All utilities shall be placed underground at
the time of initial construction of the subdivision.
A.
Where there are curbed streets, or other conditions
which require closed drainage systems, the structures and piping shall
be of the catch-basin and manhole configuration. Collection structures,
such as catch basins, drop inlets, gutter inlets, etc., shall have
sumps prior to connection to the drainage system at a manhole. The
street drainage system shall be designed for a minimum ten-year design
frequency with the system not exceeding full pipe flow conditions
(no surcharging or pressure flow conditions). Large diameter culverts
(greater than 48 inches) shall be designed for a minimum twenty-five-year
frequency. The design of box culverts or bridges with spans greater
than eight feet shall follow MDPW Bridge Division Requirements.
B.
In all cases the drainage system shall remain functional,
streets shall remain passable and drainage may not enter buildings
for frequencies up to the one-hundred-year storm event. Drainage pipe
and structures shall be designed to adequately withstand abrasion
and forces throughout the design life, especially where velocities
exceed 15 feet per second (fps).
C.
In general, the calculations of the stormwater peak
rates of runoff volume shall be used within the constraints of SCS
Method TR 55, unless otherwise approved by the Department. Should
the designer choose to use another method, the Department may require
the calculations by the SCS method for comparison. Where the use of
the SCS method is not appropriate, the Department will reserve the
right to request that two appropriate methods be used for comparison
and verification.
D.
Design.
(1)
Catch basins shall be installed on both sides of the
roadway at intervals not to exceed 300 feet and at such other places
as deemed necessary by the Department to assure adequate drainage
of all low points and to provide proper runoff of stormwater. In no
instances shall catch basins be located along a driveway cut. Each
catch basin shall have a sump a minimum of two feet and six inches
below the invert of the lowest drain.
(2)
Manholes shall be constructed to the required depth
at each junction point with a maximum spacing of 300 feet. All lines
shall be straight between manholes both as to line and grade.
(3)
All drains, including catch basin laterals, shall
be at least 12 inches in diameter.
(4)
The minimum cover shall be two feet six inches for
the drainage system, one foot for driveway culverts.
(5)
All lots upgradient of the road drainage system shall
be provided with an individual connection to the storm sewer or drainage
facilities for footing drain and/or sump pump connections unless an
alternate method is available. Pipe size shall be a minimum of four
inches.
(6)
The movement, or piping, of groundwater through pipe
bedding material shall be taken into account during design, especially
in areas where roads are constructed in heavier soils, on steep road
grades or where groundwater may be present. The use of clay trench
dams downgradient of drainage structures with weep holes, the use
of subdrains or other appropriate methods shall be employed.
(7)
Water velocities shall be between two and 15 feet
per second in the pipes, not over five feet per second in grass swales
and not over 12 feet per second in lined swales, where such are allowed.
E.
Materials.
(1)
Pipe.
(a)
Polyvinyl chloride (PVC) pipe shall be PVC gravity
sewer pipe with a smooth interior and meeting the material requirements
of ASTM D3034 for SDR 35 or ASTM F679, or for ribbed exterior pipe,
ASTM F794. All pipe shall have a minimum pipe stiffness at 5% deflection
of 46 pounds per square inch, as tested by ASTM D2412. Joints shall
be gasketted bell and spigot meeting ASTM D3212.
(b)
High-density polyethylene (HDPE) pipe shall
consist of an exterior corrugated wall and smooth wall interior polyethylene
tubing, with gasketted couplings and fittings. Materials, dimensions,
physical properties and fabrication shall be in conformance with AASHTO
M294.
(c)
Reinforced concrete pipe (RCP) shall conform
to ASTM C76, Class IV, with bell-and-spigot-type joints conforming
to ASTM C443.
(d)
Storm sewers and culverts up to 36 inches in
diameter shall be RCP, PVC or HDPE meeting MDPW Standard Specifications
requirements.
(e)
All storm sewers greater than 36 inches in diameter
shall be RCP unless otherwise approved by the Department. All culverts
greater than 36 inches shall be RCP or precast concrete box culverts,
meeting the requirements of AASTHO, Standard Specifications for Highways
and Bridges, 1989. The use of corrugated metal pipe (CMP) or pipe
arch culverts may be appropriate in some instances, and the Department
will review and approve on a case-by-case basis. Corrugated metal
pipes and pipe arches shall conform to MDPW Standard Specification
M5.03.0.
(f)
Perforated six-inch PVC or corrugated HDPE pipe
shall be used for subdrains. All culverts shall be designated with
adequate inlet and outlet protection taking into account the design
flow, velocity and soil conditions. Concrete headwalls, flared-end
sections, riprap or other appropriate methods shall be used to protect
the culvert, road, embankment and drainage course.
(2)
Catch basins and manholes.
(a)
All materials shall conform to MDPW Standard
Specifications, as follows:
Description
|
Material Specification
| |
---|---|---|
Clay brick
|
M4.05.2
| |
Cement concrete brick
|
M4.05.0
| |
Cement concrete block
|
M4.05.1
| |
Cement mortar
|
M4.02.15
| |
Gravel borrow
|
M1.03.0, Type A
| |
Precast units
|
M4.02.14
|
(b)
The standard frame and grate to be supplied
for catch basins shall be LeBaron, Catalog Number LF248-2, or approved
equal.
(c)
The frame and cover to be supplied for manholes
shall be LeBaron, Catalog Number LF268-3, with three-inch lettering
to read "Drain," or approved equal.
(3)
Gravel and stone. Screened gravel shall conform to MDPW Standard Specifications, M1.03.0, Type C. The Type C gravel borrow shall conform to the gradation requirements, as previously described in § 113-8B(1) but shall have a maximum stone size in the largest dimension of two inches and shall conform to MDPW Standard Specifications, M1.03.0, Type A. Crushed stone shall conform to MDPW Standard Specifications, M2.01.4., as previously described in § 113-10B(2).
F.
Construction.
(1)
PVC and HDPE pipe shall be jointed in accordance with
the recommendations of the latest ASTM standards and detailed instructions
of the manufacturer. No single piece of pipe shall be laid unless
it is generally straight.
