Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Cranberry, PA
Butler County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 96-273, 9/5/19961; as amended by Ord. 99-298, 10/6/1999, §§ 1, 2; by Ord. 2000-306, 8/3/2000, § 2; by Ord. 2004-350, 6/3/2004, § 2; and by Ord. 2005-362, 12/15/2005]
1. 
Street Classifications.
A. 
The following street classification system is hereby adopted for streets in the Township.
(1) 
Arterial street RD-01.
(2) 
Commercial collector street RD-02.
(3) 
Residential collector street RD-03.
(4) 
Local commercial street RD-04.
(5) 
Local residential street RD-05.
(6) 
Internal Street (RD-06).
(7) 
Local Commercial Street with Parallel Parking (RD-07).
[Amended by Ord. 2006-372, 5/4/2006, § 6]
(8) 
Local Residential Street with Parallel Parking (RD-26).
[Added by Ord. 2006-372, 5/4/2006, § 6]
(9) 
Main Street (RD-20, RD-21, RD-22, RD-23).
[Added by Ord. 2006-372, 5/4/2006, § 6]
(10) 
Boulevard/Parkway (RD-25).
[Added by Ord. 2006-372, 5/4/2006, § 6]
(11) 
Lane (RD-24).
[Added by Ord. 2006-372, 5/4/2006, § 6]
B. 
The functional classification of streets is as specified in the current comprehensive plan of the Township, adopted by the Township, for future conditions.
C. 
The functional classification of any street which is not specified in the current comprehensive plan of the Township, adopted by the Township, shall be determined by the Engineer consistent with the definitions for the street classification system.
2. 
Street Grading and Paving Standards.
[Amended by Ord. 2006-372, 5/4/2006, § 4 and 6]
A. 
Arterial Streets (RD-01). Grading, paving, curbing, underdrains, and berm grading for major local residential streets shall be done in accordance with construction standards in RD-01.
B. 
Commercial Collector Street (RD-02). Typical section of paving, underdrains and berm grading for collector roads shall be in accordance with the construction standard in RD-02. Geometric design shall be in accordance with the appropriate design speed as determined by the Township upon recommendation by the Engineer, the design standards in the Subdivision and Land Development Ordinance [Chapter 22] and this chapter.
C. 
Residential Collector Street (RD-03). Typical section of paving, underdrains and berm grading for residential collector roads shall be in accordance with the construction standards in RD-03. Geometric design shall be in accordance with the appropriate design speed as determined by the Township upon recommendation of the Engineer, the design standards in the Subdivision and Land Development Ordinance [Chapter 22] and this chapter.
(1) 
Residential Collector Streets. Inlet installation shall be in accordance with plan view layout and standards in Detail RD-03A.
D. 
Local Commercial Street (RD-04). Typical section of grading, paving, curbing, underdrains and berm grading for local commercial or industrial streets shall be in accordance with the construction standard in RD-04.
E. 
Local Residential Street (RD-05). Grading, paving, curbing, underdrains and berm grading for minor local residential streets shall be done in accordance with the construction standards in RD-05, Typical Road Section.
F. 
Internal Street (RD-06). An internal street is a street located internal to a development site, which may connect at one or both ends to a perimeter public street or adjacent development. The internal street system is intended to provide vehicle, pedestrian, and bicycle access and circulation to all uses within a developmental site. Grading, paving, curbing, underdrain, and berm grading for internal streets shall be done in accordance with the construction standards (RD-06).
G. 
Local Commercial Street with Parallel Parking (RD-07). Upon approval of the Township and consistent with § 27-322, local commercial streets may be constructed to accommodate on-street parking. All on-street parking shall be delineated and protected. Grading, paving, curbing, underdrain, and berm grading for local commercial streets shall be done in accordance with the construction standards (RD-07).
H. 
Local Residential Street with Parallel Parking (RD-26). Upon approval of the Township and consistent with § 27-322, local residential streets may be constructed to accommodate on-street parking. All on-street parking shall be delineated and protected. Grading, paving, curbing, underdrain, and berm grading for local residential streets shall be done in accordance with the construction standards (RD-26).
I. 
Main Street (RD-20, RD-21, RD-22, RD-23). A main street is a primary thoroughfare that emphasizes pedestrian-oriented, mixed-use design. Front building facades face a main street on one or both sides of the street. On-street parking is permitted, but is done so in a manner that maintains safe pedestrian circulation. Grading, paving, curbing, underdrain, and berm grading for main streets shall be done in accordance with the construction standards of RD-20, RD-21, RD-22, or RD-23.
J. 
Boulevard/Parkway (RD-25). On a boulevard (or parkway), the vehicular travel lanes are separated by a landscaped median to provide visual interest. Grading, paving, curbing, underdrain, and berm grading for boulevards shall be done in accordance with the construction standards of RD-25.
K. 
Lane (RD-24). A lane (or alley) is a vehicular accessway located to the rear of a lot providing access to parking and outbuildings and may also provide for utility easements. Grading, paving, curbing, underdrain, and berm grading for lanes shall be done in accordance with the construction standards of RD-24.
L. 
Trench Repaving for Bituminous Paving (RD-13). All pavement restoration in bituminous pavement shall be constructed in accordance with the construction standard in RD-13, Pavement Restoration Detail.
