[HISTORY: Adopted by the Planning Board of the Town of Dover 11-28-1962; approved by the Town Board 12-6-1962. Amendments noted where applicable.]
GENERAL REFERENCES
Architectural design review — See Ch. 37.
Building construction — See Ch. 47.
Environmental quality review — See Ch. 61.
Erosion and sediment control — See Ch. 65.
Fees — See Ch. 73.
Flood damage prevention — See Ch. 81.
Greenway connections — See Ch. 88.
Highway standards — See Ch. 93.
Streets and sidewalks — See Ch. 121.
Zoning — See Ch. 145.