(2)
All pipe shall be sound and clean before laying. As
soon as the excavation is complete to normal grade of the bottom of
the trench, screened gravel or crushed stone bedding shall be placed,
compacted and graded to provide firm, uniform and continuous support
for the pipe. Bell holes shall be excavated so that only the barrel
of the pipe bears upon the bedding. The pipe shall be laid accurately
to the lines and grades indicated on the design drawings. Blocking
under the pipe will not be permitted.
(3)
Screened gravel, or crushed stone, shall be placed
evenly on each side of the pipe to mid-diameter and hand tools shall
be used to force the bedding under the haunches of the pipe and into
the bell holes to give firm continuous support for the pipe. Screened
gravel, or crushed stone, shall be placed to a minimum of 12 inches
above the top of the pipe. The initial three feet of backfill above
the screened gravel, or crushed stone, backfill shall be placed in
one-foot layers and carefully compacted. Generally, the compaction
shall be done evenly on each side of the pipe, and compaction equipment
shall not be operated directly over the pipe until sufficient backfill
has been placed to ensure that compaction equipment will not have
a damaging effect on the pipe.
(4)
Each length of PVC pipe shall be shoved home against
the pipe previously laid and held securely until enough backfill has
been placed to hold the pipe in place. Joints shall not be pulled
or cramped.
(5)
Before any joint is made, the pipe shall be checked
to assure that a close joint with the next adjoining pipe has been
maintained and that the inverts are matched and conform to the required
grade. The pipe shall not be driven down to grade by striking it.
(6)
Reinforced concrete pipe (RCP) shall be installed
in accordance with MDPW Standard Specifications, Section 230.
(7)
Excavation and backfilling shall conform to MDPW Standard
Specifications, Sections 120.60, 150.60 and 150.64.
(8)
Basins, manholes and inlets shall be built to the
lines, grades, dimensions and design shown on the plans and as directed,
with the necessary frames, gratings, covers, etc., and in accordance
with these specifications.
(9)
Brick and concrete blocks shall be soaked in water
before laying. All joints in the brick structures shall be thoroughly
flushed full of mortar, and no joint on the inside face shall be greater
than 1/4 inch. After the bricks are laid, the joints shall be pointed
on the inside. As brick walls are laid up, the outside of the structure
shall be plastered with one-half-inch thick mortar coat. As circular
concrete block walls are laid up, the horizontal joints and keyways
shall be flushed full with mortar. As rectangular blocks are laid
up, all horizontal and vertical joints shall be flushed full with
mortar.
(10)
Plastering of the outside of block structures
will not be required. The joints in precast units shall be wetted
and completely mortared immediately prior to setting a section. No
structure shall be backfilled until all mortar has completely set.
When the floors of structures are made of concrete sectional plates
the opening in the floor shall be filled with brick chips and mortar
or cement concrete.
(11)
Frame castings for basins and manholes shall
be set in full mortar beds true to the lines and grades, as directed.
(12)
Where directed, the castings shall be temporarily
set at such grades as to provide drainage during the construction.
(13)
The castings of structures located within the
pavement area shall not be completely set to the established grade
until the bottom course of pavement has been laid.
(14)
The final setting of all other castings shall
be performed at the proper stage of construction, as directed.
(15)
Cement concrete collars shall be placed around
the castings after the final setting, as shown on the plans, and as
directed.
(16)
Unless otherwise directed, two weep holes shall
be built into the walls of all new basins and precast units, as shown
on the plans. Each weep hole shall consist of a section of four-inch
pipe, or equivalent opening, to carry water through the wall of the
structure.
(17)
The ends of the pipe, if used, shall be saw
cut and left flush with the walls of the structure.
(18)
The outside end of the pipe or opening shall
be covered with a one-fourth-inch mesh galvanized wire screen 23 gage
satisfactorily fastened against the wall. The drain to the weep hole
shall be excavated and backfilled with two cubic feet of crushed stone
conforming to MDPW Standard Specifications, M2.01.4. The stone shall
be placed against, and over, the end of the pipe or opening to prevent
the entrance of the finer filling material. Only one type of weep
hole shall be used throughout the project.
(19)
The structure shall be backfilled with gravel
borrow and compact.
A.
Design.
(1)
Minimum size sewer shall be eight inches. Minimum
size house service shall be four inches. In general, sewers shall
be designed deep enough to drain basement fixtures of all houses to
be connected to the sewer, but in no case shall the depth of cover
be less than five feet, unless written approval from the Department
is obtained.
(2)
The sanitary sewer shall be located in the center
of the street, or as close thereto as possible when the street is
curved.
(3)
All sanitary sewers shall be designed and constructed
in straight lines between manholes. The sewer lines shall be designed
for a minimum flow velocity of two feet per second (fps).
(4)
All manholes shall be precast concrete and be spaced
at a maximum of 300 feet on straight runs, and at every intersection,
change in grade and/or alignment, change in size and at the end of
each line.
(5)
Where a gravity sewer is not feasible, a pressure
sewer shall be installed.
(6)
The pressure system may be designed with individual
grinder pump units or a duplex pump station. Individual grinder pump
units shall be maintained by the individual property owner. The duplex
pump station shall be designed so that the wet well is separate from
the pumps and controls. The design shall meet the requirements of
the Williamstown DPW.
B.
Materials.
(1)
Gravity sewer pipe and fittings.
(a)
Pipe and fittings shall be PVC gravity sewer
pipe with a smooth interior meeting the material requirements of ASTM
D1784. The pipe shall also meet the requirements of ASTM D3034 for
SDR 35 or ASTM F679, or for ribbed exterior pipe ASTM F794. All pipe
shall have a minimum pipe stiffness of five-percent deflection of
46 pounds per square inch, as tested by ASTM D2412. Saddle wyes will
not be allowed.
(b)
PVC pipe and fittings shall have bell-and-spigot
push-on joints, meeting ASTM D3212. The bell shall consist of an integral
wall section with a solid cross-section elastomeric gasket securely
locked in place to prevent displacement during assembly. Elastomeric
gaskets shall conform to ASTM F477.
(c)
All fittings and accessories shall have bell-and/or-spigot
configurations compatible with the pipe.
