[HISTORY: Adopted by the Mayor and Council
of the City of Harrington as last amended 10-15-2007 by Ord. No.
07-14. Subsequent amendments noted where applicable.]
The fees charges by the City of Harrington for
the various municipal services provided by the City of Harrington
shall be as stated in the tables attached hereto and incorporated
herein by this reference.
A.
Various municipal fees.
[Amended 7-16-2007 by Ord. No. 07-09; 10-15-2007 by Ord. No. 07-14; 12-15-2008 by Ord. No. 08-07; 5-18-2009 by Ord. No. 09-01; 6-21-2010 by Ord. No. 10-02; 6-20-2011 by Ord. No. 11-02; 9-20-2011 by Ord. No. 11-06; 3-5-2012 by Ord. No. 12-03; 4-16-2012 by Ord. No. 12-09; 6-4-2012 by Ord. No. 12-11; 8-6-2012 by Ord. No. 12-19; 10-21-2013 by Ord. No. 13-05; 6-16-2014 by Ord. No. 14-04; 8-18-2014 by Ord. No. 14-13; 9-16-2014 by Ord. No. 14-14; 1-5-2015 by Ord. No. 14-17; 6-15-2015 by Ord. No. 15-05; 8-17-2015 by Ord. No. 15-08; 10-19-2015 by Ord. No. 15-12; 3-21-2016 by Ord. No. 16-02; 5-2-2016 by Ord. No. 16-05; 7-5-2016 by Ord. No. 16-10; 6-19-2017 by Ord. No. 17-07; 10-16-2017 by Ord. No. 17-14; 2-20-2018 by Ord. No. 18-01]
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
General Fees, Fines
| ||||
Administrative fee, per certified mail letter/notice
|
$25
|
$0
|
$25
|
No
|
Animals Chapter violations
|
$100
|
$0
|
$100
|
No
|
Copies, per page
|
$0.30
|
$0
|
$0.30
|
No
|
Disorderly premises
| ||||
First offense, minimum fine
|
$100
|
$0
|
$100
|
No
|
Second offense, minimum fine
|
$300
|
$0
|
$300
|
No
|
Each subsequent like offense
|
$500
|
$0
|
$500
|
No
|
Maximum fine per offense
|
$1,000
|
$0
|
$1,000
|
No
|
FOIA request
| ||||
Standard size copies/printout, black and white,
per page
|
$0.30
|
$0
|
$0.30
|
No
|
Standard size copies/printout, color, per page
|
$1
|
$0
|
$1
|
No
|
Labor, materials, and other costs charged at cost
|
At cost
|
$0
|
At cost
|
No
|
Juvenile curfew violations fines
| ||||
First offense by a parent
|
$5
|
$0
|
$5
|
No
|
Second offense by a parent
|
$15
|
$0
|
$15
|
No
|
Third and all subsequent offenses by a parent
|
$25
|
$0
|
$25
|
No
|
Personnel costs, per hour
|
$35
|
$0
|
$35
|
No
|
First offense by an operator
|
$100
|
$0
|
$100
|
No
|
Second offense by an operator
|
$150
|
$0
|
$150
|
No
|
Third and all subsequent offenses by an operator
|
$300
|
$0
|
$300
|
No
|
Parent knowingly provided false information
|
$100
|
$0
|
$100
|
No
|
Notary services, per stamp
|
$2
|
$0
|
$2
|
No
|
Open burning violations
|
$50
|
$0
|
$50
|
No
|
Property tax rate
|
$1.06/$100 on 100%
|
$0
|
$1.06/$100 on 100%
|
No
|
Returned checks
|
$30
|
$0
|
$30
|
No
|
Tax relief for senior citizens
|
5%
|
$0
|
5%
|
No
|
Transfer tax
|
1.5%
|
$0
|
1.5%
|
No
|
Vacant buildings
| ||||
Vacant building inspection (yearly after first year)
|
$75
|
$0
|
$75
|
No
|
Vacant building registration
|
$75
|
$0
|
$75
|
No
|
Failure-to-register fine (monthly)
|
$50
|
$0
|
$50
|
No
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
| |
---|---|---|---|---|---|
Zoning & Building Fees**, Fines
