[Adopted 8-16-1990 by Ord. No. 3-1990]
This ordinance shall be known and may be cited as Ordinance No. Three of 1990 of the Town of Stillwater, Saratoga County, New York, amending the Town of Stillwater Zoning Ordinance, as adopted in April 1974 and as last amended, and providing for the creation of planned development district to be known as "Gurba Estates."
The Zoning Ordinance of the Town of Stillwater, and the Zoning Map of the Town of Stillwater set forth therein and made a part thereof, are hereby amended in accordance with Sections 15 and 24 of said ordinance, by changing from the existing R1-Low Density Residential District, the zoning classification of the property hereinafter described to that of a planned development district to be known as and described as "Gurba Estates."
The area of Gurba Estates consists of approximately 131 acres in the Town of Stillwater and is described and bounded as set forth in Appendix A (legal description) and Appendix B (sketch on Town Zoning Map) attached hereto and made a part hereof.[1] The area is located in the southeasterly quadrant of the Town of Stillwater and lies generally on the westerly side of the Castlecliff Subdivision.
[1]
Editor's Note: Said appendixes are included at the end of this chapter.
The Gurba Estates Planned Development District will include a maximum of 400 residential dwelling units in a mix intended to satisfy the demand for a variety of life styles. There will be 175 single-family detached homes and 20 two-family houses on 64 acres. In addition, there will be 102 one- and two-bedroom units in an apartment cluster of 11 acres and 78 townhouses on 12 acres. Public rights-of-way will occupy approximately 19 acres, and the remaining 25 acres, or approximately 19% of the total site, shall be green space, reserved for public usage. The preliminary development plan which illustrates the above-described land uses is set forth as Appendix C which is attached hereto and made a part hereof. The preliminary development plan may only be substantially amended or modified after a public hearing by the Town Board.
Water shall be supplied to Gurba Estates as either an extension of the existing Town Water District or a new Town Water District, as best serves the interests of the Town. As is customary, all extensions to the water service shall conform to state regulatory agency requirements and Town standards and be constructed at the sole expense of the developer.
The entire area of the planned development district is wholly within the limits of the Saratoga County Sewer District No. 1, and also within the treatment capacity of that District. All sewage collection facilities within the PDD together with any needed expansion of existing transmission facilities to permit delivery of the sanitary waste from Gurba Estates to the Mechanicville Treatment Plant will be constructed at the expense of the developer and deeded to the Sewer District. ownership and maintenance of the facilities will be the Sewer District's.
All streets and roadways shall be designed and constructed according to the Town of Stillwater Highway Department Standards and Specifications. It is anticipated the street rights-of-way with all improvements will be dedicated to the Town upon completion, without cost to the Town.
All improvements in Gurba Estates shall be designed and constructed in accordance with plans and specifications prepared by a duly licensed design professional in compliance with the applicable provisions of the New York State Building Code. Such plans and specifications shall be reviewed by the Town Planning Board which shall advise the Town Board which shall issue approval or disapproval. Final approvals and plans shall be filed in the office of the Town Clerk. The licensed professional(s) performing the work shall be employed by, at the sole expense of, the developer. All construction upon completion shall be subject to the inspection and approval of the Town Building Inspector, Town Engineer, Town Highway Superintendent, or other appropriate persons, as may be applicable.
The projected time for completion is projected at 10 years. The developer may phase Gurba Estates as market acceptance and construction economics dictate. Prior to construction of any phase, development Plans for that phase must be submitted and processed in accordance with the applicable portions of the Zoning Ordinance.
A. 
Development plans for Gurba Estates, submitted in accordance with the provisions of Section 15.4 of the Town of Stillwater Zoning Ordinance, shall be reviewed by the Town Planning Board and acted upon by the Town Board, as specified in Section 15.2A of said ordinance. The development plan shall be deemed to be in substantial compliance with the preliminary development plan provided modification by the developer does not:
(1) 
Violate any provision of this ordinance;
(2) 
Involve a reduction of more than 5% of the total site area reserved for common open space or recreational use;
(3) 
Increase the number of residential units by more than 10%.
B. 
If it is found by the Town Board that the development plans are not in compliance with the previously approved preliminary development plan, the developer shall submit a revised development plan to the Town Board for a review of such changes.
This ordinance shall take effect 10 days after approval by the Town Board and posting and publishing in the official newspaper of the Town as required by § 265 of the Town Law.