(2)
Precast manholes. Precast concrete barrel sections
and transition top sections shall conform to Specifications for Precast
Reinforced Concrete Manhole Sections, ASTM C478, and meet the following
requirements:
(a)
The wall thickness shall not be less than five
inches for forty-eight-inch diameter reinforced barrel sections.
(b)
Top sections shall be eccentric, except that
flat concentric top sections shall be used where shallow cover requires
a top section less than four feet, as shown on drawings.
(c)
Barrel sections shall have tongue-and-groove
joints with approved round rubber O-ring gaskets, or a preformed flexible
joint sealant.
(d)
All sections shall be cured by an approved method
and shall not be shipped, nor subjected to loading, until the concrete
compressive strength has attained 3,000 pounds per square inch, and
not before five days after fabrication, whichever is longer.
(e)
Precast concrete barrel sections with precast
top slabs and precast concrete transition sections shall be designed
for a minimum of H-20 loading, plus the weight of the soil above.
(f)
The date of manufacture and the name and trademark
of the manufacturer shall be clearly marked on the inside of each
precast section.
(g)
Precast concrete bases shall be constructed
and installed, as shown on the drawings. The thickness of the bottom
slab of the precast bases shall not be less than the manhole barrel
sections or top slab, whichever is greater.
(h)
Type II cement shall be used except as otherwise
approved.
(i)
All exterior surfaces of sanitary manholes shall
be given two coats of waterproof coating.
(3)
Brick masonry.
(a)
The bricks shall be good, sound, hard and uniformly
burned, regular and uniform in shape and size, of compact texture
and satisfactory to the Department. Underburned or salmon brick will
not be acceptable, and only whole brick shall be used unless otherwise
permitted. In case bricks are rejected by the Department, they shall
be immediately removed from the site of the work and satisfactory
bricks substituted therefor.
(b)
Bricks for the channels and shelves shall comply
with the latest specifications for ASTM C32 for Sewer Brick, Grade
SS (from clay to shale), except that the mean of five tests for absorption
shall not exceed 8%, and no individual brick shall exceed 11%.
(c)
Bricks for building up and leveling manhole
frames shall conform to ASTM C62.
(d)
Mortar used in the brickwork shall be composed
of one part Type II portland cement conforming to ASTM C150 to two
parts sand to which a small amount of hydrated lime, not to exceed
10 pounds to each bag of cement, shall be added.
(e)
The sand used shall be washed, cleaned, screened,
sharp and well graded as to different sizes and with no grain larger
than that which will pass a No. 4 sieve. It shall be free of organic
matter, loam, organic or other materials of such nature or of such
quantity as to render it unsatisfactory.
(f)
The hydrated lime shall also conform to ASTM
C207, Type S.
(4)
Manhole frame and cover.
(a)
Manhole frames and covers shall be of good quality,
strong, tough, even-grained cast iron which is smooth, free from scale,
lumps, blisters, sand holes and defects of any kind which render them
unfit for the service for which they are intended. Manhole covers
and frame seats shall be machined to a true surface. Castings shall
be thoroughly cleaned and subject to hammer inspection. Before shipment
from the foundry, castings shall be given one coat of coal tar pitch
varnish which shall present a casting that is smooth and tough, but
not brittle. Cast iron shall conform to ASTM A48, Class 30.
(b)
Manhole covers shall have a diamond pattern,
pick holes and the word "sewer" centered on the cover in three-inch
letters.
(c)
Standard manhole frames and covers for all applications
shall provide a twenty-four-inch clear opening. Manhole frames and
covers shall be LeBaron Foundry No. LB-268-1, or approved equal.
(5)
Precast manhole section joints.
(a)
Tongue-and-groove joints of precast manhole
sections shall be sealed with either a round rubber O-ring gasket
or a preformed flexible joint sealant.
(b)
If round rubber O-ring gaskets are used, they
shall conform to ASTM C443. They shall be designed and manufactured
so that the completed joint will withstand an internal water pressure
in excess of 15 pounds per square inch without showing any leakage
by the gasket or displacement of it.
(c)
The contractor shall provide facilities for
testing the effectiveness of the joints against leakage. Such tests
shall be made by an internal pressure against the joint of at least
15 pounds per square inch.
(6)
Manhole rungs.
(a)
Manhole rungs shall be steel reinforced copolymer
polypropylene plastic. Rungs shall be 14 inches wide.
(b)
Copolymer polypropylene shall be Type II, Grade
16906, meeting ASTM Specification 2146. Steel reinforcing shall be
three-eights-inch in diameter, Grade 60, conforming to ASTM Specification
A615 and shall be continuous throughout the rung. The portion of the
legs to be embedded in the precast section shall have fins and be
tapered to ensure a secure bond.
(7)
Pipe connections to manholes. Manhole pipe connections
may be accomplished in the following ways:
(a)
The "Lock Joint Flexible Manhole Sleeve" shall
be cast in the precast manhole base. The stainless steel strap and
exposed sleeve shall be protected from corrosion with a bituminous
coat.
(b)
"A-Lok" shall be a rubber-like gasket cast in
the precast manhole base. The rubber gasket shall be cast into a formed
opening in the manhole.
(c)
"KOR-N-SEAL" joint shall be installed as recommended
by the manufacturer. The stainless steel clamp shall be protected
from corrosion with a bituminous coat.
(d)
"Res-Seal" shall be a rubber-like O-ring set
in a formed opening in the manhole. Once the pipe is in place, the
O-ring and pipe shall be secured in place by means of a cast-iron
follower or compression flange. All exposed metal shall be protected
from corrosion with a bituminous coat.
(8)
Pump station. Duplex pump stations shall be constructed
of reinforced concrete, precast or cast-in-place, and shall be supplied
with nonclog pump controls, wiring, shut-off valves, access hatches
and other required appurtenances.
(9)
Nonclog submersible pump.
(a)
Type: single-speed, submersible centrifugal
nonclog sewage pump; solids handling capacity, three inch sphere minimum.
(b)
Casing: cast iron with corrosion protective
coating with oil-filled motor chamber; all exposed hardware shall
be corrosion resistant stainless steel.
(c)
Pump: centrifugal type, impeller shall be cast
iron or enameled cast iron, fully enclosed, keyed to stainless steel
shaft.