M. 
Subsurface Drains (RD-10). Permanent underdrains of a size and slope to be determined by the Engineer shall be installed on both sides of all streets to prevent the infiltration of water under the paved roadway. All underdrains shall parallel the roadway as nearly as possible and shall be constructed in accordance with construction standards of RD-10.
[Amended by Ord. 2010-403, 10/7/2010]
N. 
Materials. The base course and wearing surface of all streets shall be constructed in accordance with the standards of this Chapter, and all materials used shall meet the latest Pennsylvania Department of Transportation specifications. Additional base course depths may be required as the Engineer may determine to be necessary for the type of street that has been proposed.
O. 
Utilities in Streets. All utilities crossing streets shall be installed in trenches backfilled and compacted with aggregate meeting PennDOT specifications and approved by the Engineer, and all other utilities within the right of way of streets shall be installed before paving is completed. A Township road occupancy permit is required for any new utility installation within an existing Township street.
[Amended by Ord. 2010-403, 10/7/2010]
P. 
(Reserved)
Q. 
Shoulders. Street shoulders shall be graded for the full width of the right-of-way in accordance with this Chapter and thoroughly compacted by rolling all shoulders. Slopes shall be seeded to prevent erosion.
R. 
Two-Phase Paving.
[Amended by Ord. 2010-403, 10/7/2010]
(1) 
When the bituminous paving of a development is necessary prior to the completion of the construction activity and heavy hauling within the development, a two-phase paving operation may be utilized. The first phase of paving shall include the entire pavement section excluding the final wearing course. A construction seal, or one-half-inch scratch course, shall be applied at this time for the purposes of skid resistance. The design wearing course depth shall be applied at the time of the development’s substantial completion as determined by the Township Engineer in conjunction with the Township Manager.
(2) 
Prior to the final wearing course being applied, the existing surface shall be properly swept clean and a tack coat shall be applied. This operation shall be approved by the Township Engineer.
(3) 
When two-phase paving is utilized, decorative crosswalks shall not be construction until the time of final paving.
S. 
Curb Ramps (SD-10). Curb ramps shall be designed and constructed in accordance with the Accessibility Guidelines of the Americans with Disabilities Act. The location and design of all curb ramps shall be approved by the Engineer.
[Amended by Ord. 2010-403, 10/7/2010]
T. 
Paving Notch Detail (RD-08). New asphalt pavement shall meet existing asphalt pavement in accordance with the construction standard in RD-08, "Paving Notch Detail."
U. 
On-Street Parking.
[Added by Ord. 2010-403, 10/7/2010]
(1) 
In areas where on-street parking is permitted, the curbline shall be delineated to identify the following:
(a) 
Designated parking areas.
(b) 
Intersection no-parking areas. These areas shall be designated within 20 feet of any intersection. This shall be measured from the stop sign location of the intersection if present. If a stop sign is not present, this shall be measured as 30 feet from the gutterline of the intersecting street.
(c) 
Fire hydrant no-parking areas. These areas shall be designated 10 feet on either side of any fire hydrant.
(2) 
Proper delineation shall be attained by the use of signage or curb bulb-outs.
V. 
Fire Truck Turning Movement. All proposed developments shall be analyzed for the ingress, egress and regress of the Township’s largest fire vehicle. The turning movement analysis shall demonstrate that the fire vehicle can maneuver through the site to access all applicable structures. It is not permissible for the vehicle to track within 1.5 feet of parking stalls, curblines or median islands. The Township’s largest fire vehicle turning template can be found in Figure RD-28, Cranberry Fire Truck.
[Added by Ord. 2010-403, 10/7/2010]
W. 
Bicycle Facilities. All proposed bicycle facilities shall be constructed in accordance with the construction standards of RD-30, RD-31 or RD-32.
[Added by Ord. 2012-429, 6/7/2012, § 3]
3. 
Street Design Criteria.
A. 
All Street Classifications. Geometric design shall be in accordance with AASHTO Standards and Table 401.3.A unless otherwise approved by the Engineer.
Table 17-401.3.A
Street Design Standards
[Amended by Ord. 2006-372, 5/4/2006, § 6]
Type of Street
Collector Streets
Local Streets
Standard
Arterial RD-01
Commercial RD-02
Residential RD-03
Commercial RD-04
RD-06
RD-07
Residential RD-05
RD-26
RD-20, RD-21, RD-22, RD-23, RD-25
RD-24
Design Speed (mph)
50/60
40
40
30
30
30
20
Maximum grade
Per AASHTO standards
10%
10%
10%
12%
ITE NSDG
ITE NSDG
Minimum angle of Intersection
Per AASHTO standards
80°
80°
80°
75°
ITE NSDG
ITE NSDG
Minimum curb radius (feet)
Based on Township selected vehicle
20
ITE NSDG
ITE NSDG
Maximum grade break of approach to intersection for 25 feet
0%
0%
0%
0%
3%
3%
3%
Intersection sight distance
Per PennDOT Publication 70M
Horizontal radius minimum (feet)
PennDOT Publication 70M
PennDOT Publication 70M
PennDOT Publication 70M
PennDOT Publication 70M
PennDOT Publication 70M
ITE NSDG
ITE NSDG
Cross slope (%)
Per AASHTO standards
2% minimum; 6% maximum
2%
2%
ITE NSDG
ITE NSDG
Vertical curves
Per AASHTO standards
Horizontal reverse curves shall have a minimum tangent between them of (feet)
Per AASHTO standards
300
300
150
75
ITE NSDG
ITE NSDG
AASHTO – American Association of State Highway and Transportation Officials
ITE NSDG – Institute of Transportation Engineers Neighborhood Street Design Guidelines
(1) 
Clear Sight Triangle. No obstructions shall be located within the right-of-way or lot which obscure visibility at the intersection of two streets or of a street and a residential driveway. A clear sight triangle shall be maintained free of any obstructions. The sight distance shall be measured from a vehicle 10 feet back of the pavement edge of the intersecting street. The sides of the clear sight triangle shall be measured along the center line of the intersecting streets and shall meet the minimum standards shown in Table 17-401.3.A. The clear sight triangle shall be shown on the final plat for recording if it is beyond the boundary of the right-of-way.
