Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Township of Scott, PA
Columbia County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: S
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Safety standards
ยงย 1-7— Interpretation of provisions. ยงย 5-10— Purpose. ยงย 41-1— Purpose. ยงย 52-1— Prohibited vegetation. 55-1A{2}— DANGEROUS BUILDING ยงย 55-3— Standards for repair, vacation or demolition. ยงย 90-3— Purpose. 90-5{6}— NOISE DISTURBANCE ยงย 90-7— Exemptions. ยงย 96-10— Denial, suspension and revocation of license; appeal. ยงย 100-2— Modification to standards. 102-1A{3}— NUISANCE ยงย 102-2— Prohibited nuisances. ยงย 102-4— Inspection of premises; notice to comply. 102-9A{2}— NUISANCE ยงย 102-10— Storage prohibited. ยงย 102-12— Inspection of premises; notice to comply. ยงย 104-2— Purpose. ยงย 104-6— Buildings and structures. ยงย 104-7— Yards; open lots; parking areas. ยงย 104-9— Miscellaneous provisions. ยงย 104-13— Notice to comply. ยงย 112-29— Purpose. ยงย 112-52— Purpose. ยงย 112-55— Purpose. ยงย 115-9— Storage may not create health and safety hazards. ยงย 115-24— Declaration of policy. ยงย 115-29— Collection vehicles, equipment and personnel. Ch 118— Stormwater Management ยงย 118-2— Authority. ยงย 118-4— Purpose. ยงย 118-14— Design standards. ยงย 123-2— Purpose. ยงย 123-15— Applicability. ยงย 123-17— Street system. ยงย 123-19— Street width. ยงย 123-23— Street intersections. ยงย 123-25— Curbs. ยงย 123-29— Sidewalks. ยงย 123-50— Fuel systems. 126-35{3}— IMPROVEMENT ยงย 135-2— Authority. ยงย 135-3— General purposes. ยงย 135-4— Community development objectives. 135-7{84}— FREEBOARD 135-7{98}— HAZARDOUS MATERIALS 135-7{128}— MINOR REPAIR 135-7{174}— REGULATORY FLOOD ELEVATION 135-7{212}— SUBSTANTIAL IMPROVEMENT ยงย 135-9— District purpose statements. ยงย 135-18— Mobile homes on individual lots. ยงย 135-29— Recreation facilities; parks or playgrounds. ยงย 135-35— Industrial operations. ยงย 135-38— Mineral extraction operations. ยงย 135-41.1— Intensive raising of livestock and poultry. ยงย 135-43— Public utility services. ยงย 135-45— Home occupations. ยงย 135-49.3— Flex community. ยงย 135-49.4— Accessory solar energy system (ASES). ยงย 135-49.5— Principal solar energy system (PSES). ยงย 135-49.6— Noncommercial windmill. ยงย 135-49.7— Commercial wind energy facilities. ยงย 135-59— General provisions. ยงย 135-60— Administration. ยงย 135-65— Variances. ยงย 135-71— General regulations. ยงย 135-72— A-R, R-S and R-U Districts. ยงย 135-73— C, IC, I and LI Districts. ยงย 135-74— FF and FP Districts. ยงย 135-75— FW District. ยงย 135-78— Driveways and access drives. ยงย 135-79— Nonconforming uses and structures. ยงย 135-82— Powers and duties. ยงย 135-83— Hearing procedures. ยงย 135-91— Interpretation. ยงย 135-93— Introduction and intent. ยงย 135-95— Findings and declaration of policy. ยงย 135-105— Standards applicable to new airports and changes to existing airports. ยงย 135-106— General. ยงย 135-107— General.
