Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Vineland, NJ
Cumberland County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
The City may at any time restrict or regulate the quantity of water used by the consumers in case of scarcity or if, in the judgment of the governing body, such restriction or regulation may be necessary for the safety of the community or in case of fire, and, in case of necessity, the City may be at liberty to shut off the water supply in order to make repairs, and said municipality shall not be liable under any circumstances for the deficiency or failure in the supply of water, whether occasioned by shutting off of water or any other cause whatsoever, nor shall the City be held liable for any damage caused by increased pressure being put on the mains during the time of fires, drills by the companies or any other time, and all contracts shall be held and construed to be made subject to the provisions of this section.
The City shall have the right to install meters at its own expense in any and all properties now being served on a nonmetered basis. All bills thereafter shall be rendered at metered rates. All new services installed shall be metered, except for the supply of water for temporary, building, construction, fire hydrant and sprinkler services or for other special purposes.
The City shall have the right to modify, rescind, amend or alter any of the terms of this Part 4 or make such additional regulations and restrictions as shall be found advisable for the protection of the municipal water system and plant.
The City reserves the right to turn off water for:
A. 
Nonpayment of rent therefor or any charges that may stand against any premises supplied.
B. 
Fraudulent representation on the part of the consumer.
C. 
Use of water for other purposes than those stated in the application or permit.
D. 
Hampering or in any way interfering with the mechanism of any meter or parts of a meter installed on any premises. This is a misdemeanor under the law.
E. 
Persistent violation of the rules and regulations of the Water-Sewer Utility.
The Water-Sewer Utility will spare no pains in order to furnish an abundant supply of good, pure and wholesome water at sufficient pressure for general usage and special pressure in case of fire, and, to ensure an efficient and successful management of the municipal water plant, the foregoing rules and regulations will be strictly enforced.
[Last amended 8-27-2019 by Ord. No. 2019-57]
The following rates shall be charged and paid for water services, effective July 1, 2019.
A. 
Schedule of flat water rates:
(1) 
Hydrants.
(a) 
$190 per year for the use of each hydrant for fire purposes only on private property; can be billed annually, biannually, or monthly at the utility's discretion.
(b) 
$27.50 per year for the use of each hydrant for fire purposes by the City on public highways; can be billed annually, biannually, or monthly at the utility's discretion.
(c) 
$300 per fire flow test. Procedures and applications are obtained from the Water Utility. No test shall be conducted without prior Water Utility approval and a scheduled test appointment.
(d) 
Automatic fire sprinkler service. For service connections to an automatic fire sprinkler system for fire protection only:
Meter Size
(inches)
Rate per Year
2 and 3
$375
4
$450
6 and larger
$525
B. 
Metered rates. The following rates shall be hereafter charged monthly for water supplied by metered measurement to consumers. The following rates apply on the consumption as registered by one or more meters. The consumption by multiple meters on an account will be combined in rendering the monthly statement of charges.
Gallonage per Month
Rate per Thousand Gallons
First 25,000 gallons
$2.81
Next 225,000 gallons
$2.07
Next 2,250,000 gallons
$1.60
Next 2,500,000 gallons
$1.41
(1) 
Metered service rates. The following shall be the rates at which water will be furnished, the allowance of water for the said minimum charge to be deducted from the quantities shown below under minimum charges.
(2) 
Minimum charges. After a meter is installed, no bill will be rendered or payment accepted for less than the following minimum rates for each meter monthly:
Meter Size
(inches)
Gallonage Included
Monthly Rates
Through 5/8
3,000
$12.32
Through 1
10,000
$32.94
Through 1 1/2
16,000
$56.03
Through 2
21,000
$69.22
Through 3
25,000
$79.09
Through 4
30,000
$107.07
Through 6
80,000
$247.07
Through 8
107,000
$329.42
Through 10
133,000
$411.77
C. 
Additional consumer units.
(1) 
There shall be a monthly consumer unit charge for each additional unit (multifamily dwelling) served through the same meter as follows:
Equivalent Units
Monthly Charge
3 or more bedrooms
1
$4.97
2 bedrooms
3/4
$3.75
1 bedroom
1/2
$2.52
Hotel/motel (per room)
1/4
$1.23
(2) 
Examples of multifamily dwellings: apartments, duplexes, mobile home parks, condominiums, senior complexes, townhouses, etc.
(3) 
Service charge. The Water-Sewer Utility reserves the right to impose a service charge on all meters if deemed necessary.
(4) 
For replacement and supply of a water meter damaged or stolen from a residential location, the applicant for water service shall be required to purchase the appropriate size meter at their expense prior to receiving water service. The cost for such meter shall be consistent with the current cost as listed on the Vineland Municipal Utilities Rate Card.
[Added 9-13-2022 by Ord. No. 2022-70]
D. 
Tapping fees.
(1) 
Tapping, meter and meter pit fees (piping to curbline complete) shall be charged as follows:
[Amended 4-28-2020 by Ord. No. 2020-22; 6-28-2022 by Ord. No. 2022-49]
Size of Tap
(inches)
Fee
5/8 with meter pit
$2,250
1 with meter pit
$2,250
1 1/2 with meter and pit
$4,765
2 with meter and pit
$5,580
4
$2,788
6
$3,068
8
$3,715
10
$4,690
12
$6,105
(2) 
Taps, meters and meter pits larger than two inches in size shall be made only on special arrangement with the Water-Sewer Utility, and the applicant shall pay the full and actual cost of materials and installation. Excavation and required compactions shall be executed by a contractor per the specification sheet provided by the Water Utility.