[Amended by Ord. 2014-440, 1/30/2014]
(2) 
Minimum Sight Distance. When a new street intersects an existing street, the minimum sight distance at the intersection shall be provided in accordance with the requirements of Table 17-401.3.A.
(3) 
Roadway Design Specification. The minimum allowable street grade shall be 1%. The maximum allowable street grade shall be 12%. The minimum allowable length of vertical curve shall be determined by the guidelines set forth in the American Association of State Highway and Transportation Officials (AASHTO) publication, A Policy on Geometric Design of Highways and Streets (Green Book), most recent publication.
[Amended by Ord. 2006-372, 5/4/2006, § 6]
B. 
Local Residential (RD-16A, RD-16B) and Commercial Culs-de-sac (RD-17). Culs-de-Sac shall meet the minimum standards shown in RD-16, RD-16A, RD-16B and RD-17, Typical and Offset Cul-de-Sac Details, and the Township Subdivision and Land Development Ordinance [Chapter 22]. A cul-de-sac street shall be designed as the appropriate street for the stem and the bulb shall be designed as RD-16, or RD-17, as appropriate.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
C. 
Barricade for Dead End Streets (RD-12). A barricade for dead end streets meeting the standard in RD-12, Barricade Detail for Dead End Roads, shall be provided by the developer when required by the Engineer.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
D. 
Pavement Markings. All stop bars, transverse markings and crosswalks shall be cold plastic. All longitude lines shall be Traffic Zone Paint, Type II Waterborne.
[1]
Editor’s Note: Former § 17-402, Stormwater Management, adopted 9/5/1996 by Ord. 96-273, as amended, was repealed 5/5/2011 by Ord. 2011-415, § 2. For current provisions, see Part 3, Stormwater Management Regulations.
[Ord. 96-273, 9/5/1996; as amended by Ord. 2003-339, 4/1/2003, § 4; and by Ord. 2005-362, 12/15/2005]
1. 
General Requirements.
A. 
Introduction.
(1) 
These specifications cover the requirements construction of all of the Township's water and sewer line facilities. These specifications are intended for and apply to all such projects whether directly constructed by (a) contractor(s) under contract the Township, or constructed by a land developer who in turn employs a construction contractor(s).
(2) 
Where the term "Township" is used herein, it shall mean the Municipal Sewer and Water Authority of Cranberry Township, its employees, management, or Board, as is appropriate for each occurrence of use of the term. When necessary or the Township may call upon its engineering and/or legal consultants for advice and direction.
B. 
Inspection of Construction Work.
(1) 
All work performed in connection with the extension modification or improvement of public water or wastewater facilities within the Township shall be required to conform with all Township rules and regulations and shall be inspected during construction by an authorized representative of the Township.
(2) 
All completed work shall be required to meet the approval of the Township and shall be changed, modified, replaced, removed or otherwise corrected by the contractor to such extent as directed by the Township.
(3) 
The work will be periodically or continuously inspected during its progress and when completed, shall be in inspected jointly, by the Township and the contractor.
(4) 
The contractor shall keep on site, and make available upon request by the Township, a surveyor's rod and level for the purpose of spot checking elevations as the work progresses.
(5) 
The contractor shall also keep and make available a 300 feet surveyors tape for the purpose of spot checking distances and for the purpose of the contractor providing off-set measurements as the work progresses.
C. 
Rights-of-Way.
(1) 
The alignments and locations of the proposed pipe lines and appurtenances are shown on the plans on which street, highway and/or other acquired rights-of-way limits have also been superimposed. No pipe line shall be relocated outside of the street or other right-of-way within which it is shown without obtaining the formal written approval for such chance from the Township.
(2) 
Where a special pipe line right-of-way is obtained through private property, the minimum permanent width for operation and maintenance purposes shall be 20 feet; the width of the temporary right-of-way obtained through such private properties for initial pipe line installation and construction purposes shall be 40 feet, 10 feet of which shall be located adjacent to and on the outside of both limits of the permanent right-of-way. The minimum distance between the center of any longitudinal pipe line and the right-of-way limit line shall be five feet. All construction activities shall be confined within the 40 feet wide construction right-of-way as much as possible.
(3) 
The contractor shall, however, make his own arrangements for office space, materials storage yards, change trailers, sanitary facilities, utility services, debris disposal sites, and for ingress and egress to any location along the pipe line project for which the contractor desires or requires use and, for which the Township has been granted no such right-of-way.
