Index: E
Easements
ยงย 1-4—
Legislation saved from repeal; matters not affected by repeal.
ยงย 27-7—
Powers and duties.
103-2B{34}—
SUBDIVISION
ยงย 109-6—
Application for permit.
ยงย 109-13—
Drainage.
ยงย 155-29.29—
Planning; duties and responsibilities; nuisances.
161-12C{35}—
DRAINAGE EASEMENT
161-12C{149}—
SUBDIVISION
ยงย 161-13—
SWM site plan contents.
ยงย 161-24—
Stream bank erosion requirements (channel protection).
ยงย 161-31—
Responsibilities of developers and landowners.
ยงย 161-32—
Operation and maintenance agreements.
ยงย 162-10—
General requirements.
ยงย 162-13—
General requirements.
ยงย 162-18—
Stormwater management easements.
ยงย 162-19—
Recording of approved stormwater management facilities operations and maintenance plan and related agreements.
ยงย 162-28—
Alteration of stormwater management facilities.
163-13{35}—
DRAINAGE EASEMENT
163-13{150}—
SUBDIVISION
ยงย 163-14—
SWM site plan contents.
ยงย 163-25—
Stream bank erosion requirements (channel protection).
ยงย 163-33—
Responsibilities for operation and maintenance of stormwater facilities and best management practices.
ยงย 163-36—
Stormwater management easements.
ยงย 163-39—
Alteration of BMPs.
164-11{33}—
DRAINAGE EASEMENT
164-11{135}—
SUBDIVISION
ยงย 164-19—
SWM site plan requirements.
ยงย 164-29—
Responsibilities for operations and maintenance of stormwater facilities and BMPs.
ยงย 164-32—
Stormwater management easements.
ยงย 164-35—
Alteration of SWM BMPs.
168-4B{18}—
EASEMENT
168-4B{33}—
LOT AREA
168-4B{77}—
SUBDIVISION
168-4B{78}—
SUBDIVISION, MINOR
ยงย 168-6—
General requirements applicable to all land development plans.
ยงย 168-10—
Preliminary plans.
ยงย 168-11—
Final plans.
ยงย 168-14—
Recording of final plan.
ยงย 168-19—
Lot design standards.
ยงย 168-23—
Sidewalks.
ยงย 168-24—
Storm and surface water drainage.
ยงย 168-28—
Underground utilities and easements.
ยงย 168-49—
Inspections.
174-3{3}—
DOCUMENT
174-3{11}—
VALUE
195-3B{22}—
COMMON DRIVEWAY
195-3B{76}—
RIGHT-OF-WAY or ROW
ยงย 195-9—
General standards.
ยงย 195-13—
R-3 Residential District.
ยงย 195-14.1—
TH Townhouse Residential District.
ยงย 195-21—
TOD Transit-Oriented Overlay District.
ยงย 195-21.1—
TOD-2 Transit-Oriented Overlay District-2
195-24J{36}—
SUBDIVISION
ยงย 195-72—
Tower-based facilities outside rights-of-way that do not meet the definition of a small wireless communications facility.
ยงย 195-73—
Small wireless communications facilities.
ยงย DL-1—
Disposition of legislation.
Electrical disturbances
Elevators
103-2B{1}—
ACCESSORY USE OR STRUCTURE
103-2B{4}—
BASE FLOOD ELEVATION (BFE)
103-2B{12}—
FLOOD INSURANCE STUDY (FIS)
103-2B{15}—
FLOODWAY
103-2B{16}—
HIGHEST ADJACENT GRADE
103-2B{29}—
REGULATORY FLOOD ELEVATION
103-2B{38}—
VIOLATION
Ch 103 Art II—
Construction Standards, Elevation and Floodproofing Requirements
ยงย 103-3—
Residential structures.
ยงย 103-4—
Nonresidential structures.
ยงย 103-7—
Existing structures.
ยงย 103-8—
Accessory structures.
ยงย 103-9—
Rebuilding of destroyed structures.