Screens and screening
ยงย 102-3— Permitted storage of nuisances. ยงย 102-11— Storage requirements. ยงย 104-8— Infestation prevention and correction. Ch 118— Stormwater Management ยงย 118-14— Design standards. 123-6{8}— BUFFER 123-6{58}— SHADOW ANALYSIS ยงย 123-26— Street construction. ยงย 123-32— Tree protection and installation. ยงย 123-47— Refuse disposal. ยงย 123-50— Fuel systems. ยงย 123-53— Common open space and buffers. ยงย 123-57— Construction required. 135-7{183}— SCREEN PLANTING ยงย 135-9— District purpose statements. ยงย 135-19— Single-family attached dwellings. ยงย 135-21— Multifamily housing developments. ยงย 135-23— Boardinghouses or rooming houses; bed-and-breakfast establishments. ยงย 135-24— Student housing facilities. ยงย 135-25— Group homes. ยงย 135-26— Day-care centers. ยงย 135-28— Campgrounds or recreational vehicle parks. ยงย 135-29— Recreation facilities; parks or playgrounds. ยงย 135-30— Retail establishments. ยงย 135-31— Automotive service stations; repair shops. ยงย 135-33— Adult entertainment establishments. ยงย 135-34— Kennels. ยงย 135-35— Industrial operations. ยงย 135-37— Contractors' shops and yards. ยงย 135-38— Mineral extraction operations. ยงย 135-39— Junkyards/scrap-processing facilities. ยงย 135-40— Sanitary or municipal waste landfills. ยงย 135-43— Public utility services. ยงย 135-46— Accessory residential uses. ยงย 135-49.3— Flex community. ยงย 135-49.4— Accessory solar energy system (ASES). ยงย 135-49.6— Noncommercial windmill. ยงย 135-55— Buffer yards. ยงย 135-56— Screen planting. ยงย 135-57— Storage of unlicensed vehicles in residential districts. ยงย 135-58— Outdoor, unenclosed storage. ยงย 135-62— Technical provisions. ยงย 135-76— Off-street parking requirements. ยงย 135-82— Powers and duties. ยงย 135-106— General.
Security standards
ยงย 20-13— Power to enter into contracts. ยงย 39-8— Requirements for regulated social gathering. ยงย 39-9— Application. ยงย 55-3— Standards for repair, vacation or demolition. ยงย 104-6— Buildings and structures. ยงย 104-12— Inspection. ยงย 112-5— Financial security. ยงย 112-10— Transfer of real estate served by holding tanks. ยงย 112-14— Description of debt. ยงย 112-40— Properties to be connected separately. ยงย 112-42— Connection requirements. ยงย 118-6— Compatibility. ยงย 118-12— Plan content. ยงย 118-18— Additional general criteria. ยงย 118-22— Enforcement. ยงย 120-7— Commencement of work; performance standards. ยงย 123-2— Purpose. 123-6{28}— GUARANTY, MAINTENANCE 123-6{29}— GUARANTY, PERFORMANCE ยงย 123-7— General procedure. ยงย 123-10— Major subdivision and land development procedure. ยงย 123-17— Street system. ยงย 123-50— Fuel systems. ยงย 123-62— Maintenance guaranty. ยงย 123-63— Modification of standards. 126-16{3}— DOCUMENT ยงย 126-19— Excluded transactions. ยงย 126-38— Procedure for obtaining exemption. 135-7{61}— DOCK ยงย 135-29— Recreation facilities; parks or playgrounds. ยงย 135-44— Swimming pools. ยงย 135-49— Docks, piers and other water-related uses. ยงย 135-49.1— Communications antennas, communications equipment buildings and communications towers. ยงย 135-49.4— Accessory solar energy system (ASES). ยงย 135-49.5— Principal solar energy system (PSES). ยงย 135-49.7— Commercial wind energy facilities. ยงย 135-62— Technical provisions. ยงย 135-71— General regulations. ยงย 135-83— Hearing procedures. ยงย 135-89— Violations and penalties; enforcement. ยงย 135-95— Findings and declaration of policy. ยงย 135-100— Permits. ยงย 135-103— Enforcement and notice.