(4) 
Proposed pipe lines and appurtenances may also encroach upon, right-of-way occupied by pipelines or other facilities owned, operated and/or maintained by other utility companies and/or governmental agencies. It shall be the responsibility of the contractor to notify the appropriate representatives of those agencies in advance of performing any work therein and, to conduct all construction activities in accordance with the respective regulations appertaining thereto. The contractor shall utilize the PA One Call System as required by law. The PA One Call telephone number is 1-800-242-1776.
(5) 
The position of water and sewer lines proposed to be constructed in connection with land development projects shall be such that, regardless of the sequencing of various utility line construction gas, power, telephone, water, storm sewer, sanitary sewers, etc. no pipe line shall be aligned longitudinally, along either the water or sanitary sewer lines, any closer than three feet. It is imperative that such minimum distance be maintained along all sanitary sewer and water lines to provide space required for future maintenance and/or repairs.
(6) 
The separation between sanitary sewer and waterline pipe(s) shall be in accordance with the regulations of the Pennsylvania Department of Protection, in accordance with Detail Drawing SW-5.
D. 
Control of Pipe Line Elevations and Alignments.
(1) 
The contractor shall confirm the elevation of all existing facilities to which proposed facilities will connect, as well as the profile of the existing and/or finished (in the case of land development projects) ground lines, prior to commencement of construction, to confirm compatibility.
(2) 
All sewer lines shall be required to be constructed and the elevations and alignment shall be controlled by the use of laser equipment. Sewer line construction shall begin at the manhole with the lowest invert elevation unless prior approval is granted by the Township. Water lines shall be installed on uniform slopes as indicated on the profiles to assure that the air release valves (where indicated) will function effectively. Similarly, such grade controls of waterlines shall also be implemented to assure that blow-off assemblies are properly located.
(3) 
The contractor shall employ competent field survey personnel as may be required to control grades and/or alignment of proposed facilities and to assist the Township by obtaining information during construction progress, and for purposes of preparing as-built record drawings.
E. 
Traffic Warning Signs, Barricades, Lights and Control.
(1) 
Where pipe lines and/or other facilities are constructed along State Highways and/or Township Streets, and where construction activities may otherwise impede normal vehicular traffic patterns on said highways or streets, the control of traffic shall be accomplished in accordance with the details set forth in Publication 203 of the Pennsylvania Department of Transportation, the title of which is "Work Zone Traffic Control."
(2) 
The position of work zone signs, erection of signs, sizes of signs, details and configuration of signs, traffic channelizing, tapered lengths/spacing, cones, drums, vertical panels, lighting devices, arrow boards and all flagging conduct and activities shall conform to the details described therein. The location and configuration of traffic control methods shall conform to those graphically illustrated on the appertaining Table 5 and Figures 5 through 23 shown in the publication. The contractor shall submit a traffic control plan and procedure (conforming to the above referenced Publication 203) to the Township for approval, prior to commencing with field construction.
F. 
Exploratory Excavations.
(1) 
Some of the proposed pipe lines and appurtenant structures are somewhat flexible with respect to alignment. Therefore, in those existing streets, roadways, berms or other areas expected to have a number of underground utility lines, where there are large trees which may be saved by realignment, and where the Township so directs, the contractor shall make appropriate exploratory excavations for the purpose of locating said lines.
(2) 
In all instances, the costs associated with exploratory excavations shall be the responsibility of the contractor, and any realignment of pipelines shall be approved by the Township.
G. 
Existing Utility Lines — Location, Protection and Hazards.
(1) 
The plans show those underground water lines, gas lines, electric lines, cable TV lines, telephone lines, sanitary sewers, storm drains, conduits and other similar utility lines and appurtenances for which said location information was either made available to the designer, or was observed in the field. Neither the number of such underground facilities nor their respective types, sizes and/or locations can be assured or guaranteed and it is therefore, the responsibility of the contractor to obtain such additional information; as is required to properly complete the work in compliance with the specifications, and to contact the owners of the various utilities in the area prior to starting and during performance of the work accordance with 73 P.S. § 180.
(2) 
The approximate location of any power and telephone poles and guy poles along the route of the work is shown on the drawings and the overhead lines supported by all such poles shall be observed and located by the contractor prior to commencement of the work.
(3) 
The contractor shall be completely and solely responsible for any and all property damages, bodily injuries financial losses and interruption of service that results from or are attributable to his construction activities and, which affect water lines, gas lines, electric lines, telephone lines, drain lines, sanitary and storm sewer lines and all appurtenances and service facilities connected thereto. Restoration of all such disturbed facilities shall be accomplished immediately after incurrence thereto.
(4) 
Water, sewer, gas, power and telephone service to dwellings or places of business shall be maintained with a minimum of interruption throughout the construction of the contract work. No such service shall be intentionally interrupted without the approval of the respective utility company concerned, and without first giving due warning to the occupants of said dwelling or business establishment. At least three working days notice of an interruption in service shall be given to the Township so that the Township may notify its customers.