| |||||
Annexation application
|
$400 + $50/acre
|
$0
|
$400 + $50/acre
|
Yes
| |
Board of Adjustment variances
|
$400
|
$0
|
$400
|
Yes
| |
Board of Adjustment appeals
|
$500
|
$0
|
$500
|
Yes
| |
Category A, Conceptual site plan review
|
$400
|
$0
|
$400
|
Yes
| |
Category A, Preliminary site plan review
|
$400 + $50/1,000 sq. ft. new gross floor area
|
$0
|
$400 + $50/1,000 sq. ft. new gross floor area
|
Yes
| |
Category A, Final site plan review
|
$400 + $50/1,000 sq. ft. new gross floor area
|
$0
|
$400 + $50/1,000 sq. ft. new gross floor area
|
Yes
| |
Category B, Administrative plan review, R-1 and R-2 residential
properties except in approved residential subdivisions
|
$350
|
$0
|
$350
|
Yes
| |
Category B, Administrative plan review, all others besides R-1
and R-2 residential properties
|
$400
|
$0
|
$400
|
Yes
| |
Category B, Administrative plan review, R-1 and R-2 properties
in approved subdivisions
|
$200
|
$0
|
$200
|
Yes
| |
Conditional use
|
$500
|
$0
|
$500
|
Yes
| |
Demolition permit
| |||||
Accessory structure
|
$40
|
$0
|
$40
|
No
| |
Residential
|
$85
|
$0
|
$85
|
No
| |
Commercial/institutional
|
$150
|
$0
|
$150
|
No
| |
Impact fees*
| |||||
Community impact fee
|
$1,000
|
$0
|
$1,000
|
No
| |
Water impact fee, per EDU
|
$1,170
|
$0
|
$1,170
|
No
| |
Major subdivision, conceptual
|
$400
|
$0
|
$400
|
Yes
| |
Major subdivision, preliminary
|
$400 + $10/lot or dwelling unit
|
$0
|
$400 + $10/lot or dwelling unit
|
Yes
| |
Major subdivision, final plat approval
|
$400 + $10/lot or dwelling unit
|
$0
|
$400 + $10/lot or dwelling unit
|
Yes
| |
Minor subdivision
|
$400
|
$0
|
$400
|
Yes
| |
Professional fees
|
Billable to applicant
|
Yes
| |||
Portable storage unit permit
| |||||
Initial permit
|
$25
|
$0
|
$25
|
No
| |
Permit renewal
|
$25
|
$0
|
$25
|
No
| |
Violation, first offense
|
$25
|
$0
|
$25
|
No
| |
Violation, second offense
|
$50
|
$0
|
$50
|
No
| |
Violation, third offense
|
$100
|
$0
|
$100
|
No
| |
Public open space contribution
|
$325/dwelling unit
|
$0
|
$325/dwelling unit
|
No
| |
Rezoning
|
$500 + $25/acre
|
$0
|
$500 + $25/acre
|
Yes
| |
Site inspection, per visit
|
$35
|
$0
|
$35
|
No
| |
Street opening permit
|
10% of project cost
|
$0
|
10% of project cost
|
No
| |
Temporary sign permit
|
$15
|
$0
|
$15
|
No
| |
Utility review
|
$150
|
$0
|
$150
|
Yes
| |
Zoning compliance certificate for lot line adjustment
|
$100
|
$0
|
$100
|
Yes
| |
Zoning compliance certificate, residential
| |||||
Project cost $5,000 and below
|
$25
|
$0
|
$25
|
Yes
| |
Project cost $5,001 and above
|
0.5% of total project cost
|
$0
|
0.5% of total project cost
|
Yes
| |
Zoning violations fines
| |||||
First offense
|
Not less than $100
|
$0
|
Not less than $100
|
No
| |
Second offense
|
$250
|
$0
|
$250
|
No
| |
Third offense
|
$500
|
$0
|
$500
|
No
| |
Fourth and subsequent offenses
|
$1,000
|
$0
|
$1,000
|
No
|
* See § 180-1E for the sewer impact fee step increase schedule. Applicants will also be billed for the current Kent County sewer impact fee.