(3) 
All charges incident to tap applications shall be due and payable in advance.
E. 
Street opening fees. A street opening fee in such amount as may be determined by ordinance or resolution of City Council shall be charged in addition to the above tap charges.
F. 
Missed appointment charge. A charge of $45 shall be debited to the account of a Water-Sewer Utility customer who fails to keep a prescheduled appointment for services to be performed or readings to be taken.
[Amended 4-28-2020 by Ord. No. 2020-22]
G. 
Recovery clause. The Water-Sewer Utility reserves the right to impose a recovery clause to adjust for the escalation in energy and treatment costs associated with the supply and distribution of City water.
H. 
Connection fee.
[Amended 9-27-2022 by Ord. No. 2022-75]
(1) 
A water connection fee is initially required from a new connector to the Water Utility distribution system. A connection fee represents a fair payment toward the total capital cost for developing the water distribution infrastructure system as determined by ordinance or resolution of City Council. The Water Utility reserves the right to review the original submission of gallons-per-day usage versus actual gallons-per-day water usage of the established business for period of three years from the time of water service activation and adjust the original paid connection fee accordingly. Water connection fees of the established business will be recalculated when additional water service laterals at the business location are requested no matter what the time from post-service activation. Multiphase projects are subject to review at the start of each phase for calculation of water connection fees. Multiphase projects are subject to review upon completion of each phase. All aforementioned time of water service activation terms, conditions and review of water usage apply to each phase of multiphase projects. All water utility fees are due in full prior to issuance of a building permit for single and multiphase projects.
I. 
Assessment fee.
(1) 
Assessment for water main extension shall be based on the number of properties in the project. The total cost for the project shall be divided by the number of properties that are serviceable by the water main extension.
(2) 
Each property that is serviceable by the water main extension shall be provided with a standard 5/8 inch water tap, meter and meter pit. The owner of the parcel shall determine the location of the tap on the frontage of the property. The cost for the tap/meter/pit shall be included in the assessment. Any additional taps, or taps of increased size, requested by the property owner, must conform to all zoning and other regulations set forth by the City of Vineland and the Vineland Water-Sewer Utility. If permitted, additional and/or larger taps will be charged to the property owner and will not be included in the assessment. A connection fee, as established by this chapter, shall be paid in advance before access is granted.
(3) 
Easements/rights-of-way: No assessments shall be levied upon government or public utility easements/rights-of-way.
(4) 
Properties that are owned by government, utilities, schools, and other tax-exempt properties are assessable.
(5) 
Railroad property shall be exempt from assessment, with the exception of railroad properties that require a water tap.
(6) 
Unique situations may be exempted from assessment upon approval by the Water-Sewer Utility Superintendent and the Business Administrator.
(7) 
Any parcel that is subdivided to create a new parcel contained within the original project area and completed within the original period of the assessment shall be subject to payment of the same lot assessment as if it had existed at the time of the construction of the project. This assessment shall be paid in full during the period of the original assessment and may be charged in annual assessments. Installation of new taps shall not be permitted until the street-opening moratorium has expired.
(8) 
The Water-Sewer Utility reserves the right to have the customer (commercial customers only) replace their existing water meter with a new Water-Sewer Utility meter at the current market price if the Utility deems the existing meter to be malfunctioning due to age and/or meter equipment failure. Cost of the meter shall be the responsibility of the customer.
[Added 4-28-2020 by Ord. No. 2020-22]
[Added 8-26-1986 by Ord. No. 86-46]
In order to make bills more easily understood by the customers, all water bills shall reflect the gallonage pumped to each customer during the quarter. Since the water meters record cubic feet of usage, a conversion factor of 7.5 gallons per cubic foot of water shall be used.
[Added 8-26-2003 by Ord. No. 2003-43; amended 11-23-2004 by Ord. No. 2004-64; 11-7-2005 by Ord. No. 2005-82]
A. 
Assessment for water main extension shall be based on the number of properties in the project. The total cost for the project shall be divided by the number of properties that are serviceable by the water main extension.
B. 
Each property that is serviceable by the water main extension shall be provided with a standard one-inch water tap. The owner of the parcel shall determine the location of the tap on the frontage of the property. The cost for the tap shall be included in the assessment. Any additional taps or taps of increased size, requested by the property owner, must conform to all zoning and other regulations set forth by the City of Vineland and the Vineland Water-Sewer Utility. If permitted, additional and/or larger taps will be charged to the property owner and will not be included in the assessment. A connection fee, as established by this part, shall be paid in advance before access is granted.
C. 
Easements/rights-of-way. No assessments shall be levied upon government or public utility easements/rights-of-way.
D. 
Properties that are owned by governments, utilities, schools, and other tax-exempt properties are assessable.
E. 
Railroad property shall be exempt from assessment, with the exception of railroad properties that require a water tap.
F. 
Unique situations may be exempted from assessment upon approval by the Water-Sewer Utility Superintendent and the Business Administrator.
G. 
Any parcel that is subdivided to create a new parcel contained within the original project area and completed within the original period of the assessment (usually 10 years) shall be subject to payment of the same lot assessment as if it had existed at the time of the construction of the project. This assessment shall be paid in full during the period of the original assessment and may be charged in annual assessments. Installation of new taps shall not be permitted until the street opening moratorium has expired, usually five years.