(5) 
In some areas, it may be found that existing pipe lines are in a location where construction of the proposed work cannot reasonably proceed until the utility has been relocated. The contractor shall make all necessary subsurfaces investigations and shall locate such utility mains far enough in advance of the trenching work so that work progress is not unnecessarily interrupted.
(6) 
Attention is directed to the fact that the proposed work could be in close proximity to overhead power lines which transmit electric current at high voltages and which, if disturbed or contacted during construction, would be hazardous to construction personnel and/or other persons. The contractor shall, therefore, properly protect such wires, pole supports or other power line appurtenances to avoid disturbance to those facilities, and shall operate all machinery and conduct all other construction activities in a manner which will assure protection of all construction personnel and other persons against said hazards.
(7) 
Work in the vicinity of the existing underground gas lines and appurtenances is also hazardous because under certain conditions, such materials are flammable and/or explosive and, the contractor shall avoid all temporary and permanent supports and other required protection to prevent exposure of the same to construction personnel and/or other persons. Where such lines are exposed during construction and leakage is detected, construction work in those areas shall be immediately suspended, the owner of the pipe lines shall be immediately advised of the condition and the construction work shall not resume until all repairs have been properly completed.
(8) 
The construction activities required to be performed in the conduct of the work may necessitate the interconnection, interception, surveying, inspection, removal, replacement and repair of certain existing manholes, sewer pipes and appurtenances. Said items are conveying all wastes and runoff discharged to and infiltrating into the public sewer system within the area served, which wastes may contain and/or generate toxic, noxious oxygen depleting or other liquid or gaseous substances harmful to human beings.
(9) 
The contractor shall also provide all personnel with all tools, clothing and other devices necessary for such safe practice, including appropriate waterproof clothing, respirators, protective glasses, mechanical air blowing equipment to pre-ventilate manholes and other chambers, explosive atmosphere detectors, ladders, safety harnesses, etc. No work shall be performed under any unsafe conditions and if same is detected at any time, the contractor shall, therefore, thoroughly instruct all personnel involved in such work so that appropriate and complete safety practices are observed at all times.
2. 
General Notes.
A. 
Shop Drawings.
(1) 
Prior to delivery to the job site, the contractor shall supply to the Township four copies of shop drawing details of all pipe and appurtenances including, but not limited to: pipe, valves, fittings, hydrants, brass, boxes, manholes, frames and castings, steps, coatings, etc.
(2) 
Each shop drawing shall be stamped by the contractor and the supplier. The supplier shall be an approved distributor of the manufactured product and shall state as such on the submittal.
(3) 
No materials shall be incorporated in any sewer or water lines or appurtenances which have not received prior approval.
(4) 
The Township will review, make corrections on, reject and/or approve submitted shop drawings and will return two copies to the contractor. Resubmittal shall be made by the contractor as required to obtain approval prior to installation of the material.
B. 
Preconstruction Photos. Prior to any mobilization, one set of photos of all proposed off-site construction shall be submitted to the Township. The photos shall be indexed with a date and location and in binder format.
C. 
Restoration.
(1) 
The contractor shall have no more than 1,000 lineal feet of disturbed trench at one time.
(2) 
All areas which are disturbed by construction operations, including equipment and materials storage, and which are not occupied by pavement or permanent structures shall be seeded with grass seed or crown vetch, when slopes are greater than 3:1.
(3) 
In lawns, gardens and in other improved areas (except for streets, roadways and traveled ways), the top of the backfill material shall be placed to an elevation approximately six inches below the finished ground surface. The top six inches shall be topsoil that has been screened of impurities prior to spreading. All excavated areas and other areas where construction equipment and activities impose damage to ground surfaces shall receive six inches of screened topsoil.
(4) 
After the topsoil has been spread, all lawns shall be restored by raking the area disturbed by construction. An application of an approved fertilizer at a rate of 50 pounds per 1,000 square feet shall be made. Said area then shall be completed with peat moss, mushroom manure or other approved grass seed shall be sown. The contractor shall be responsible for restoration of all settlements and for properly preparing the topsoil, applying fertilizer and mulch and planting the seed, but will not be responsible to water those restored areas.
(5) 
All shrubbery which is removed temporarily to accommodate construction, shall be promptly replaced after backfilling is completed and shall be fertilized and otherwise treated to insure restoration to a condition existing prior to construction.
(6) 
Shrubbery which is not successfully removed and replaced, shall be placed by the contractor for the period of 18 month maintenance bond.
(7) 
The contractor shall furnish nursery-grown stock. The plant shall be replaced in kind unless directed otherwise by the Township. All plantings which have died or which do not exhibit a healthy and vigorous growth shall be replaced by the contractor.
(8) 
Any surface irregularities shall be corrected to prevent formation of low places where surface water may pool.
D. 
Seed Mixture.
(1) 
Temporary Cover. Seed mixture for temporary cover shall consist of 100% annual rye grass. Seed shall be applied at the rate of 10 pounds per 1,000 square yards unless noted otherwise.
(2) 
Permanent Cover (Mowed Areas). Seed mixture for permanent grass cover shall consist of the following: perennial rye grass mixture (20% by weight), creeping red fescue (30% by weight) and Kentucky bluegrass mixture (50% by weight). Seed shall be applied at a rate of 21 pounds per 1,000 square yards.
