Index: E
Easements
§ 1-13—
Ordinances saved from repeal.
§ 236-9—
Abrogation and greater restrictions.
§ 275-4—
Interpretation.
275-6{47}—
CONTIGUOUS LAND
275-6{187}—
RIGHT-OF-WAY
275-6{197}—
SIGHT TRIANGLE
275-6{230}—
UTILITY DISTRIBUTION LINES
§ 275-56—
Minor subdivisions.
§ 275-58—
Final major subdivisions.
§ 275-71—
Parking and loading.
§ 275-73—
Pinelands development credits (PDCs).
§ 275-85—
Energy conservation standards.
§ 275-92—
Roadway construction standards.
§ 275-105—
New Jersey Pinelands Commission review.
§ 407-4—
Stormwater management performance standards for major development.
§ 407-6—
Inspection, maintenance and repair of stormwater management measures.
§ A500-35—
Renewal of municipal consent.
§ DL-1—
Disposition of legislation.
Elevators
§ 236-2—
Findings of fact.
236-5{1}—
AH ZONE
236-5{7}—
BASE FLOOD ELEVATION (BFE)
236-5{9}—
BREAKAWAY WALL
236-5{14}—
ELEVATED BUILDING
236-5{18}—
FLOOD INSURANCE STUDY (FIS)
236-5{22}—
FLOODWAY
236-5{24}—
HIGHEST ADJACENT GRADE
236-5{40}—
VIOLATION
§ 236-12—
Establishment of development permit.
§ 236-14—
Duties and responsibilities of administrator.
§ 236-15—
Variance procedure.
§ 236-16—
General standards.
§ 236-17—
Specific standards.
§ 236-18—
Floodways.
§ 236-19—
Coastal high-hazard area and Coastal A Zone.
275-6{18}—
BEDDING
275-6{25}—
BUILDING OR STRUCTURE HEIGHT
275-6{94}—
GRADE, FINISHED
§ 275-56—
Minor subdivisions.
§ 275-57—
Preliminary major subdivisions.
§ 275-61—
Preliminary major site plans.
§ 275-88—
Floodplain standards.
§ 275-105—
New Jersey Pinelands Commission review.
§ 407-2—
Requirements for site development stormwater plan.
§ 407-5—
Design, construction, and safety standards for structural stormwater management measures.
407-7{15}—
FINISHED GRADE
§ 407-10—
Appendices.
407-10C(2){47}—
STATIC WATER LEVEL
Emergencies
§ 8-10—
Approval in advance of check distribution; exceptions.
§ 14-6—
Emergency exceptions.
Ch 35—
Fire Companies, Emergency Squads
§ 35-1—
Designation of Fire Departments and ambulance squad.
§ 35-2—
Municipal control limited by budget allocation.
§ 62-6—
Responsibilities.
§ 98-2—
Purpose.
§ 98-4—
Powers and duties.
107-3{1}—
ALARM SYSTEM
107-3{3}—
DIAL ALARM
107-3{4}—
FALSE ALARM
§ 155-19—
Emergency access and notification requirements.
188-1{2}—
EMERGENCY
§ 188-3—
Defenses to prosecution.
§ 236-7—
Basis for establishing areas of special flood hazard.
§ 236-15—
Variance procedure.
§ 260-4—
Notice of violation; hearing.
§ 269-7—
Regulations.
§ 275-20—
Uses.
§ 275-48—
Uses.
Ch 303—
Naming of Streets; Numbering of Buildings
§ 310-3—
Unlawful acts enumerated.
§ 322-3—
Application requirements.
§ 407-2—
Requirements for site development stormwater plan.
§ 407-5—
Design, construction, and safety standards for structural stormwater management measures.
§ 437-9—
Exceptions.
§ A500-48—
Commitments by the company.
§ A500-49—
Emergency uses.
§ DL-1—
Disposition of legislation.
Emergency management
Emergency vehicles
Encroachments
§ 155-24—
Site dimensions and placement; inspections; prototype plans.
§ 236-14—
Duties and responsibilities of administrator.
§ 236-18—
Floodways.
§ 269-1—
Statement of policy and purpose.
§ 275-68—
Historical, archaeological and cultural preservation.
407-7{18}—
GROUNDWATER MOUNDING ANALYSIS
§ 407-10—
Appendices.
Environmental Commission
Environmental impact statement
Erosion and sediment control
275-6{63}—
DRAINAGE
§ 275-57—
Preliminary major subdivisions.
§ 275-65—
Agricultural operations.
§ 407-1—
Scope and purpose.
§ 407-2—
Requirements for site development stormwater plan.
§ 407-4—
Stormwater management performance standards for major development.
§ 407-5—
Design, construction, and safety standards for structural stormwater management measures.
§ 407-11—
Additional sources for technical guidance.
Escrow accounts
Escrow deposits
Excavations
145-12{5}—
NUISANCE
§ 145-15—
Duties and responsibilities of owner and operator.
236-5{12}—
DEVELOPMENT
236-5{35}—
START OF CONSTRUCTION
275-6{54}—
DETENTION BASIN
275-6{56}—
DEVELOPMENT
275-6{186}—
RETENTION BASIN
§ 275-30—
Uses.
§ 310-3—
Unlawful acts enumerated.
§ 407-5—
Design, construction, and safety standards for structural stormwater management measures.
407-7{8}—
DEVELOPMENT
407-7{14}—
EXTENDED DETENTION BASIN
407-7{63}—
WET POND
§ 407-10—
Appendices.
407-10C(2){44}—
SOIL TEST PIT
§ A500-3—
Construction requirements; filing of plans; permit for street opening.
§ A500-5—
Exemption from fees.
Explosion hazards