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
Utility & Public Works Fees, Fines
| ||||
Fire service connection
| ||||
4-inch
|
$3,000 + actual cost to install
|
$0
|
$3,000 + actual cost to install
|
Yes
|
6-inch
|
$3,500 + actual cost to install
|
$0
|
$3,500 + actual cost to install
|
Yes
|
8-inch
|
$4,000 + actual cost to install
|
$0
|
$4,000 + actual cost to install
|
Yes
|
10-inch
|
$6,000 + actual cost to install
|
$0
|
$6,000 + actual cost to install
|
Yes
|
Food service facility FOG interceptor or trap
| ||||
Inspection, per trap
|
$50
|
$0
|
$50
|
No
|
Reinspection, per trap
|
$50
|
$0
|
$50
|
No
|
Prohibited discharges violation fine, least serious
offenses
|
$500 or more
|
$0
|
$500 or more
|
No
|
Prohibited discharges violation fine, moderately
serious offenses
|
$3,000-$5,000
|
$0
|
$3,000-$5,000
|
No
|
Prohibited discharges violation fine, most serious
offenses
|
$5,000-$10,000
|
$0
|
$5,000-$10,000
|
No
|
Food service facility FOG interceptor or trap, criminal penalties
| ||||
§ 330-13B(1) per violation, per day
|
Up to $5,000
|
$0
|
Up to $5,000
|
No
|
§ 330-13B(2)
|
At least $5,000
|
$0
|
At least $5,000
|
No
|
§ 330-13B(3) per violation, per day
|
Up to $5,000
|
$0
|
Up to $5,000
|
No
|
§ 330-13B(4) per violation, per day
|
Up to $10,000
|
$0
|
Up to $10,000
|
No
|
Infrastructure inspection fee
|
4% of project cost
|
$0
|
4% of project cost
|
Yes
|
Public works service fee
| ||||
Normal business hours (8:00 a.m.-4:00 p.m.)
|
$50
|
$0
|
$50
|
No
|
After hours and weekends
|
$100
|
$0
|
$100
|
No
|
Backhoe, per hour
|
$85
|
$0
|
$85
|
No
|
Dump truck, per hour
|
$75
|
$0
|
$75
|
No
|
Public Works rate, per hour
|
$50
|
$0
|
$50
|
No
|
Sewer connection fee
| ||||
4-inch service
|
$1,700
|
$0
|
$1,700
|
Yes
|
6-inch service
|
$2,600
|
$0
|
$2,600
|
Yes
|
Road restoration/additional pipe, beyond 20 feet
|
Cost + 15%
|
$0
|
Cost + 15%
|
Yes
|
Water connection fee
| ||||
1-inch service
|
$1,250
|
$0
|
$1,250
|
Yes
|
2-inch service
|
$3,600
|
$0
|
$3,600
|
Yes
|
Road restoration/additional pipe, beyond 20 feet
|
Cost + 15%
|
$0
|
Cost + 15%
|
Yes
|
Water meter
| ||||
5/8 inch
|
Cost
|
$0
|
Cost
|
No
|
1 inch or larger
|
Cost
|
$0
|
Cost
|
Yes
|
Water meter pit and lid
|
Cost
|
$0
|
Cost
|
No
|
Irrigation water meter permit
|
$50
|
$0
|
$50
|
No
|
Water meter antenna replacement
|
$125
|
$0
|
$125
|
No
|
Water meter calibration
|
$50
|
$0
|
$50
|
No
|
Utility rate, in-City users, quarterly
| ||||
Sewer base fee, per EDU
|
$80
|
$0
|
$80
|
No
|
Sewer usage fee, per 1,000 gallons*
|
$5.76
|
$0
|
$5.76
|
No
|
Trash
|
$51.70
|
$0
|
$51.70
|
No
|
Water base fee, per EDU
|
$35
|
$0
|
$35
|
No
|
Water usage fee, per 1,000 gallons
|
$3.25
|
$0
|
$3.25
|
No
|
Sprinklers (as fire suppression), 2-inch
|
$125
|
$0
|
$125
|
No
|
Sprinklers (as fire suppression), 4-inch
|
$200
|
$0
|
$200
|
No
|
Sprinklers (as fire suppression), 6-inch
|
$250
|
$0
|
$250
|
No
|
Sprinklers (as fire suppression), 8-inch
|
$300
|
$0
|
$300
|
No
|
Utility rate, out-of-City users, quarterly
| ||||
Sewer base fee, per EDU
|
$106.40
|
$0
|
$106.40
|
No
|
Sewer usage fee, per 1,000 gallons*
|
$7.66
|
$0
|
$7.66
|
No
|
Water base fee, per EDU
|
$46.55
|
$0
|
$46.55
|
No
|
Water usage fee, per 1,000 gallons
|
$4.32
|
$0
|
$4.32
|
No
|
Utility late payment fee, per month
|
2%
|
$0
|
2%
|
No
|
* In addition to the sewer usage fee, users will be billed for
a Kent County treatment fee approved by Kent County. As of 2014, Kent
County approved rate is $2.34 per 1,000 gallons.