(3) 
Permanent Cover (Non-mowed Areas). Seed mixture for permanent grass cover shall consist of the following: tall fescue (70% by weight), birdsfoot trefoil mixture (1/2 viking and 1/2 empire, norcen or leo, 20% by weight) and redtop (10% by weight). Seed shall be applied at a rate of 10.5 pounds per 1,000 square yards.
E. 
Tunneling, Boring and Jacking.
(1) 
The contractor shall comply with all applicable Federal, State and Township ordinances, codes, statutes, rules and regulations and affected jurisdictional bodies. For State highway areas, the contractor shall comply with Pennsylvania Department of Transportation Publication 408 Specifications.
(2) 
Regardless of whether tunneling, jacking or boring is employed, the contractor shall be responsible for construction of the various pipe lines, true to line and grade, and shall be held fully responsible for protection against surface subsidence, damages or disturbances to the satisfaction of the Township.
(3) 
The contractor shall be responsible for reimbursing all agencies owning property where boring, jacking or tunneling is required for any inspection and/or flagmen costs incurred and deemed necessary by those agencies at any and all locations where work is performed, to ensure safe traffic conditions and safe conduct of work.
(4) 
All sheeting, shoring, bracing, lining, etc., required for the construction of tunnels, shafts, portals, etc., shall be furnished and installed by the contractor. All work relative to the installation of liners and carrier pipes by means of jacking, boring or tunneling shall be performed in accordance with regulation set forth under Subpart S, Tunnels and Shafts, Caissons, Cofferdams and Compressed Air published as a part of the Safety and Health Regulations for Construction by the U.S. Department of Labor.
(5) 
Where tunneling is employed, the tunnel line plate shall be designed by the contractor for the particular diameter or shape elected. The plate shall be designed and assembled in accordance with the manufacturer's published recommendations for the material encountered in the tunnel excavation.
(6) 
Tunnels shall be carefully excavated by experienced tunnel workers and shall be trimmed to such a size and shape as to allow the proper placing on the pipe lines to the proper alignment and grade. Caution shall be exercised in excavating tunnels so that voids outside the casing and disturbance of the surrounding material are kept to a minimum. Large voids are to be filled immediately with grout.
(7) 
The contractor shall excavate the tunnel and support the surrounding earth so that no movement of the earth over or adjacent to the work shall occur at any time. If, due to unforeseen conditions or otherwise, any such movement does occur, the Township may order the contractor to stop any and all work except that which assists in making the tunnel secure and in preventing further movement of the ground over or adjacent to the work.
(8) 
Where boring and jacking is employed, the casing pipe shall at all times follow behind the boring auger at a distance no greater than two feet. The method of auguring the entire hole and then pushing the pipe will not be permitted.
(9) 
Steel casing pipe shall be new, shall be visibly sound and round, and shall be suitable for the service intended. All joints shall be of metal and of leakproof construction, designed to carry the earth load and any other pressures present. It shall be welded steel pipe (full circumference welded joints) manufactured and tested in accordance with the industry wide accepted ASTMS and standards. The steel pipe shall have a minimum yield strength of 35,000 psi.
(10) 
Minimum casing wall thickness shall be as follows:
Nominal Diameter of Casing
Uncoated and Unprotected
(inches)
Pipe in Inches
0.250
10 and under
0.250
12 and 14
0.312
16
0.312
18
0.344
20 and 22
0.375
24
0.406
26
0.438
28
0.469
30
0.500
32
0.532
34 and 36
(11) 
The carrier pipe shall be adequately supported with stainless steel casing spacers or approved equivalent. There shall be a maximum of six feet of separation between casing spacers. Treated wood skids are not permitted.
(12) 
All boring and jacking shall be unclassified and not extra payment will be made for rock, boulders, shale, timber, logs, old foundations, masonry or other natural or artificial materials encountered in the boring and/or jacking operations.
(13) 
When boring is employed, the contractor shall be responsible for construction of the various crossings true to line and grade and shall be held fully responsible for protecting against surface subsidence damages or disturbances to adjacent property and facilities from his construction operation and shall rectify to the satisfaction of the Township.
(14) 
Should an obstruction or misalignment be encountered during any boring or jacking so as to prevent continuation of operations, the auger shall be removed and any excess pipe cut and capped. The casing interior and any void spaces outside of the casing shall be pressure grouted, with a Township approved grout, completely to fill all voids before establishing a new boring or jacking site.
F. 
Open Excavation and Backfill.
(1) 
All excavation shall be unclassified and the Township shall make no extra payment for hand excavation or for the removal of any rock, boulders, stumps, tree roots, shale, muck, masonry, curbing, paving or other natural or man-made materials.
(2) 
The limit of daily trench excavation shall be to a length of pipe placement and backfilling that can be completed the same day.
(3) 
All ductile iron pipe and reinforced concrete pipe may be installed directly on exposed trench bottoms, where no rock or other unyielding material or where so soft unstable conditions exist.
(4) 
Where the exposed trench bottom consists of rock or other unyielding material, the trench shall be undercut a minimum of four inches and the ductile iron or reinforced concrete pipe shall be installed on six inches on a Township approved bedding material and at no additional expense to the Township.