(d)
Seals: two mechanical seals with carbon and
ceramic faces, oil lubricated, with oil-filled seal chamber between
seals.
(e)
Motor: close-coupled, constant speed motor,
preferably three phases.
(f)
Overload protection: automatic reset type thermal
overload thermostat incorporated into the pump motor.
(g)
Motor controls: duplex control panel with weatherproof
NEMA 4 outer enclosure with dead front panel; all components mounted
within inner NEMA 1 enclosure; main disconnect switch and starter
with overload and short circuit protection for each pump; control
circuit main switch with short circuit and adjustable thermal trip
protection; hand-off automatic switch for each pump; transformer 230
V.-110 V.-24 V.; relay for automatic alternation of pumps; control
fuses; green running light for each pump; all necessary terminal strips;
control relays, panel powered for high wet well level alarm switch;
one-hundred-ten-volt red high wet well level alarm light in weatherproof
enclosure; 110 V. yellow lead pump off alarm light in weatherproof
enclosure; one elapsed-time meter for each pump; hermostatically controlled
space heater; convenience outlet, duplex receptacle for auxiliary
power with manual transfer switch mounted within the enclosure; control
panel shall be UL approved.
(h)
Level controls: mercury switch level sensors
with corrosion and shock-resistant casing with firmly bonded electrical
cable; cable shall be permanently bonded to metal enclosed mercury
switch with entire assembly encapsulated for water and impact-resistant
unit; switch shall be weighted and designed to actuate but not float;
level controls system shall include support brackets to allow the
suspension of the switches at the proper levels in the wet well; duplex
stations shall have level controls for high-level alarm, low-level
alarm, lead pump on, lag pump on and all pumps off;
(i)
Cables: electric and control cables shall be
of the size and type applicable to the pump motor and control system
requirements. Junction boxes shall be located within the pump station.
(10)
Screened gravel: Screened gravel shall conform to MDPW Standard Specifications M1.03.0, Type C, as previously described in § 113-8B(1).
(11)
Crushed stone. Crushed stone shall conform to MDPW Standard Specifications M2.01.4, as previously described in § 113-10B(2).
C.
Construction.
(1)
Pipe installation.
(a)
Care shall be taken in shipping, handling and
laying to avoid damaging the pipe and fittings. Extra care will be
necessary during cold weather construction.
(b)
Any pipe or fitting showing a crack or which
has received a blow that may have caused an incipient fracture, even
though no such fracture can be seen, shall be marked as rejected and
removed at once from the work area.
(c)
All pipe ends shall be square after cutting.
(d)
While stored, pipe shall be adequately supported
from below at not more than three-foot intervals to prevent deformation.
Pipe shall not be stacked higher than six feet. Pipe and fittings
shall be stored in a manner which will keep them at ambient outdoor
temperatures.
(e)
Temporary shading, as required, to meet this
requirement shall be provided. Simple covering of the pipe and fittings
which allows temperature buildup when exposed to direct sunlight will
not be permitted.
(f)
PVC sewer pipe and fittings shall be jointed
in accordance with the recommendations of the latest ASTM standards
and detailed instructions of the manufacturer.
(g)
All manhole connections shall be equipped with
an integral O-ring or other sealant such that a positive watertight
seal is established.
(h)
No single piece of pipe shall be laid unless
it is generally straight.
(i)
The centerline of the pipe shall not deviate
from a straight line drawn between the centers of the openings at
the ends of the pipe by more than 1/16 of an inch per foot of length.
If a piece of pipe fails to meet this requirement check for straightness,
it shall be rejected and removed from the site. Laying instructions
of the manufacturer shall be explicitly followed.
(j)
Any pipe or fitting discovered to be defective
after laying shall be removed and replaced with a sound piece.
(k)
The Engineer may examine each bell-and-spigot
end to determine whether any preformed joint has been damaged prior
to installation.
(l)
Any pipe having defective joint surfaces shall
be rejected, marked as such and immediately removed from the job site.
(m)
All pipe shall be sound and clean before laying.
When laying is not in progress, including lunch time, the open ends
of the pipe shall be closed by watertight plugs or other approved
means. Good alignment shall be preserved in laying.
(n)
Pipe and fittings shall be installed in accordance
with the instructions of the manufacturer, ASTM D2321, and as specified
herein.
(o)
As soon as the excavation is complete to normal
grade of the bottom of the trench, screened gravel or crushed stone
bedding shall be placed, compacted and graded to provide firm, uniform
and continuous support for the pipe. Bell holes shall be excavated
so that only the barrel of the pipe bears upon the bedding. The pipe
shall be laid accurately to the lines and grades indicated on the
definitive plan. Blocking under the pipe will not be permitted. Bedding
shall be placed evenly on each side of the pipe to mid-diameter, and
hand tools shall be used to force the bedding material under the haunches
of the pipe and into the bell holes to give firm continuous support
for the pipe. The bedding material shall be placed a minimum of 12
inches above the top of the pipe and carefully compacted. The initial
three feet of backfill above the bedding material backfill shall be
placed in one-foot layers and carefully compacted. Generally, the
compaction shall be done evenly on each side of the pipe, and compaction
equipment shall not be operated directly over the pipe until sufficient
backfill has been placed to ensure that such compaction equipment
will not have a damaging effect on the pipe.
(p)
Each length of the pipe shall be shoved home
against the pipe previously laid and held securely until enough backfill
has been placed to hold the pipe in place. Joints shall not be pulled
or cramped.
(q)
Before any joint is made, the pipe shall be
checked to assure that a close joint with the next adjoining pipe
has been maintained and that the inverts are matched and conform to
the required grade. The pipe shall not be driven down to grade by
striking it.
(r)
Precautions shall be taken to prevent flotation
of the pipe in the trench.
(s)
When movable trench bracing, such as trench
boxes, movable sheeting, shoring or plates, is used to support the
sides of the trench, care shall be taken in placing and moving the
boxes or supporting bracing to prevent movement of the pipe, or disturbances
of the pipe bedding and the screened gravel backfill. Trench boxes,
movable sheeting, shoring or plates shall not be allowed to extend
below mid-diameter of the pipe. As trench boxes, movable sheeting,
shoring or plates are moved, screened gravel shall be placed to fill
any voids created, and the screened gravel and backfill shall be recompacted
to provide uniform side support for the pipe.