ยงย 103-12—
Anchoring.
ยงย 103-13—
Floors, walls and ceilings.
ยงย 103-14—
Electrical systems.
ยงย 103-15—
Plumbing.
ยงย 103-16—
Paints and adhesives.
ยงย 103-17—
Storage.
ยงย 103-18—
Manufactured homes.
ยงย 103-22—
Other utilities.
ยงย 103-23—
Streets.
ยงย 103-25—
Relief from strict compliance.
ยงย 103-26—
Information to be provided to applicants.
ยงย 103-27—
Information to be included on plan.
109-3{7}—
GRADE
ยงย 109-6—
Application for permit.
ยงย 109-15—
General requirements.
ยงย 155-11—
Connections to be made at laterals only.
ยงย 155-47—
Nonresidential wastewater discharge permits.
ยงย 155-73—
Wastewater discharge permit application.
161-12C{50}—
FREEBOARD
161-12C{154}—
TOP-OF-BANK
ยงย 161-18—
General requirements.
ยงย 161-22—
Groundwater recharge requirements.
ยงย 161-24—
Stream bank erosion requirements (channel protection).
ยงย 162-10—
General requirements.
ยงย 162-11—
Detention facility design.
163-13{50}—
FREEBOARD
163-13{155}—
TOP-OF-BANK
ยงย 163-19—
General requirements.
ยงย 163-23—
Groundwater recharge requirements.
ยงย 163-25—
Stream bank erosion requirements (channel protection).
ยงย 164-2—
Statement of findings.
164-11{46}—
FLOODWAY
164-11{48}—
FREEBOARD
164-11{141}—
TOP-OF-BANK
168-4B{12}—
CUT
168-4B{23}—
FILL
168-4B{25}—
FLOOD, BASE ELEVATION
168-4B{42}—
MOBILE HOME SEWER RISER PIPE
ยงย 168-6—
General requirements applicable to all land development plans.
ยงย 168-10—
Preliminary plans.
ยงย 168-11—
Final plans.
ยงย 168-21—
Parking areas and driveways.
ยงย 168-24—
Storm and surface water drainage.
ยงย 168-29—
Survey monuments.
ยงย 168-37—
Site design.
ยงย 168-39—
Utilities.
195-3B{12}—
BASE FLOOD ELEVATION
195-3B{80}—
SEWER RISER PIPE
ยงย 195-9—
General standards.
ยงย 195-20—
OC Office Center District.
ยงย 195-24—
FP Floodplain District.
195-24J{4}—
BASE FLOOD ELEVATION (BFE)
195-24J{13}—
FLOOD INSURANCE STUDY (FIS)
195-24J{16}—
FLOODWAY
195-24J{17}—
HIGHEST ADJACENT GRADE
195-24J{31}—
REGULATORY FLOOD ELEVATION
195-24J{40}—
VIOLATION
ยงย 195-26—
IN Institutional District.
ยงย 195-35—
Regulations pertaining to all districts.
Emergencies
ยงย 14-1.1—
Authorized activities of fire company.
35-6{2}—
CIVIL EMERGENCY
35-6{3}—
COOPERATIVE AGREEMENT
35-6{5}—
STRICKEN MUNICIPALITY
ยงย 35-8—
Power and authority of Chief of Police.
ยงย 35-10—
Costs and expenses.
ยงย 35-11—
Purpose.
ยงย 35-13—
Power and authority of Chief of Police.
ยงย 35-16—
Assistance of Sheriff.
ยงย 35-17—
Costs and expenses.
49-3B{2}—
ALARM INSTALLER
49-3B{3}—
ANSWERING SERVICE
49-3B{4}—
AUDIBLE ALARM
49-3B{5}—
AUTOMATIC PROTECTIVE DEVICE
49-3B{9}—
DESIGNATED TRUNK LINE
49-3B{10}—
DIRECT TRUNK LINE
49-3B{17}—
PRIMARY TRUNK LINE
ยงย 63-1—
Uniform Construction Code.