(5) 
When soft and/or unstable trench bottoms exist, the trench shall be undercut and stabilized to the satisfaction of the Township. Trench bottoms shall be undercut at joints where pipe bells will occur to assure that all pipe barrels are continuously supported for the entire barrel length. If this method does not provide adequate pipe support, as determined by the Township, concrete caissons shall be installed as required at no additional expense to the Township.
(6) 
All polyvinyl chloride pipe (PVC) shall, regardless of the character of the exposed bottom, be installed on Township approved bedding material of at least six inches. At the determination of the Township, any of the above methods for ductile iron or reinforced concrete pipe shall apply to PVC pipe at no additional expense to the Township.
(7) 
The excavation material from the trench may be temporarily stored along its alignment on right-of-ways obtained for construction purposes. It may not, however, prohibit traffic flows along the streets and roadways, access to private properties, or access to existing utility lines by the respective utility companies. The excavated material shall not obstruct or alter the flow of surface water runoff to drainage facilities and ditches.
(8) 
Along all pipelines, the backfill material placed above the pipe zone shall be selected excavated material which shall be compacted and placed in such a manner to avoid disturbance or displacement of the pipe and other appurtenances. The backfill material shall be free of bricks, concrete, trees, stumps, frozen or mucky material, excessive amounts of rocks and other debris, and shall be mechanically compacted.
(9) 
Backfill material placed in trenches are located in an improved area, shall be 100% stone backfill. Improved areas are traveled ways, road shoulders and berms. The 100% stone backfill shall be placed in lifts not exceeding eight inches in thickness and shall be thoroughly and mechanically compacted for the full depth of the trench.
(10) 
When the trench excavation is being backfilled, the disturbed area shall be graded to final contours and appropriate temporary erosion and sediment pollution control measures/facilities shall be installed.
(11) 
All excess excavated material resulting from the construction of the pipelines and appurtenances shall be disposed at a location and in a manner determined by the contractor and at no additional expense to the Township.
(12) 
The contractor shall schedule construction activities and provide all required equipment, steel plates, cones, barricades and personnel such that the backfilling of the trenches located along or crossing streets, street berms, roadways, driveways or other traveled ways results in resumption of normal traffic patterns immediately.
G. 
Compaction Testing.
(1) 
The contractor is informed that in those areas where the excavated material is utilized as backfill, the backfill shall achieve a density of 95% as determined by the Standard Method A, Proctor Test.
(2) 
Tests will be performed in any area determined necessary by the Township. In the event that the placed backfill does not comply with the 95% density requirement, the work shall be re-excavated, re-compacted and retested at no additional expense to the Township.
H. 
Site-Safety.
(1) 
Safety of the construction site shall be the sole responsibility of the contractor.
(2) 
All structure excavations and open trenches shall be constructed in accordance with the rules and regulations set forth by the Occupational Safety and Health Administration and the U.S. Department of Labor. Methods of installation shall be compatible with assuring the protection against disturbance and other personnel in accordance with the above-referenced agencies.
(3) 
Trenches at any and all locations where pedestrian or vehicular traffic hazards would result, shall not be left open during non-construction hours, unless they are suitably covered with a steel plate which is adequately anchored and reinforced to sustain pedestrian and/or vehicular traffic loads which may be imposed. All excavations within road right-of-ways shall be closed over night and over weekends and marked with flashing traffic markers.
I. 
Blasting. All blasting shall be performed in accordance with all applicable Federal, State and Local laws, rules and regulations regarding registration, transportation, storage, handling and otherwise using explosives. Blasting permits are required to be obtained in advance from the Township.
3. 
Site Work and Preparation.
A. 
Clearing and Grubbing.
(1) 
Certain work to be performed will require clearing. The contractor shall cut, clear and remove all brush, sapling, scrub and other wild growth along the route of the pipe lines. No trees shall be cut, however, without the specific approval and prior designation for cutting, by the Township. It is the intent of these specifications to minimize the removal of trees and, therefore, only those which will positively prevent the application of reasonable construction methods and procedures will be permitted to be removed.
(2) 
Brush, scrub growth, stumps, saplings and tree limbs and trunks so directed to be cut and removed, shall be placed into piles and shall be burned or otherwise destroyed or completely removed from the site of the work. No such debris shall be included in any backfill and as part of the clean-up work shall be required to be removed and transported away from the site.
B. 
Bedding and Specially Graded Backfill Material.
(1) 
All pipe line bedding material, all material placed within the pipe zone of trenches in which PVC pipe is constructed and, all material placed above the trench bottom and below the concrete trench slab (where trenches cross or are located within Township streets or State roads; shall be either pea gravel, two limestone or two gravel, complying with the gradation and classification of the Pennsylvania Department of Transportation.
C. 
Dewatering.
(1) 
All excavation shall be dewatered thoroughly in advance of the installation of any of the construction work; no facilities shall be constructed in any excavation where water flows or is pooled, or where groundwater infiltration or surface water inflow is not immediately removed.
(2) 
Water which accumulates in the open trench shall be completely removed by pumping before pipe placement and or backfilling begins.
(3) 
Where dewatering does occur, the contractor shall conduct those operations in a manner which complies with regulations on the subject of Soil Erosion and Sedimentation Control as promulgated by the Pennsylvania Department of Environmental Protection. No such discharges shall be permitted to erode or otherwise adversely effect any public or private property and all such discharges shall be trapped, settled, rough-filtered, retained and/or checked (depending upon the clarity, turbidity, and concentration of suspended solids) within such discharges allowable.