(t)
All fittings shall be furnished by the same
manufacturer that furnishes the pipe.
(u)
Wye branches shall be furnished and installed
and capped for all lots. Service connections shall be installed at
a minimum slope of 2% to the edge of the right-of-way. In each case
the end shall be capped and backed with a four-inch by four-inch wood
post extending to the finished ground surface.
(v)
All wye branches and capped ends shall have
their exact locations documented and include tie dimensions on as-built
plans.
(w)
PVC manhole drops shall be installed as internal
drop connection manholes, as shown on the details.
(x)
Pipe stubs for manhole connections shall not
exceed four feet in length unless directed otherwise by the Engineer.
Install caps where required.
(2)
Testing and cleaning of pipe.
(a)
For making low-pressure air tests, the developer
shall use equipment specifically designed and manufactured for the
purpose of testing sewer pipelines using low-pressure air. The equipment
shall be provided with an air regulator valve or air safety valves
so set that the internal air pressure in the pipeline cannot exceed
nine pounds per square inch gauge. The leakage test using low-pressure
air shall be made on each manhole-to-manhole section of pipeline.
Pneumatic plugs shall have a sealing length equal to, or greater than,
the diameter of the pipe to be tested. Pneumatic plugs shall resist
internal test pressure without requiring external bracing or blocking.
(b)
All air used shall pass through a single control
panel.
(c)
Low-pressure air shall be introduced into the
sealed line until the internal air pressure reaches four pounds per
square inch gauge greater than the maximum pressure exerted by groundwater
that may be above the invert of the pipe at the time of the test.
However, the internal air pressure in the sealed line shall not be
allowed to exceed nine pounds per square inch gauge. When the maximum
pressure exerted by the groundwater exceeds five pounds per square
inch gauge, the developer shall conduct only an infiltration test.
At least two minutes shall be allowed for the air pressure to stabilize
in the section under test. After the stabilization period, the low-pressure
air supply hose shall be quickly disconnected from the control panel.
The time required in minutes for the pressure in the section under
test to decrease from 3.5 to 2.5 pounds per square inch gauge (greater
than the maximum pressure exerted by groundwater that may be above
the invert of the pipe) shall not be less than that calculated using
the test time equation below as found in the Recommended Practice
for Low-pressure Air Testing of Installed Sewer Pipe, UNI-B-6-90,
Uni-Bell PVC Pipe Association's latest revision.
T = 0.085 (DK/Q)
| |||
Where:
| |||
T
|
=
|
Shortest time, in seconds, allowed for the air
pressure to drop to 1.0 pounds per square inch gauge
| |
K
|
=
|
0.000419 DL, but not less than 1.0
| |
Q
|
=
|
0.0015 cubic feet/minute/square feet of internal
surface
| |
D
|
=
|
Normal pipe diameter in inches
| |
L
|
=
|
Length of pipe being tested in feet
|
(d)
If the pipe section does not pass the air test,
sectionalize the section tested to determine the location of the leak.
Once the leak has been located, repair and retest.
(e)
A Mandril Test shall be performed on the sewer
system. Pipe segments exceeding the allowable deflection limits shall
be located, repaired and retested.
(3)
Manhole installation.
(a)
Manholes shall be constructed to the dimensions
as specified in these Road Construction Standards. All work shall
be protected against flooding and flotation.
(b)
The precast bases of manholes shall be placed
on a bed of twelve-inch screened gravel or crushed stone. The manhole
shall be set at a grade to assure that a maximum of eight-inch thickness
of brickwork will bring the manhole frame and cover to final grade.
(c)
Precast concrete barrel sections shall be set
so as to be vertical and with sections in true alignment with a one-fourth-inch
maximum tolerance to be allowed. The joints of precast barrel sections
shall be sealed with either a rubber O-ring set in a recess or the
preformed flexible joint sealant used in sufficient quantity to fill
75% of the joint cavity. The outside and inside joint shall be filled
with nonshrink mortar and finished flush with the adjoining surfaces.
(d)
Allow joints to set for 24 hours before backfilling.
Backfilling shall be done in a careful manner, bringing the fill up
evenly on all sides. If any leaks appear in the manholes, the inside
joints shall be caulked with lead wool, or another method that is
satisfactory to the Engineer. The developer shall install the precast
sections in a manner that will result in a watertight joint.
(e)
Holes in the concrete barrel sections required
for handling or other purposes shall be plugged with nonshrinking
grout or nonshrinking grout in combination with concrete plugs, and
finished flush on the inside.
(f)
Where holes must be cut in the precast sections
to accommodate pipes, cutting shall be done prior to setting manhole
sections in place to prevent any subsequent jarring which may loosen
the mortar joints.
(g)
Manhole pipe connections shall be accomplished
in the ways specified hereinbefore. Pipe stubs for future extensions
shall also be connected and the stub end closed by a suitable watertight
cap.
(h)
Steel reinforced polypropylene plastic manhole
rungs shall be driven into tapered holes in the precast riser and
cone sections during the manufacture of the sections. Holes for rungs
shall be performed during the casting of the sections and shall not
be drilled out after casting. The preformed holes shall be a minimum
of 3 1/2 inches deep and shall taper from 1 1/8 inches to
1 3/8 inches diameter. Precast sections having rungs which are
mortared or grouted in place shall not be accepted.
(i)
Mortar shall be mixed only in such quantity
as required for immediate use and shall be used before the initial
set has taken place. Mortar shall not be retained for more than 1 1/2
hours and shall be constantly worked over with hoe and shovel until
used. Antifreeze mixtures will not be allowed in the mortar.
(j)
No masonry shall be laid when the outside temperature
is below 40° F., unless provisions are made to protect the mortar,
bricks and finished work from frost by heating and enclosing the work
with tarpaulins or other suitable material. The Department's decision
as to the adequacy of protection against freezing shall be final.
(k)
Channels and shelves shall be constructed of
brick and concrete.
(l)
The brick-line channels shall correspond in
shape with the lower half of the pipe. The top of the shelf shall
be set at the elevation of the crown of the highest pipe and shall
be sloped one inch per foot to drain toward the channel. Brick surfaces
exposed to sewage flow shall be constructed with the nominal two-inch
by eight-inch face exposed (i.e., bricks on edge).
