Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Warwick, NY
Orange County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Amended 11-13-1986]
[Amended 6-23-1988 by L.L. No. 1-1988; 2-13-2003; 4-16-2014 by L.L. No. 5-2014]
A. 
Each seasonal residence property shall be furnished with seasonal water from April 15 to October 15 at a rate of $200 in 2014, $250 in 2015 and $275 starting in 2016 each season or any part thereof. Each year-round flat-rate property will be $325/year in 2014, $350/year in 2015 and $375/year starting in 2016. Each metered year-round property will be converted to a flat-rate billing as follows: $225/year in 2014, $275/year in 2015, $350/year in 2016 and $375/year starting in 2017.
B. 
Commercial properties shall be metered and the water rates shall be as follows:
[Amended 1-3-2022 by Res. No. 2021-334]
(1) 
Up to 10,000 gallons per billing: $100.
(2) 
Over 10,000 and less than 30,000 gallons: $7 per 1,000 gallons.
(3) 
Over 30,000 gallons: $8 per 1,000 gallons.
C. 
Residential rates, whether seasonal or year-round, shall be due and payable in advance on or before April 30 each year.
[Amended 1-3-2022 by Res. No. 2021-334]
D. 
Meters in commercial properties shall be read on or about April 15 and October 15 in each year and a bill rendered for water consumed in each six-month period. The minimum charge for commercial properties shall be paid 1/2 on April 15 and October 15 in each year.
E. 
Unpaid water charges in arrears for 30 days shall be subject to a penalty of 10% of the amount due for 30 days or a portion thereof of delinquency. When any bill is in default at year-end closings, such bill shall be presented to the County of Orange for payment, and said bill will then become part of the County tax lien on said property.
F. 
The following charges for services by the District are hereby established:
(1) 
For making aboveground service tap on aboveground main and installing service pipe: $250.
(2) 
For making three-fourths-inch tap on the main connecting service pipe and installing curb valve and box: $1,000.
(3) 
There shall be an additional fee of $35 per linear foot for any drilling or trenching in a state highway as measured from the inside edge of the access trench on the side of the highway where the main is located to the inside edge of the corresponding trench on the opposite side of the highway. Such drilling in a state highway is subject to the approval of the New York State Department of Transportation as may be required by applicable statutes and regulations.
(4) 
The regular tap-in charge shall include 12 feet of drilling or trenching for three-fourths-inch pipe in service line. Where in excess of 12 feet of three-fourths-inch pipe in service line is required to reach the applicant's property line, an additional fee of $30 per linear foot will be charged. Payment of all fees for drilling, trenching or tapping shall be made in advance to the Town Board.
(5) 
Service taps in excess of three-fourths inch shall be installed only upon consent of the Town Board and at such price as shall be agreed upon.
(6) 
For turning on water and/or installing meter for nonseasonal users: $100.
(7) 
For shutting off water and/or removing meter for nonseasonal users: $100.