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
Licensing Fees, Fines
| ||||
Business license
| ||||
All other trades, businesses or occupations
|
$50
|
$0
|
$50
|
No
|
Distributors and manufacturers, 1-49 employees
|
$250
|
$0
|
$350
|
No
|
Distributors and manufacturers, 50 or more employees
|
$500
|
$0
|
$500
|
No
|
Gas, light, power, cable, TV, telephone, satellite
companies
|
$825
|
$0
|
$825
|
No
|
Hotels and motels, per room
|
$10
|
$0
|
$10
|
No
|
Hotels and motels, per suite
|
$15
|
$0
|
$15
|
No
|
Mobile home park, per space
|
$25
|
$0
|
$25
|
No
|
Railroads
|
$825
|
$0
|
$825
|
No
|
Contractor license
|
$100
|
$0
|
$100
|
No
|
Duplicate license
|
$7.50
|
$0
|
$7.50
|
No
|
Failure to obtain license fine, per month
| ||||
First month
|
$100
|
$0
|
$100
|
No
|
Second month
|
$200
|
$0
|
$200
|
No
|
Third and every month thereafter
|
$300
|
$0
|
$300
|
No
|
Failure to obtain a rental inspection fine, per month
| ||||
First month
|
$50
|
$0
|
$50
|
No
|
Second month
|
$100
|
$0
|
$100
|
No
|
Third and every month thereafter
|
$150
|
$0
|
$150
|
No
|
Manufactured home registration sticker
|
$225
|
$0
|
$225
|
No
|
Manufactured home annual license
|
$225
|
$0
|
$225
|
No
|
Manufactured home license, fine for failure to renew, per month
|
10%
|
$0
|
10%
|
No
|
Manufactured home park operator fines
| ||||
Allowing placement of manufactured home without
registration sticker, doubled if not paid within 10 days
|
$100
|
$0
|
$100
|
No
|
Allowing manufactured home to remain in park without
license, doubled if not paid within 10 days
|
$100
|
$0
|
$100
|
No
|
Peddler/solicitor license
|
$50
|
$0
|
$50
|
No
|
Rental license
|
$75
|
$0
|
$75
|
No
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
Property Maintenance Fees, Fines
| ||||
Administrative fee, prohibited weed growth violations
|
$100
|
$0
|
$100
|
No
|
Property maintenance violations
| ||||
First offense
|
$25
|
$0
|
$25
|
No
|
Second offense
|
$50
|
$0
|
$50
|
No
|
Third offense
|
$100
|
$0
|
$100
|
No
|
Abatement of property maintenance violations
|
Contractor service fee + 10% ($25 total minimum)
|
$0
|
Contractor service fee + 10% ($25 total minimum)
|
Yes
|
Property maintenance ticket
| ||||
Property maintenance ticket
|
$50
|
$0
|
$50
|
No
|
Formal appeal to City Manager
|
$200
|
$0
|
$200
|
No
|
Formal appeal to City Council
|
$500
|
$0
|
$500
|
No
|
Show-cause hearing
|
$100
|
$0
|
$100
|
No
|
Property maintenance criminal penalties
| ||||
First conviction
|
$250-$1,000
|
$0
|
$250-$1,000
|
No
|
Second conviction
|
$500-$2,500
|
$0
|
$500-$2,500
|
No
|
All subsequent convictions
|
$1,000-$5,000
|
$0
|
$1,000-$5,000
|
No
|
Street and sidewalk violations
| ||||
First offense
|
$25
|
$0
|
$25
|
No
|
Second offense
|
$50
|
$0
|
$50
|
No
|
Third offense
|
$100
|
$0
|
$100
|
No
|
Abatement of street and sidewalk violations
|
Contractor service fee + 10% ($25 total minimum)
|
$0
|
Contractor service fee + 10% ($25 total minimum)
|
Yes
|
B.
Building inspection permit fees.
[Added 12-7-2009 by Ord.
No. 09-09; amended 6-21-2010 by Ord. No. 10-02; 2-22-2011 by Ord. No. 10-04[1]]
(1)
Residential new construction.