Ch 90—
Emergency Management
90-1{2}—
COORDINATOR
90-1{3}—
DISASTER
90-1{4}—
EMERGENCY MANAGEMENT
90-1{5}—
EMERGENCY MANAGEMENT FORCES
90-1{6}—
EMERGENCY MANAGEMENT VOLUNTEER
90-1{8}—
REGULATIONS
90-1{9}—
VOLUNTEER
ยงย 90-2—
Purposes.
ยงย 90-3—
Emergency Management Agency created; Coordinator.
ยงย 90-4—
Powers and duties of Agency.
ยงย 90-5—
Powers and duties of Coordinator.
ยงย 90-6—
Purchases.
ยงย 90-7—
Unlawful acts.
103-2B{11}—
FLOOD INSURANCE RATE MAP (FIRM)
103-2B{12}—
FLOOD INSURANCE STUDY (FIS)
ยงย 109-4—
Scope; exceptions.
ยงย 124-2—
Sound-producing devices, animals and birds.
ยงย 124-5—
Construction, loading and unloading of vehicles and landscaping and yard work.
ยงย 127-11—
Abatement by Township.
132-1{2}—
MUNICIPAL SERVICE RATE
ยงย 132-6—
Application fee and deposit for Township expenses.
ยงย 132-11—
Revocation of permit.
ยงย 155-29.24—
Control of service.
ยงย 155-29.30—
Definitions; inspections; operation; maintenance; rehabilitation; administration; appeals; violations and penalties.
ยงย 155-39—
Accidental discharges.
ยงย 155-48—
Reports.
ยงย 155-53—
Publication of users in significant noncompliance.
ยงย 155-55—
Notice of violation.
ยงย 155-71—
General sewer use requirements.
ยงย 155-75—
Reporting requirements.
ยงย 155-78—
Publication of users in significant noncompliance.
ยงย 155-80—
Administrative enforcement remedies.
161-12C{38}—
EMERGENCY SPILLWAY
161-12C{44}—
FEMA
ยงย 161-18—
General requirements.
ยงย 162-11—
Detention facility design.
163-13{38}—
EMERGENCY SPILLWAY
163-13{44}—
FEMA
ยงย 163-19—
General requirements.
164-11{36}—
EMERGENCY SPILLWAY
ยงย 165-17—
Issuance of permit.
ยงย 165-21—
Performance of work; schedule of hours and days.
ยงย 168-24—
Storm and surface water drainage.
ยงย 174-16—
Levy of tax.
174-45{1}—
QUALIFYING VOLUNTEER
ยงย 185-3—
Temporary and emergency regulations.
ยงย 185-23—
Emergency snow conditions.
195-3B{11}—
BASE FLOOD
195-3B{12}—
BASE FLOOD ELEVATION
195-3B{40}—
EMERGENCY
195-3B{70}—
ONE-HUNDRED-YEAR FLOOD
ยงย 195-13—
R-3 Residential District.
ยงย 195-22—
C Commercial District.
ยงย 195-24—
FP Floodplain District.
195-24J{12}—
FLOOD INSURANCE RATE MAP (FIRM)
195-24J{13}—
FLOOD INSURANCE STUDY (FIS)
ยงย 195-35—
Regulations pertaining to all districts.
ยงย 195-71—
General requirements for all tower-based wireless communications facilities that do not meet the definition of a small wireless communications facility.
ยงย 195-72—
Tower-based facilities outside rights-of-way that do not meet the definition of a small wireless communications facility.
ยงย 195-73—
Small wireless communications facilities.
ยงย 195-74—
General requirements for all non-tower wireless communications facilities that do not meet the definition of a small wireless communications facility.
ยงย DL-1—
Disposition of legislation.
Emergency management
ยงย 63-1—
Uniform Construction Code.
Ch 90—
Emergency Management
90-1{2}—
COORDINATOR
90-1{4}—
EMERGENCY MANAGEMENT
90-1{5}—
EMERGENCY MANAGEMENT FORCES
90-1{6}—
EMERGENCY MANAGEMENT VOLUNTEER
90-1{8}—
REGULATIONS
90-1{9}—
VOLUNTEER
ยงย 90-2—
Purposes.