Setbacks
123-6{55}— SETBACK (BUILDING SETBACK LINE) ยงย 123-12— Preliminary plan. ยงย 123-13— Final plan. ยงย 123-31— Lots and lot sizes. ยงย 123-53— Common open space and buffers. Ch 135— Zoning 135-7{33}— BUILDING LINE OR BUILDING SETBACK LINE 135-7{118}— LOT ยงย 135-18— Mobile homes on individual lots. ยงย 135-21— Multifamily housing developments. ยงย 135-28— Campgrounds or recreational vehicle parks. ยงย 135-29— Recreation facilities; parks or playgrounds. ยงย 135-35— Industrial operations. ยงย 135-36— Warehousing and storage facilities. ยงย 135-38— Mineral extraction operations. ยงย 135-39— Junkyards/scrap-processing facilities. ยงย 135-41.1— Intensive raising of livestock and poultry. ยงย 135-49.1— Communications antennas, communications equipment buildings and communications towers. ยงย 135-49.3— Flex community. ยงย 135-49.4— Accessory solar energy system (ASES). ยงย 135-49.5— Principal solar energy system (PSES). ยงย 135-49.6— Noncommercial windmill. ยงย 135-49.7— Commercial wind energy facilities. ยงย 135-51— Lot requirements. ยงย 135-52— Yard requirements. ยงย 135-57— Storage of unlicensed vehicles in residential districts. ยงย 135-58— Outdoor, unenclosed storage. ยงย 135-71— General regulations. ยงย 135-72— A-R, R-S and R-U Districts. ยงย 135-73— C, IC, I and LI Districts. ยงย 135-87— Building/zoning permits. ยงย 135-106— General.
Signs
ยงย 20-5— Adoption of agreement. ยงย 39-9— Application. 55-1A{12}— STRUCTURE ยงย 112-4— Permits and applications. ยงย 115-8— License to collect municipal waste of others. ยงย 120-4— Bond and insurance requirements. 123-6{31}— IMPROVEMENTS ยงย 123-10— Major subdivision and land development procedure. ยงย 123-13— Final plan. ยงย 123-23— Street intersections. ยงย 123-57— Construction required. ยงย 130-3— Temporary and emergency regulations. ยงย 130-4— Experimental regulations. ยงย 130-5— Streets closed or restricted for construction, maintenance or special events. ยงย 130-15— Stop intersections. ยงย 130-16— Yield intersections. ยงย 130-19— Parking restrictions. ยงย 130-47— Schedule IX: Stop Intersections. ยงย 130-48— Schedule X: Yield Intersections. Ch 135— Zoning 135-7{143}— NONCONFORMING STRUCTURE 135-7{187}— SIGN 135-7{188}— SIGN AREA ยงย 135-32— Public entertainment facilities. ยงย 135-41.1— Intensive raising of livestock and poultry. ยงย 135-45— Home occupations. ยงย 135-49.1— Communications antennas, communications equipment buildings and communications towers. ยงย 135-49.3— Flex community. ยงย 135-49.5— Principal solar energy system (PSES). ยงย 135-49.6— Noncommercial windmill. ยงย 135-49.7— Commercial wind energy facilities. ยงย 135-52— Yard requirements. ยงย 135-54— General lot regulations. ยงย 135-60— Administration. Ch 135 Art VIII— Sign Regulations ยงย 135-70— Types of signs. 135-70{1}— BILLBOARDS or ADVERTISING SIGNBOARDS (OFF-PREMISES SIGNS) 135-70{2}— BUSINESS IDENTIFICATION SIGNS (ON-PREMISES SIGNS) 135-70{3}— DIGITAL MESSAGE BOARD 135-70{4}— GROUND SIGNS 135-70{5}— IMAGE-CHANGING ADVERTISING SIGN 135-70{6}— POLITICAL SIGNS 135-70{7}— TEMPORARY SIGNS 135-70{8}— TIME-AND-TEMPERATURE SIGN 135-70{9}— TRAFFIC OR ROADWAY SIGNS 135-70{10}— WALL SIGNS ยงย 135-71— General regulations. ยงย 135-72— A-R, R-S and R-U Districts. ยงย 135-73— C, IC, I and LI Districts. ยงย 135-74— FF and FP Districts. ยงย 135-75— FW District. ยงย 135-87— Building/zoning permits. ยงย 135-106— General.