(m)
Manhole covers and frames shall be set in a
full mortar bed and bricks, a maximum of eight inches thick, and shall
be utilized to assure frame and cover are set to final grade prior
to placement of permanent paving.
(n)
All new manholes shall be thoroughly cleaned
of all silt, debris and foreign matter of any kind, prior to final
inspection.
(4)
Pump station installation.
(a)
Excavate soil in accordance with lines and levels
required for installation of the pump station.
(b)
Pump station shall be set on a properly compacted
twelve-inch bedding of screened gravel or crushed stone.
(c)
Suitable backfill material shall be placed and
compacted in layers not to exceed eight inches.
(d)
Install pump station effluent gravity sewer
connection and provide for pressure sewer discharge pipe, as specified.
(e)
Install exterior electrical wiring for pump
station, as specified.
(f)
Pump tests.
[2]
During the pump test, no cooling of the unit
by forced or circulated air shall be allowed.
[3]
The following field pump tests shall be performed:
[a]
Dry run test of the unit in which
no liquid is to be allowed to enter the inlet of the pump. The pump
exterior shall begin dry and remain dry during the test.
[b]
Dry pumping test of the unit in
which liquid shall be at a level sufficient to keep the pump volute
submerged to its center line during the test. The pump shall be operated
at the system design point.
[c]
Snore test, in which "snore" is
defined as that state when the pump is alternately pumping liquid
and air, would occur when the pump pumps the liquid down to expose
the inlet. The unit under test shall be submerged with just enough
liquid to accomplish "snore" and allowed to run for the stated time.
A.
Design.
(1)
In general, all water mains shall be sized to adequately
deliver both maximum daily consumption and fire flow requirements.
In sizing mains, due consideration shall be given to the location
of the mains in regard to the distribution system so that pressure
losses are held to a minimum. The minimum size for any main shall
be eight inches, however, the sizes of all water mains shall meet
with the approval of the Williamstown DPW.
(2)
The minimum size for house services shall be 3/4 of
an inch.
(3)
All water mains shall be adequately valved at all
street intersections.
(4)
Hydrants shall be spaced a maximum of 500 feet. Hydrant
laterals shall be six inches in diameter and each shall be provided
with a gate valve. Between intersections all mains shall be valved
at intervals not greater than 1,000 feet. These valves shall preferably
be spaced between hydrant locations so that not more than two hydrants
will be taken out of service at one time.
B.
Materials.
(1)
Pipe.
(a)
Ductile iron pipe shall be cement lined and
shall conform to ANSI A21.51 and AWWA C151, Class 52. The pipe shall
be supplied in lengths not in excess of 20 feet. Pipe shall be standard
mechanical joint or push-on type pipe, as manufactured by the American
Cast Iron Pipe Company, or US Pipe and Foundry Company, Clow Corp.,
or approved equal. Fittings shall be mechanical joint ductile iron
Class D. Fittings shall meet the requirements of ANSI, NEWWA and AWWA
specifications, as applicable. Rubber gasket joints shall be Super
Bell-Type, Tyton or MJ push-on joints conforming to ANSI A21.11. To
provide electrical conductivity across the pipe joints, cable bond
conductors or serrated bronze wedges gaskets shall be used, as manufactured
by the pipe supplier. Bolts shall be Ductile Durabolts and shall meet
the requirements of ANSI C-111 and AWWA A211-80. All pipe and fittings
shall have a cement mortar lining on the inside and a coal tar enamel
coat on the outside, in accordance with ANSI A21.4, except that cement
mortar lining shall be 1/8 inch in thickness for pipe two inches to
12 inches in diameter, with a plus tolerance of 1/8 inch. Each pipe
and fitting shall have cast on it, or stamped into the metal, the
initials of the maker's name and the year cast. Cast iron or ductile
iron fittings shall conform to ANSI Specifications A21.10 for mechanical
joints. Solid sleeves, plugs and caps shall conform to AWWA Specification
C110, Class D.
(b)
All fittings shall have restrained joints. Bends,
reducers, tees, valves, dead ends and hydrants are among the places
where thrust forces create unbalanced forces in the piping and where
the pipe and fittings shall be restrained. The minimum length of pipe
to be restrained on either side of the joint shall be as shown in
the table below:
Fitting
|
Number of Joints to Restrain on Either
Side of Fitting
(based on 18 feet of pipe length)
| ||
---|---|---|---|
90 bend
|
2
| ||
45 bend
|
1
| ||
22.5 bend
|
1
| ||
Tee:
| |||
Branch
|
2
| ||
Run
|
2
|
(c)
No restraining is required in the direction
of an existing pipe if only a short length of it is exposed in the
trench for making a new connection.
(d)
Concrete thrust blocks, instead of restrained
joints, shall be used at locations where no sufficient length of pipe
is available for restraining.
(2)
Gate valves. Valves shall be rated for 200 pounds
per square inch minimum working pressure and a minimum 400 pounds
per square inch test pressure. Valves shall be mechanical joint, have
a cast-iron body, nonrising bronze stem, O-ring seals and be of the
resilient seal seat type gate valve meeting the requirements of AWWA
C509. For standardization purposes, all gate valves shall be waterous
resilient wedge valves. The operating nut shall be standard AMA two-inch
square. Gate valves shall open left or counterclockwise.
(3)
Tapping sleeves and gate valves. Tapping valves shall
meet the requirements of AWWA C500. The valves shall be flanged by
mechanical joint outlet with nonrising stem, designed for vertical
burial and shall be the O-ring type. Operating nut shall be AWWA standard
two-inch square. The valve shall be provided with an overload seat
to permit the use of full size cutters. Gaskets shall cover the entire
area of flange surfaces. Tapping sleeves shall be 200 pounds per square
inch minimum working pressure with cadmium-plated cast-iron nuts and
bolts. Sleeves shall be mechanical joint for ductile iron and/or cast-iron
pipe. Tapping sleeves and valves shall be manufactured by Mueller.
(4)
Valve boxes.
