of violation/repeat sampling and reporting. ยงย 52-66— Analytical requirements. ยงย 52-68— Timing. ยงย 52-69— Recordkeeping. ยงย 52-72— Restrictions on release. ยงย 52-73— Criteria for publication. ยงย 52-81— Termination of discharge. ยงย 52-84— Criminal prosecution. ยงย 52-92— Bypass. ยงย 52-94— Pretreatment charges and fees. ยงย 54A-11— Regulations for residential, multiple family, commercial, municipal and institutional uses. 54B-12{39}— HYDROLOGIC SOIL GROUP (HSG) ยงย 54B-20— Protected watershed requirements. ยงย 54B-23— Design criteria for stormwater management and drainage facilities. Ch 54B Art VIII— SWM Site Plan and Report Requirements ยงย 54B-26— SWM site plan and report contents. ยงย 54B-27— SWM site plan and report submission. ยงย 54B-28— SWM site plan and report review. ยงย 54B-29— Modification of plans. ยงย 54B-30— Resubmission of disapproved SWM site plan and report. ยงย 54B-31— Authorization to construct; term of validity. ยงย 54B-32— Record drawings; completion certificate; final inspection. ยงย 54B-34— Financial guarantee. ยงย 54B-35— Maintenance responsibilities. ยงย 54B-36— Maintenance agreement for privately owned stormwater facilities. ยงย 54B-37— Schedule of inspections. ยงย 54B-49— Expenses covered by fees. ยงย 57-10— Erie County Department of Planning Review. ยงย 57-15— Conditional approval of preliminary plan. ยงย 57-16— Approval of final plan. ยงย 57-19— Release from improvement bond. 61-2{10}— NET PROFITS ยงย 61-4— Declaration and payment of tax. ยงย 61-5— Collection at source. ยงย 61-6— Powers and duties of officer. ยงย 65-12— Duties of Recorder of Deeds. ยงย 70-8— Sealing of meters. ยงย 70-10— Turning on and shutting off of water. ยงย 72-11— Classification of annexed lands. ยงย 72-47.2— Alternative tower structures, communications towers and other towers. ยงย 72-57— General. ยงย 72-58— Functions. 72-68{89}— REPORT ยงย A81-3— Compensation to the Borough. ยงย A81-8— Reporting requirements. ยงย A81-13— Miscellaneous.