[Added 9-9-2004 by L.L. No. 1-2004]
A.
Filing fees shall be as follows:
(1)
On filing application for variance or special permit:
$2,000.
[Amended 9-10-2013 by L.L. No. 5-2013]
B.
Deposits for reimbursable Village expenses shall be
as follows:
(1)
In addition to the aforesaid filing fees, the applicant
shall be liable for and shall pay all charges incurred by the Village
in connection with the application:
(a)
Engineering fees and inspection charges: as
incurred by the Village.
(b)
Legal fees: as incurred by the Village.
(c)
Advertising: as incurred by the Village.
(d)
Stenographic minutes: as incurred by the Village.
(e)
Consultant fees: as incurred by the Village.
(f)
Documents recording fees: as incurred by the
Village.
(2)
The applicant shall deposit the following sums with
the Village Clerk, unless otherwise stated herein, simultaneously
with the filing of the application against which deposit the charges
for which the applicant is responsible shall be deducted. During the
course of the application, the Village Clerk may require the payment
of additional sums to cover actual Village expenses.
[Amended 12-10-2008 by L.L. No. 1-2008]
C.
Payment of fees and charges.
(1)
Consideration of application. No hearing shall be
held and no consideration shall be given by the Board of Zoning Appeals
to any application for a variance or special permit, nor shall any
building permit be issued, unless all required fees and deposits,
to the extent that the latter are then determined, shall have been
paid.
D.
Application remanded to Board of Zoning Appeals. In
those instances when decisions of the Board of Zoning Appeals are
appealed by the applicant and are subsequently remanded by a court
of this state to the Board of Zoning Appeals, the applicant shall
pay to the Village the following fees and deposits:
E.
Power of the Trustees. The Board of Trustees shall
have the authority to modify the filing fees and deposits as herein
provided as they may deem advisable in the Village's interest.