ยงย 90-3—
Emergency Management Agency created; Coordinator.
ยงย 90-4—
Powers and duties of Agency.
ยงย 90-5—
Powers and duties of Coordinator.
ยงย 90-6—
Purchases.
ยงย 90-7—
Unlawful acts.
103-2B{11}—
FLOOD INSURANCE RATE MAP (FIRM)
103-2B{12}—
FLOOD INSURANCE STUDY (FIS)
161-12C{44}—
FEMA
163-13{44}—
FEMA
195-3B{11}—
BASE FLOOD
195-3B{12}—
BASE FLOOD ELEVATION
195-3B{70}—
ONE-HUNDRED-YEAR FLOOD
ยงย 195-24—
FP Floodplain District.
195-24J{12}—
FLOOD INSURANCE RATE MAP (FIRM)
195-24J{13}—
FLOOD INSURANCE STUDY (FIS)
ยงย DL-1—
Disposition of legislation.
Emergency Management Coordinator
Emergency vehicles
Encroachments
ยงย 103-29—
Permit issuance requirements.
ยงย 109-6—
Application for permit.
ยงย 109-15—
General requirements.
127-21{2}—
BAMBOO OWNER
ยงย 127-22—
Prohibitions; exceptions; existing plants; removal; replanting.
161-12C{39}—
ENCROACHMENT
ยงย 162-12—
Stormwater conveyance system.
ยงย 163-5—
Applicability.
163-13{39}—
ENCROACHMENT
ยงย 164-5—
Applicability; regulated activities.
164-11{37}—
ENCROACHMENT
ยงย 168-20—
Street design standards.
ยงย 168-25—
Grading and erosion and sediment control.
ยงย 195-10—
BP Business Professional District.
ยงย 195-10.1—
B Business District.
ยงย 195-24—
FP Floodplain District.
ยงย 195-25—
LI Limited Industrial District.
Environmental control
Erosion and sediment control
109-3{4}—
EROSION AND SEDIMENT POLLUTION CONTROL (E&S PLAN)
ยงย 109-4—
Scope; exceptions.
ยงย 109-6—
Application for permit.
ยงย 109-15—
General requirements.
ยงย 161-2—
Statement of findings.
161-12C{41}—
EROSION AND SEDIMENT CONTROL PLAN
ยงย 161-13—
SWM site plan contents.
ยงย 161-18—
General requirements.
ยงย 161-20—
Erosion and sediment control during regulated earth disturbance activities.
ยงย 161-42—
References cited.
162-7C{11}—
EROSION AND SEDIMENT CONTROL PLAN
ยงย 162-8—
Erosion and sediment control during regulated earth disturbance activities.
ยงย 162-11—
Detention facility design.
ยงย 162-23—
General.
ยงย 162-24—
Expenses covered by fees.
ยงย 163-2—
Statement of findings.
ยงย 163-6—
Exemptions.
163-13{41}—
EROSION AND SEDIMENT CONTROL PLAN
ยงย 163-14—
SWM site plan contents.
ยงย 163-19—
General requirements.
ยงย 163-21—
Erosion and sediment control during regulated earth disturbance activities.
ยงย 164-2—
Statement of findings.
ยงย 164-6—
Exemptions.
164-11{39}—
EROSION AND SEDIMENT CONTROL PLAN
ยงย 164-12—
General requirements.
ยงย 164-18—
General requirements.
ยงย 164-19—
SWM site plan requirements.
ยงย 168-11—
Final plans.
ยงย 168-24—
Storm and surface water drainage.
ยงย 168-25—
Grading and erosion and sediment control.
ยงย 168-37—
Site design.
ยงย 195-24—
FP Floodplain District.
Escrow deposits
Excavations
103-2B{7}—
DEVELOPMENT
103-2B{32}—
START OF CONSTRUCTION
Ch 109—
Grading, Excavations and Fills
ยงย 109-2—
Purpose.
