Table of Contents
Table of Contents
- Part I: Administrative Legislation
- Ch 1 General Provisions
- Ch 12 Fire Department
- Ch 17 Library
- Ch 20 Local Government Investment Trust
- Ch 26 Planning Commission
- Ch 33 Salaries and Compensation
- Ch 37 Secretary/Treasurer
- Part II: General Legislation
- Ch 48 Adult Uses
- Ch 61 Building Construction
- Ch 66 Buildings, Numbering of
- Ch 74 Circuses, Carnivals and Transient Merchants
- Ch 77 Construction Codes, Uniform
- Ch 92 Firearms and Hunting
- Ch 97 Fire Prevention
- Ch 99 Floodplain Management
- Ch 123 Nuisances
- Ch 130 Peace and Good Order
- Ch 135 Plumbing
- Ch 149 Sewers
- Ch 158 Solid Waste
- Ch 160 Stormwater Management
- Ch 160 Art I General Provisions
- ยงย 160-1 Short title.
- ยงย 160-2 Statement of findings.
- ยงย 160-3 Purpose.
- ยงย 160-4 Statutory authority.
- ยงย 160-5 Applicability; regulated activities.
- ยงย 160-6 Exemptions.
- ยงย 160-7 Repealer.
- ยงย 160-8 Severability.
- ยงย 160-9 Compatibility with other ordinances or legal requirements.
- ยงย 160-10 Erroneous permit.
- ยงย 160-11 Waivers.
- Ch 160 Art II Definitions
- ยงย 160-12 Interpretation.
- ยงย 160-13 Definitions.
- Ch 160 Art III Stormwater Management
- ยงย 160-14 General requirements.
- ยงย 160-15 Permit requirements by other governmental entities.
- ยงย 160-16 Erosion and sediment control during regulated earth disturbance activities.
- ยงย 160-17 Nonstructural project design process.
- ยงย 160-18 Infiltration volume requirements.
- ยงย 160-19 Water quality requirements.
- ยงย 160-20 Stream bank erosion requirements.
- ยงย 160-21 Stormwater peak rate control.
- ยงย 160-22 Calculation methodology.
- ยงย 160-23 Other requirements.
- ยงย 160-24 Riparian buffers.
- Ch 160 Art IV Stormwater Management (SWM) Site Plan Requirements
- ยงย 160-25 General requirements.
- ยงย 160-26 SWM site plan contents.
- ยงย 160-27 Plan submission.
- ยงย 160-28 Stormwater management (SWM) site plan review.
- ยงย 160-29 Revision of plans.
- ยงย 160-30 Resubmission of inconsistent or noncompliant SWM site plans.
- Ch 160 Art V Inspections
- ยงย 160-31 Inspections.
- ยงย 160-32 As-built plans, completion certificate; final inspections.
- Ch 160 Art VI Fees and Expenses
- ยงย 160-33 Municipality SWM site plan review and inspection fee.
- ยงย 160-34 Expenses covered by fees.
- Ch 160 Art VII Operation and Maintenance (O&M) Responsibilities and Easements
- ยงย 160-35 Performance guarantee.
- ยงย 160-36 Responsibilities for operations and maintenance (O&M) of stormwater controls and BMPs.
- ยงย 160-37 Municipal review of stormwater control and BMP operations and maintenance plan.
- ยงย 160-38 Adherence to approved stormwater control and BMP operations and maintenance plan.
- ยงย 160-39 Operations and maintenance agreement for privately owned stormwater controls and BMPs.
- ยงย 160-40 Stormwater management easements.
- ยงย 160-41 Recording of approved stormwater control and BMP operations and maintenance plan and related agreements.
- ยงย 160-42 Inspection and BMP operation and maintenance requirements.
- Ch 160 Art VIII Prohibitions
- ยงย 160-43 Prohibited discharges.
- ยงย 160-44 Prohibited connections.
- ยงย 160-45 Roof drains and sump pumps.
- ยงย 160-46 Alteration of BMPs.
- Ch 160 Art IX Enforcement and Penalties
- ยงย 160-47 Right of entry.
- ยงย 160-48 Public nuisance.
- ยงย 160-49 Enforcement generally.
- ยงย 160-50 Suspension and revocation of permits and approvals.
- ยงย 160-51 Penalties.
- ยงย 160-52 Notification.
- ยงย 160-53 Enforcement.
- ยงย 160-54 Appeals.
- Ch 162 Subdivision and Land Development
- Ch 166 Taxation
- Ch 171 Utility Poles, Wires and Lines
- Ch 175 Vehicles and Traffic
- Ch 179 Water Conservation
- Ch 185 Zoning
- Appendix
- Ch A189 Cable Television Franchise
- Disposition List
- Ch DL Disposition List