[Amended 10-18-2000 ATM, Art. 14]
Consumers shall be responsible for furnishing
the WSD with the correct billing address and names.[1] All changes in billing addresses shall be in writing.
[1]
Editor's Note: At the 3-5-1924 ATM it was
voted that after December 31, 1924, the water rates be collected from
the landlord or owner of the property. A copy of the notice to this
effect is a part of Appendix A of this chapter. Said Appendix A, including
such notice, is on file in the office of the Town Clerk, the Department
of Public Works, the Planning Office and the office of the Building
Inspector and may be examined there during regular business hours.
Failure to receive bills shall not constitute
a reason for extension of time for payment.
A.
The index presented below should be used to assist
the consumer in finding the reference that explains fees associated
with services performed by the Water and Sewer Division.
Subject
|
Reference
| |
---|---|---|
New house services
| ||
Water rates
|
Subsection B(2)
| |
New subdivisions
| ||
New sprinkler systems
|
Subsection B(4)
| |
Testing meter
|
Subsection B(5)
| |
Resealing meter
|
Subsection B(6)
| |
Frozen meter reset
|
Subsection B(7)
| |
Turn water on and off
|
Subsection B(8)
| |
Cross-connection device test
|
Subsection B(9)
| |
Final meter readings
|
Subsection B(10)
| |
Replace water meter valves
|
Subsection B(11)
| |
Fine for second estimated bill
|
Subsection B(12)
| |
Inspection charges
|
Subsection B(13)
| |
License fees
|
Subsection C(1)
| |
Road reconstruction
|
Subsection C(2)
|
B.
House services; building services.[1]
[Amended 10-18-2000 ATM, Art. 14]
(1)
New water service, complete, from water main to edge
of property, including water main tap: as set by the Department of
Public Works.
(2)
Water rates: as set by the Department of Public Works.
(3)
Water main tapping fees: as set by the Department
of Public Works.
(4)
Sprinkler connections: as set by the Department of
Public Works.
(5)
Test meter at customer's request: as set by the Department
of Public Works.
(6)
Resealing meter that has been tampered with: as set
by the Department of Public Works.
(7)
Frozen meter reset, up to one-inch (over one-inch
is property owner's responsibility): as set by the Department of Public
Works.
(8)
Turning on or off water: as set by the Department
of Public Works.
(9)
Cross-connection test fee, per device: as set by the
Department of Public Works.
(10)
Final meter readings: as set by the Department
of Public Works.
(11)
Replace water meter valves within homes: as
set by the Department of Public Works.
(12)
Fine for second estimated water and sewer bill:
as set by the Department of Public Works.
(13)
Inspection charges: as set by the Department
of Public Works.