Storage
Ch 102— Private Property, Storage on ยงย 102-3— Permitted storage of nuisances. ยงย 102-10— Storage prohibited. ยงย 102-11— Storage requirements. 104-4{1}— BUILDING ยงย 104-8— Infestation prevention and correction. ยงย 104-9— Miscellaneous provisions. 115-2{13}— STORAGE ยงย 115-3— Prohibited dumping and storage. ยงย 115-9— Storage may not create health and safety hazards. ยงย 115-10— Storage in containers required. ยงย 115-32— Standards and regulations for storage, collection and processing of yard waste. ยงย 115-36— Insurance. Ch 118— Stormwater Management ยงย 118-14— Design standards. ยงย 123-44— Community buildings. ยงย 123-47— Refuse disposal. ยงย 123-50— Fuel systems. ยงย 130-25— Removal of vehicles following snow accumulation. ยงย 130-29— Designation of approved storage garages; bonding; towing and storage. ยงย 130-31— Effect of payment of towing and storage charges. ยงย 130-32— Records of vehicles removed and impounded. Ch 135— Zoning 135-7{38}— CARPORT 135-7{83}— FLOOR AREA, HABITABLE 135-7{85}— GARAGE 135-7{86}— GARAGE, PRIVATE 135-7{87}— GARAGE, PUBLIC 135-7{121}— LOWEST FLOOR 135-7{200}— STORAGE 135-7{201}— STORAGE FACILITY 135-7{221}— WAREHOUSE FACILITY ยงย 135-28— Campgrounds or recreational vehicle parks. ยงย 135-31— Automotive service stations; repair shops. ยงย 135-35— Industrial operations. ยงย 135-36— Warehousing and storage facilities. ยงย 135-37— Contractors' shops and yards. ยงย 135-38— Mineral extraction operations. ยงย 135-39— Junkyards/scrap-processing facilities. ยงย 135-41— Agricultural uses. ยงย 135-41.1— Intensive raising of livestock and poultry. ยงย 135-43— Public utility services. ยงย 135-45— Home occupations. ยงย 135-49.3— Flex community. ยงย 135-53— Height regulations. ยงย 135-55— Buffer yards. ยงย 135-57— Storage of unlicensed vehicles in residential districts. ยงย 135-58— Outdoor, unenclosed storage. ยงย 135-60— Administration. ยงย 135-62— Technical provisions. ยงย 135-76— Off-street parking requirements. ยงย 135-87— Building/zoning permits. ยงย 135-106— General.
Stormwater
Ch 104— Property Maintenance ยงย 104-7— Yards; open lots; parking areas. ยงย 104-9— Miscellaneous provisions. Ch 118— Stormwater Management ยงย 118-1— Short title. ยงย 118-2— Authority. ยงย 118-3— Statement of findings. ยงย 118-4— Purpose. ยงย 118-5— Applicability. ยงย 118-6— Compatibility. ยงย 118-10— Municipal liability. Ch 118 Art II— Stormwater Management Plan Requirements ยงย 118-11— General requirements. ยงย 118-12— Plan content. ยงย 118-13— Supplemental information. ยงย 118-14— Design standards. ยงย 118-15— Sinkhole protection. ยงย 118-16— Erosion and sediment control. ยงย 118-17— Ownership; operation and maintenance. ยงย 118-18— Additional general criteria. ยงย 118-19— Prohibited and authorized discharges. ยงย 118-20— Right of entry. ยงย 118-22— Enforcement. ยงย 118-23— Penalties for failure to comply. 