The following documents shall be submitted for plat approval:
A. 
The plat to be filed with the County Clerk shall be printed upon linen or be clearly drawn in India ink upon tracing cloth. The size of the sheets shall be 20 inches by 20 inches or 20 inches by 40 inches, including a margin for binding of two inches outside of the border along the left side and a margin of one inch outside of the border along the remaining sides. The plat shall be drawn at a scale of no more than 100 feet to the inch and oriented with the North point at the top of the map. When more than one sheet is required, an additional index sheet of the same size shall be filed, showing, to scale, the entire subdivision with lot and block numbers clearly legible. Five copies of the plat, one of which shall be printed on Mylar, must be filed with the Planning Board.
B. 
The plat shall show:
(1) 
Proposed subdivision name or identifying title and the name of the town and county in which the subdivision is located, the name and address of the record owner and subdivider and the name, license number and seal of both a professional engineer and licensed land surveyor.
(2) 
Street lines, pedestrianways, lots, reservations, easements and areas to be dedicated to public use.
(3) 
Sufficient data acceptable to the Town Engineer to determine readily the location, bearing and length of every street line, lot line, boundary line and to reproduce such lines upon the ground. Where applicable, these should be referenced to monuments included in the state system of plane coordinates and, in any event, should be tied to reference points previously established by a public authority.
(4) 
The length and bearing of all straight lines, radii, length of curves and central angles of all curves and tangent bearings for each street. All dimensions and angles of the lines of each lot shall also be given. All dimensions shall be shown in feet and decimals of a foot. The plat shall show the boundaries of the property, location, graphic scale and true North point.
(5) 
By proper designation thereon, all public open spaces for which deeds are included and those spaces title to which is reserved by the developer. For any of the latter, there shall be submitted with the subdivision plat copies of agreements or other documents showing the manner in which such areas are to be maintained and the provisions made therefor.
(6) 
All offers of cession and covenants governing the maintenance of unceded open space, which shall bear the certificate of approval of the Town Attorney as to their legal sufficiency.
(7) 
Lots and blocks within a subdivision, which shall be numbered and lettered in alphabetical order in accordance with the prevailing Town practice.
(8) 
Permanent reference monuments, which shall be shown and shall be constructed in accordance with specifications of the Town Engineer. When referenced to the state system of plane coordinates, they shall also conform to the requirements of the State Department of Transportation. They shall be placed as required by the Town Engineer and their location noted and referenced upon the plat.
(9) 
All lot corner markers, which shall be permanently located satisfactorily to the Town Engineer, at least 3/4 inch in diameter, if metal, and at least 24 inches in length and located in the ground to existing grade.
(10) 
Monuments of a type approved by the Town Engineer, which shall be set at all corners and angle points of the boundaries of the original tract to be subdivided and at all street intersections, angle points in street lines, points of curve and such intermediate points as shall be required by the Town Engineer.
C. 
Construction drawings, including plans, profiles and typical cross sections, as required, showing the proposed location, size and type of streets; sidewalks; streetlighting standards; street trees; curbs; water mains; sanitary sewers and storm drains; pavements and subbase; manholes; catch basins; and other facilities.
D. 
Stormwater pollution prevention plan. A stormwater pollution prevention plan (SWPPP) consistent with Chapter 165, Stormwater Management and Erosion and Sediment Control, shall be required for final plat approval. The SWPPP shall meet the performance, design criteria and standards set forth in Chapter 165. The approved final subdivision plat shall be consistent with the provisions of Chapter 165.
[Added 1-10-2008 by L.L. No. 1-2008]