109-3{3}—
EARTH DISTURBANCE
109-3{5}—
EXCAVATION
109-3{7}—
GRADE
109-3{8}—
GRADING
ยงย 109-4—
Scope; exceptions.
ยงย 109-11—
Inspections.
ยงย 109-12—
Standards for compaction of fills.
ยงย 109-14—
Maintenance.
ยงย 109-15—
General requirements.
ยงย 109-16—
Issuance of grading certificate; revocation.
ยงย 109-17—
Violations and penalties.
Ch 155—
Sewers
ยงย 155-15—
Safety measures for excavations.
155-31A{31}—
NEW SOURCE
155-70D(1){27}—
NEW SOURCE
ยงย 161-6—
Exemptions.
161-12C{24}—
DEVELOPMENT
161-12C{37}—
EARTH DISTURBANCE ACTIVITY
161-12C{51}—
GRADE
161-12C{110}—
REGULATED EARTH DISTURBANCE ACTIVITY
161-12C{128}—
SEEPAGE PIT/SEEPAGE TRENCH
Ch 162—
Stormwater Management
162-7C{9}—
EARTH DISTURBANCE ACTIVITY
Ch 163—
Stormwater Management: Wissahickon Creek Watershed
ยงย 163-6—
Exemptions.
163-13{24}—
DEVELOPMENT
163-13{37}—
EARTH DISTURBANCE ACTIVITY
163-13{51}—
GRADE
163-13{111}—
REGULATED EARTH DISTURBANCE ACTIVITY
163-13{129}—
SEEPAGE PIT/SEEPAGE TRENCH
Ch 164—
Stormwater Management: Neshaminy Creek Watershed
164-11{24}—
DEVELOPMENT
164-11{35}—
EARTH DISTURBANCE ACTIVITY
164-11{50}—
GRADE
164-11{114}—
SEEPAGE PIT/SEEPAGE TRENCH
Ch 165—
Streets and Sidewalks
ยงย 165-2—
Curb construction standards.
Ch 165 Art III—
Street Excavations
ยงย 165-11—
Title.
165-12B{2}—
EXCAVATION
ยงย 165-13—
Permits required.
ยงย 165-14—
Application.
ยงย 165-17—
Issuance of permit.
ยงย 165-19—
Protection of existing facilities.
ยงย 165-20—
Traffic management.
ยงย 165-21—
Performance of work; schedule of hours and days.
ยงย 165-24—
Notice of improvements.
ยงย 165-28—
Protection of property.
ยงย 165-29—
Driveway access; storage of excavated materials.
ยงย 165-30—
Clearance for vital public properties.
ยงย 165-31—
Construction standards.
168-4B{12}—
CUT
168-4B{22}—
EXCAVATION
ยงย 168-25—
Grading and erosion and sediment control.
ยงย 168-32—
Natural or historic feature preservation.
195-3B{31}—
DEVELOPMENT
195-3B{91}—
SUBSTANTIALLY CHANGE or SUBSTANTIAL CHANGE
ยงย 195-24—
FP Floodplain District.
195-24J{8}—
DEVELOPMENT
195-24J{34}—
START OF CONSTRUCTION
ยงย DL-1—
Disposition of legislation.
Explosion hazards
Explosives
35-6{2}—
CIVIL EMERGENCY
100-2{3}—
FIREWORKS
ยงย 100-3—
Permit requirements.
ยงย 103-17—
Storage.
ยงย 155-33—
General discharge prohibitions.
ยงย 155-71—
General sewer use requirements.
ยงย 165-15—
Liability and insurance.
195-3B{26}—
CONSUMER FIREWORKS
195-3B{32}—
DISPLAY FIREWORKS
ยงย 195-10.1—
B Business District.
ยงย 195-20—
OC Office Center District.
ยงย 195-25—
LI Limited Industrial District.
ยงย 195-42—
Reconstruction of damaged or destroyed nonconforming buildings.