(b)
Foundation only.
Type of Foundation
|
Standard
(per square foot)
|
---|---|
Basement
|
$13
|
(c)
Extras in new dwellings.
Type of Extras
|
Standard
(per square foot)
|
Brick
(per square foot)
|
---|---|---|
Full bath
|
$1,200 flat rate
| |
Half bath
|
$850 flat rate
| |
Prefab fireplace
|
$1,250 flat rate
| |
Masonry fireplace
|
$3,250 flat rate
| |
Finished basement
|
$4.50
| |
Open deck or porch
|
$8.50
| |
Porch with roof
|
$13
| |
Porch enclosed (unfinished)
|
$19
| |
Renovations (nonstructural)
|
$4.50
| |
Attached garage
|
$13
|
$16
|
Detached garage
|
$16
|
$19
|
(d)
Residential building inspection permit fees for new construction
are calculated as follows:
[Amended 3-21-2016 by Ord. No. 16-02]
[1]
For a valuation ranging from $0 to $1,000, the applicant shall
pay a fee of $50.
[2]
For a valuation not exceeding $1,000,000, the applicant shall
pay a fee of $10 for each $1,000 valuation or fraction thereof.
[3]
For all costs exceeding $1,000,000, the applicant shall pay
a fee of $3 for each additional $1,000 or fraction thereof.
(2)
Residential alterations/additions, accessory structures and fences.
(a)
Alterations and additions.
Type of Residential Alteration/Addition
|
Standard
(per square foot)
|
---|---|
Additional room
|
$50
|
Finished basement/bonus room
|
$4.50
|
Bath (additional plus square feet)
|
$300 lump sum
|
Siding/roofing
|
$3
|
Open deck or porch
|
$8.50
|
Porch with roof
|
$14
|
Porch enclosed (finished)
|
$22
|
Porch enclosed (unfinished)
|
$19
|
Renovations (structural)
|
$25
|
Renovations (non-structural)
|
$4.50
|
Fireplace prefab/wood pellet
|
$1,250 flat rate
|
Fireplace masonry
|
$3,500 flat rate
|
Chimney
|
$1,000 flat rate
|
(b)
Residential accessory structures.
Accessory Structure
|
Standard
(per square foot)
|
---|---|
Agricultural building
|
$30 flat rate
|
Attached garage
|
$13
|
Detached garage
|
$16
|
Pole structure with floor
|
$10
|
Pole structure-no floor (carport)
|
$6
|
Shed (less than 300 square feet)
|
$7
|
Shed (more than 300 square feet)
|
$10
|
(c)
Residential fences.
Fences
(per linear foot)
|
36 inches
|
48 inches
|
72 inches
|
84 inches
|
---|---|---|---|---|
Vinyl
|
$5
|
$7
| ||
Rail fence
|
$2
|
$3
| ||
Chain link
|
$3
|
$5
|
$6
| |
Wood
|
$5
|
$7
|
(d)
Residential building inspection permit fees for alterations,
additions, fences and swimming pools are calculated as follows:
[Amended 8-6-2012 by Ord.
No. 12-19; 3-21-2016 by Ord. No. 16-02]
[1]
For a valuation ranging from $0 to $1,000, the applicant shall
pay a fee of $50.
[2]
For a valuation not exceeding $1,000,000, the applicant shall
pay a fee of $10 for each $1,000 valuation or fraction thereof.
[3]
For all costs exceeding $1,000,000, the applicant shall pay
a fee of $3 for each additional $1,000 or fraction thereof.
(3)
Commercial/institutional/multifamily new construction.
(a)
Commercial/institutional/multifamily primary structures: Standard
fees for all commercial, institutional, and multifamily buildings,
including but not limited to retail, warehouse, pole buildings, restaurant,
office, medical clinics, hotels/lodges, fit-outs and all other commercial,
institutional and multifamily buildings shall be determined per square
foot (s.f.) using the Marshall & Swift Valuation.
(b)
Commercial/institutional/multifamily fences.
Fences
(per linear foot)
|
36 inches
|
48 inches
|
72 inches
|
84 inches
|
---|---|---|---|---|
Vinyl
|
$5
|
$7
| ||
Rail fence
|
$2
|
$3
| ||
Chain link
|
$3
|
$5
|
$6
| |
Wood
|
$5
|
$7
|
(c)
Commercial/institutional/multifamily storage sheds or pole structures
shall be determined per square foot (s.f.) using the Marshall &
Swift Valuation.