118-26{6}— BEST MANAGEMENT PRACTICE (BMP) 118-26{16}— DESIGN STORM 118-26{17}— DETENTION BASIN 118-26{21}— DRAINAGE EASEMENT 118-26{22}— DRAINAGE PLAN 118-26{39}— IMPOUNDMENT 118-26{40}— INFILTRATION STRUCTURE 118-26{44}— LAND DISTURBANCE 118-26{45}— LEVEL SPREADER 118-26{47}— LOW FLOW CHANNEL 118-26{53}— OPEN CHANNEL 118-26{59}— PIPE 118-26{61}— PROFESSIONAL ENGINEER 118-26{63}— PROFESSIONAL LAND SURVEYOR 118-26{65}— RECORD DRAWING 118-26{67}— REGISTERED LANDSCAPE ARCHITECT 118-26{69}— REGULATED ACTIVITY (ACTIVITIES) 118-26{71}— RETENTION BASIN 118-26{72}— RIPRAP 118-26{80}— SHEET FLOW 118-26{82}— SINKHOLE FLOODPLAIN 118-26{83}— SOIL-COVER-COMPLEX METHOD 118-26{86}— STORM SEWER 118-26{87}— STORMWATER 118-26{88}— STORMWATER MANAGEMENT FACILITY 118-26{91}— SUBAREA 118-26{93}— SWALE ยงย 120-16— Township Engineer to approve certain construction standards and specifications. Ch 123— Subdivision and Land Development 123-6{30}— IMPERVIOUS SURFACE 123-6{31}— IMPROVEMENTS 123-6{66}— STORMWATER ยงย 123-13— Final plan. ยงย 123-28— Driveways. ยงย 123-33— Stormwater management. ยงย 123-34— Sanitary sewers. ยงย 123-48— Stormwater management. ยงย 123-58— Inspections. ยงย 123-61— Dedication and acceptance of public improvements. ยงย 123-62— Maintenance guaranty. Ch 135— Zoning ยงย 135-49.3— Flex community. ยงย 135-49.4— Accessory solar energy system (ASES). ยงย 135-49.5— Principal solar energy system (PSES). ยงย 135-54— General lot regulations. ยงย 135-62— Technical provisions. ยงย 135-82— Powers and duties. ยงย DL-1— Disposition of ordinances.
Stormwater management
Ch 104— Property Maintenance ยงย 104-7— Yards; open lots; parking areas. Ch 118— Stormwater Management ยงย 118-1— Short title. ยงย 118-2— Authority. ยงย 118-3— Statement of findings. ยงย 118-4— Purpose. ยงย 118-5— Applicability. ยงย 118-10— Municipal liability. Ch 118 Art II— Stormwater Management Plan Requirements ยงย 118-11— General requirements. ยงย 118-12— Plan content. ยงย 118-13— Supplemental information. ยงย 118-14— Design standards. ยงย 118-16— Erosion and sediment control. ยงย 118-17— Ownership; operation and maintenance. ยงย 118-18— Additional general criteria. ยงย 118-19— Prohibited and authorized discharges. ยงย 118-22— Enforcement. ยงย 118-23— Penalties for failure to comply. 118-26{16}— DESIGN STORM 118-26{21}— DRAINAGE EASEMENT 118-26{22}— DRAINAGE PLAN 118-26{61}— PROFESSIONAL ENGINEER 118-26{63}— PROFESSIONAL LAND SURVEYOR 118-26{65}— RECORD DRAWING 118-26{67}— REGISTERED LANDSCAPE ARCHITECT 118-26{88}— STORMWATER MANAGEMENT FACILITY 118-26{91}— SUBAREA Ch 123— Subdivision and Land Development 123-6{31}— IMPROVEMENTS ยงย 123-13— Final plan. ยงย 123-33— Stormwater management. ยงย 123-48— Stormwater management. ยงย 123-58— Inspections. ยงย 123-62— Maintenance guaranty. Ch 135— Zoning ยงย 135-49.3— Flex community. ยงย 135-49.4— Accessory solar energy system (ASES). ยงย 135-49.5— Principal solar energy system (PSES). ยงย 135-54— General lot regulations. ยงย 135-82— Powers and duties. ยงย DL-1— Disposition of ordinances.