(a)
Each gate valve shall be accompanied by a valve
box of the adjustable type, of heavy pattern, constructed of cast
iron and provided with cast-iron cover.
(b)
The upper section of each box shall have a flange
at the top, having sufficient bearing area to prevent settling. The
bottom of the lower section shall enclose the operating nut of the
valve and be base belled and have a forty-eight-inch base in length
and a twenty-six-inch or thirty-six-inch top section with no bottom
flange.
(c)
The box top will be the sliding type. Boxes
shall be of lengths consistent with the pipe depths. In general, all
pipe installed will have five feet minimum of cover. Covers shall
have the word "water" cast in the top.
(5)
Hydrants. Hydrants shall be Mueller Centurian, and
shall conform to the Standard Specifications for Fire Hydrants for
Ordinary Water Works Service, AWWA C502, and, in addition, shall meet
the specific requirements and exceptions which follow:
(a)
Hydrants shall be according to manufacturers
standard pattern and of standard size and shall have one four-and-one-half-inch
pumper nozzle and two two-and-one-half-inch hose nozzles.
(b)
Hydrant inlet connections shall have mechanical
joints for six-inch ductile iron pipe.
(c)
Hydrant valve opening shall have an area at
least equal to that area of five-and-one-fourth-inch minimum diameter
circle and be obstructed only by the valve rod. Each hydrant shall
be able to deliver 500 gallons minimum through its two two-and-one-half-inch
hose nozzles when opened together with loss of not more than two pounds
per square inch in the hydrants.
(d)
Each hydrant shall be designed for installation
in a trench that will provide five feet of cover. Hydrant extensions
shall be manufactured by the company furnishing the hydrants and of
a style appropriate for the hydrants finish.
(e)
Hydrants shall be hydrostatically tested, as
specified in AWWA C502.
(f)
All nozzle threads shall be National Standard
Thread.
(g)
Each nozzle cap shall be provided with a Buna
N rubber washer.
(h)
Hydrants shall be so arranged that the direction
of outlets may be turned 90° without interference with the drip
mechanism and without the mechanism obstructing the discharge from
any outlet.
(i)
Hydrants must be capable of being extended without
removing any operating parts.
(j)
A bronze nut and check nut shall be provided
to hold the main hydrant valve on its stem.
(k)
Hydrants must open by turning operating nut
to the left (counterclockwise) and must be marked with an arrow and
word "open" to indicate the direction to turn stem to open hydrant.
(l)
All iron work to be set below ground, after
being thoroughly cleaned, shall be painted with two coats of asphalt
varnish specified in AWWA C502 and iron work to be left above ground
shall be shop painted with two coats of paint of quality and color
to correspond with the present standard of the owner.
(m)
Each hydrant shall be designed such that the
hydrant valve closes with line pressure preventing loss of water and
consequent flooding in the event of traffic damage.
(n)
Each hydrant shall be furnished with a steel
chain holder, double steel cap chain, steel pumper cap chain and any
other hooks and/or appurtenances required for proper use.
(o)
Drain rings on each hydrant shall be plugged.
(6)
Service connections.
(a)
Corporation stops will be Mueller 110 compression
connection, or a Mueller flared connection.
(b)
Curb stops will be Mueller Oriseal Full Flow
110 conductive compression or floated fitting without drain.
(c)
Curb valve boxes will be for 3/4 inch service
connections, Erie type extension, or Minneapolis pattern, sixty-six-inch
length; one inch pipe screw cap.
(d)
Valve boxes will be for one- to two-inch inside
diameter, cast iron construction.
(e)
Copper tubing shall be Type K, soft temper,
conforming to ASTM B88. The name or trademark of the manufacturer
and type shall be stamped at intervals along the pipe.
(f)
Water services shall be minimum of 3/4 inch
diameter.
C.
Construction.
(1)
Pipe and fittings.
(a)
Care shall be taken in loading, transporting
and unloading to prevent injury to the pipe or coatings. Pipe or fittings
shall not be dropped. All pipe or fittings shall be examined before
laying, and no piece shall be installed which is found to be defective.
Any damage to the pipe coatings shall be repaired, as directed by
the Engineer.
(b)
If any defective pipe is discovered after it
has been laid, it shall be removed and replaced with a sound pipe.
All pipe and fittings shall be thoroughly cleaned before laying, shall
be kept clean until they are used in the work and when laid, shall
conform to the lines and grades required. Ductile iron pipe and fittings
shall be installed in accordance with requirements of AWWA Standard
Specification C600 except as otherwise provided herein. A firm, even
bearing throughout the length of the pipe shall be constructed by
tamping select material at the sides of the pipe up to one foot over
the top of the pipe.
(c)
Blocking will not be permitted.
(d)
All pipe shall be sound and clean before laying.
When laying is not in progress, including lunch time, the open ends
of the pipe shall be closed by a watertight plug or other approved
means. Good alignment shall be preserved in laying. The deflection
at joints shall not exceed that recommended by the manufacturer. Fittings,
in addition to those shown on the plans, shall be provided, if required,
in crossing utilities which may be encountered upon opening the trench.
Solid sleeves shall be used only where approved by the Engineer.
(e)
When cutting pipe is required, the cutting shall
be done by machine, leaving a smooth cut at right angles to the axis
of the pipe.
(f)
Cut ends of pipe to be used with a Tyton bell
shall be beveled to conform to the manufactured spigot end. Cement
lining shall be undamaged.
(g)
Mechanical joints shall be in accordance with
the Notes on Method of Installation under ANSI Specification A 21.11
and the instructions of the manufacturer. To assemble the joints in
the field, the contractor shall thoroughly clean the joint surfaces
and rubber gasket with soapy water before tightening the bolts.
(h)
Bolts shall be tight ended to the specified
torque with a torque wrench.
(i)
Under no condition shall extension wrenches
or pipe over handle or ordinary ratchet wrench be used to secure greater
leverage.
(j)
The water mains shall be subjected to a hydrostatic
pressure of 250 pounds per square inch for the pressure test, and
this pressure shall be maintained for at least two hours. The leakage
test shall be conducted concurrently with the pressure test at a pressure
of 250 pounds per square inch, and this pressure shall be maintained
for at least two hours. New hydrant branch gate valves shall remain
open and tapping sleeve gate valves closed during the testing.