(d)
Commercial/institutional/multifamily signage shall be determined
by the actual cost of all sign materials used to include the base
and/or any support materials.
(e)
Commercial/institutional/multifamily new construction, fences,
storage shed or pole structure building inspection permit fees are
calculated as follows:
[Amended 3-21-2016 by Ord. No. 16-02]
[1]
For a valuation ranging from $0 to $1,000, the applicant shall
pay a fee of $50.
[2]
For a valuation not exceeding $1,000,000, the applicant shall
pay a fee of $10 for each $1,000 valuation or fraction thereof.
[3]
For all costs exceeding $1,000,000, the applicant shall pay
a fee of $3 for each additional $1,000 or fraction thereof.
(4)
Reinspection fees and fines (residential and commercial).
[1]
Editor's Note: This ordinance also provided an effective
date of 7-1-2010.
C.
Building plan review fees.
[Added 6-21-2010 by Ord.
No. 10-02; amended 2-22-2011 by Ord. No. 10-04; 3-21-2016 by Ord. No. 16-02]
(1)
Residential new construction plan review fee shall be a flat fee
of $150 for each plan review.
(2)
Residential alteration and addition plan review fee shall be a flat
fee of $75 for each plan review.
(3)
Commercial/institutional/multifamily new construction, storage shed,
pole building, alterations and additions shall be calculated at a
rate of $0.003 for each dollar value, with a minimum of $200 for each
plan review.
D.
E.
Sewer impact fee step increases shall be as follows:
[Added 7-5-2016 by Ord.
No. 16-10]
Sewer Impact Fee Step Increase Schedule
| |
---|---|
Fiscal Year
|
Sewer Impact Fee per EDU
|
2017
|
$1,260
|
2018
|
$1,260
|
2019
|
$1,575
|
2020
|
$1,890
|
2021
|
$2,205
|
2022
|
$2,520
|
2023
|
$2,595
|
2024
|
$2,647
|
2025
|
$2,700
|
2026
|
$2,755
|
2027
|
$2,810
|
2028
|
$2,866
|
2029
|
$2,923
|
2030
|
$2,980
|
G.
Electrical inspection fees.
[Added 5-21-2018 by Ord.
No. 18-08]
(1)
Residential new construction.
Type of Dwelling
|
Fee
|
---|---|
Single-family, maximum 200 amp service*
|
$110
|
Single-family, over 200 amp service*
|
$125
|
Modular dwelling, service and final only
|
$100
|
Modular dwelling, with additions
|
$120
|
Manufactured (mobile homes), service only
|
$85
|
*
|
Includes rough-in with service equipment and final inspection
(one trip each, two trips total).
|
(2)
Residential alterations/additions, swimming pools/hot tubs, and other.
Type of Service
|
Fee
|
---|---|
Alterations/additions, maximum of 30 devices
|
$85
|
Alterations/additions, more than 30 devices
|
$100
|
Services/feeder equipment, up to 400 amp
|
$75
|
Temporary construction service
|
$75
|
Swimming pools/hot tubs, 1 trip
|
$75
|
Swimming pools/hot tubs, 2 trips
|
$120
|
Alternate power sources, maximum 25 KVA
|
$120
|
Generators, maximum 30 KVA
|
$75
|
Reintroduction of power/survey
|
$100
|
(3)
Commercial.
Type of Equipment
|
Fee
|
---|---|
Rough wiring
| |
1 to 50 devices/outlets
|
$55
|
Each additional 25 devices/outlets
|
$15
|
Finals
| |
1 to 50 devices/outlets
|
$55
|
Each additional 25 devices/outlets
|
$15
|
Equipment
| |
First outlet of maximum 30 KW
|
$55
|
Each additional outlet
|
$15
|
Heat pumps
|
$55
|
Service equipment
| |
Maximum 400 amp
|
$75
|
Over 400 amp to 1,000 amp
|
$100
|
Over 1,000 amp
|
Quote
|
(4)
Calculation for commercial electrical inspection fees if not listed in § 180-1G(3). Commercial electrical inspection fees may be quoted using the most recently published ICC Building Valuation Data Tables per the following formula:
BVD value based on Occupancy Classification and Construction
Type
| |
X Square footage of occupancy/structure
| |
X Locality multiplier (standard
0.001)
| |
Inspection fee
|