Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Westwood, NJ
Bergen County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
The Sewer Engineer shall file a complete set of connection or wye plans (including latest revisions) with the Board of Health.
No person shall connect any portion of the building drain outside of the house to the building connection or any portion of the building connection to the building sewer lateral unless and until the Plumbing Inspector shall first have issued a certificate to the effect that the building connection is in good order and conforms in every respect to the requirements of the Board of Health for construction thereof.
A. 
When installing the building connection, the trenches shall be dug in a careful manner and properly sheathed where required. The excavated materials shall be piled in a compact heap, so placed as to cause the least possible inconvenience to the public. Proper barricades and lights must be maintained around the trench to guard against accidents. Extreme care shall be taken to prevent any dirt, stones or other undesirable material from entering the public sewer system during these operations.
B. 
In backfilling, the material for the two feet immediately over the pipe shall contain no stones or other material that may break or damage the pipe. All backfill material for the trench shall be placed by tamping in eight-inch layers so as to avoid any settlement. When the trench has been filled to the proper height, the surface material shall be replaced and heavily tamped and rolled.
C. 
Where the trench is excavated in rock, the rock must be carefully excavated to a depth of six inches below the grade line of the sewer and the trench brought to the proper elevation with gravel or other material satisfactory to the Plumbing Inspector. The remainder of the trench must be backfilled with approved material.
D. 
Nothing in this section shall be construed as abrogating any of the existing requirements of the Borough relating to the excavation and backfilling of trenches, but the requirements herein contained shall be in addition thereto.
E. 
Where subsoil conditions, in the opinion of the Plumbing Inspector, are such as to require special precautions, such steps shall be taken as may be directed by the Plumbing Inspector. In quicksand, all pipes must be laid out on planking two inches thick by at least six inches wide.