(k)
The amount of leakage permitted shall be in
accordance with AWWA Specification C600, current edition. If any leaks
occur during either test, they shall be repaired to the satisfaction
of the Engineer.
(l)
The developer shall make any taps and furnish
all necessary caps, plugs, etc., as required in conjunction with testing
the pipe. He shall also furnish a test pump, gages and any other equipment
required in conjunction with carrying on the hydrostatic tests. He
shall at all times protect the new water mains and the existing water
mains against the introduction of polluting material.
(m)
Before being placed in service, all new water
pipelines shall be chlorinated in accordance with AWWA C601, Starting
Procedure for Disinfecting Water Mains. The procedure shall be approved
by the Engineer, in advance.
(n)
The location of the chlorination and sampling
points will be determined by the Engineer in the field. Taps for chlorination
and sampling shall be installed by the developer. The developer shall
uncover and backfill the taps, as required.
(o)
The general procedure for chlorination shall
be first to flush all dirty or discolored water from the lines, and
then introduce chlorine in approved dosages through a tap at one end,
while water is being withdrawn at the other end of the line. The chlorine
solution shall remain in the pipeline for about 24 hours.
(p)
Following the chlorination period, all treated
water shall be flushed from the lines at their extremities and replaced
with water from the distribution system. Bacteriological sampling
and analysis of the replacement water may then be made by the Engineer
in full accordance with AWWA Specification C601. The developer will
be required to rechlorinate, if necessary, and the line shall not
be placed in service until the requirements of the Massachusetts Public
Health Department are met.
(q)
Special disinfecting procedures shall be used
in connections to existing mains, and where the method outlined above
is not practical.
(2)
Gate valves. Gate valves and boxes shall be set with
the operating stem vertically aligned in the center of the valve box.
Valves shall be set on a firm foundation and supported by tamping
selected excavated material under and at the sides of the valve. Gate
valves shall be tied to the pipe with a mechanical joint anchoring
tee of 3/4 inch diameter tie rods and clamps.
(3)
Tapping sleeves and valves.
(a)
Installation shall be made under pressure and
the flow of water through the existing main shall be maintained at
all times. The diameter of the tap shall be a minimum of 1/4 inch
less than the inside diameter of the branch line.
(b)
The entire operation shall be conducted by workmen
thoroughly experienced in the installation of tapping sleeves and
valves.
(c)
The developer shall determine the location of
the existing main to be tapped to confirm the fact that the proposed
position for the tapping sleeve will be satisfactory and no interference
will be encountered, such as the presence of existing utilities or
of a joint or fitting at the location proposed for the connection.
No tap will be made closer than three feet from a pipe joint.
(d)
Tapping valves shall be set in vertical position
and be supplied with a two-inch square operation nut.
(e)
Tapping sleeves and valves with boxes shall
be set vertically and squarely centered on the main to be tapped.
Adequate support shall be provided under the sleeve and valve during
the tapping operation. Sleeves shall be no closer than three feet
from water main joints. Thrust blocks shall be provided behind all
tapping sleeves.
(f)
Proper tamping of supporting earth around and
under the valve and sleeve is mandatory. After completing the tap,
the valve will be flushed to ensure that the valve seat is clean.
(4)
Valve boxes. Valve boxes shall be installed vertically,
centered over the operating nut, and the elevation of the tap shall
be adjusted to conform with the finished surface of roadway or other
surface at the completion of the contract. Boxes shall be adequately
supported during backfilling to maintain vertical alignment.
(5)
Hydrants.
(a)
Hydrants shall be set at the location designated
by the Engineer and as shown on the definitive plan, and shall be
bedded on a firm foundation. Each hydrant shall be set in true vertical
alignment and shall be properly braced. Each hydrant shall be restrained
with three-fourths-inch tie rods back to the hydrant gate valve/hydrant
tee assembly.
(b)
The hydrant gate valve shall be restrained using
a mechanical joint hydrant anchoring tee, or equal. Hydrants shall
be touched up with matching paint, as required after installation.
(6)
Service connection.
(a)
At the time the new water main is being installed,
new corporation stops, copper tubing, curb stops and curb boxes shall
also be installed, as specified. Protection shall be provided for
the threads of corporation stops. The new corporation stops shall
remain closed until the copper tubing and curb stop is installed.
(b)
Service connections shall be installed for each
lot, as required.
(c)
Curb stops shall be installed two feet beyond
the right-of-way property line. In each case the end shall be capped
and backed with a four-inch by four-inch wood post extending to four
feet below the finished surface.
(d)
The developer shall be careful to obtain the
exact location of each connection and record the tie dimensions on
as-built plans before it is covered.
A.
Design. Streetlights shall be installed as specified
by the Williamstown Fire District.
B.
Materials. Streetlights shall conform to the type
and style in general use in the Town of Williamstown unless otherwise
specified by the Williamstown Planning Board and Williamstown Fire
District.
C.
Construction. Streetlight stanchions shall be located
at such intervals as required by the Williamstown Planning Board in
the grass plot, and shall be installed in accordance with the procedure
required by the Williamstown Planning Board and utility company.
A.
Other utilities include natural gas, electrical, CATV
and telephone lines.
B.
Design.
(1)
Gas mains may be installed if gas connection is available.
Electric, CATV and telephone lines shall be installed in underground
conduits, or direct burial.
(2)
Transformers, switches and other such equipment shall
be placed in approved aboveground locations outside the right-of-way.
Gas mains, electric, CATV and telephone lines shall be installed outside
of the paved road surface, generally as shown on the road cross-section
details.
(3)
All road crossings shall be installed in sleeves prior
to installation of the gravel road base. Transformers, pedestals,
termination boxes, etc., shall be located outside of the right-of-way.
C.
Materials. Materials shall be specified by the respective
utility.
D.
Construction. Construction methods shall be as specified
by the respective utility.
A.
Design. Shade trees shall be installed as specified
by the Town of Williamstown Planning Board.
B.
Materials. Materials shall be specified by the Town
of Williamstown Planning Board or Tree Warden.
C.
Construction. Installation of shade trees shall be
specified by the Williamstown Tree Warden and as located on the typical
road cross section.