D. 
Dust and Mud Control on Streets and Other Traveled Ways.
(1) 
Dust control palliatives shall be utilized where and when necessary to satisfactorily maintain roads, streets, berms and other traveled ways for vehicular traffic. In addition, the accumulation of mud and/or dirt from the excavation, backfill and trenching operations shall be cleaned off the surfaces to properly maintain the roadway in a condition satisfactory to the Township.
E. 
Stream Crossing.
(1) 
Where sanitary sewer or water distribution system pipe lines cross creeks or streams, such crossing shall be accomplished by using ductile iron pipe or PVC encased in a minimum of six inches of concrete all around the pipe, and fittings conforming to the requirements of the appertaining sections of these specifications.
(2) 
The pipe shall be tied to eight inches concrete blocks laid on the trench bottom and shall be encased in concrete all around the pipe. The concrete encasement shall be at least six inches thick. The minimum depths of pipe, that is, the vertical distance between the lowest elevation of the stream along the pipe alignment and the top of the pipe, shall be three feet. Where rock is encountered within the trench bottom, bedding material (as also specified herein) shall be utilized.
(3) 
The concrete encasement of the pipe shall extend between the tops of the stream on creek banks, or where such banks are not evident, a minimum distance of five feet each side beyond the normal stream channel.
(4) 
Water line stream crossings shall extend from valve manhole to valve manhole or valve and box. It may be required that valve manholes be installed on each side of the stream crossing.
(5) 
Backfill around the stream crossing shall consist of the excavated material unless the same is deemed unsuitable by the Township at the time of excavation.
(6) 
Disturbed bank areas shall be stabilized immediately upon completion of the crossing.
(7) 
As shown on the construction drawings, riprap shall be installed to prevent erosion of the slopes, stone shall be minimum of 35 pounds durable rock, dumped or hand placed to a minimum depth of 10 inches. Installation of riprap- shall be per PaDEP requirements and regulations.
4. 
Materials and Installation.
A. 
Sewer Pipe General.
(1) 
All pipe shall be transported, unloaded, handled, and installed in strict accordance with the recommendations of the pipe manufacturer.
(2) 
All nonresidential sanitary sewer laterals shall be a minimum of six inches in diameter and shall tie directly into a sanitary manhole. Wye connection(s) shall not be acceptable on nonresidential connections. Residential connection(s) may either four inches or six inches in diameter and may tie into a manhole or wye connection.
(3) 
Four inch diameter sewer lateral shall be installed at a minimum of 1/4 inch of fall per foot.
(4) 
Six inch diameter and larger laterals shall be at a minimum of 1/8 inch of fall per foot.
B. 
Sewer Pipe and Fittings.
(1) 
Scope. This specification designates the general requirement for unplasticized polyvinyl chloride (PVC) plastic pipe with integral bell and spigot joints for the conveyance of domestic sewage. The bell consists of an integral wall section with a factory installed, solid cross section elastomeric ring that allows for expansion and contraction at each joint. PVC sewer pipe shall be supplied in minimum of 12.5 foot lengths except where connections to manholes or main line wye branches are to be made.
(2) 
Pipe.
(a) 
All gravity sanitary sewer pipe shall meet the requirements of ASTM D3034, SDR-35 for pipe sizes four inches in diameter through 15 inches in diameter and less than 20 feet in depth.
(b) 
For gravity sanitary sewer pipe for 18 inches in diameter through 27 inches in diameter and less than 20 feet in depth, the pipe shall meet the requirements of ASTM F679.
(c) 
For gravity sanitary sewer pipe larger than 27 inches in diameter and less than 20 feet in depth, the pipe shall be large diameter polyvinyl chloride (PVC) pipe and shall meet the requirements of ASTM F794.
(d) 
The low pressure sanitary sewer pipe installed from a grinder pump to a manhole or low pressure force main, shall be SDR-21 and meet the requirements of ASTM D2241 with a pipe designation of RT 200. Type 21 Ball Valves shall be used in conjunction with low pressure sanitary sewers.
(e) 
Sanitary sewer pipe force main pipe shall be ductile iron pipe and shall meet the requirements of special thickness class 52, double cement lined.
(f) 
For sanitary sewer pipe that is 20 feet in depth, measured from the finish top of ground grade to the top of the pipe, shall be ductile iron pipe, special thickness class 52, double cement lined or heavy wall sanitary sewer pipe SDR-26. The pipe and fittings shall meet ASTM D3034 and ASTM F1336.
(g) 
Wye connections shall be in accordance with standard Detail SW-30.
(h) 
Detectable Mylar Marking Tape. A detectable mylar marking tape shall be installed over all sewer lines by the contractor. It shall be inductively locatable and conductively traceable using standard pipe and/or cable locating devices. Care will be taken to insure that the buried marking tape is Mylar encased aluminum foil. The detectable marking tape will bear the words "CAUTION-SEWER LINE BURIED BELOW.". The printing will be under Mylar so as to be readable through the clear Mylar. Maximum spacing between the continuous warning message shall be 16 inch — 36 inch. The tape shall be highly visible color and the tape will be color coded in accordance with the American Public Works Association and Utility Location Coordination Council Standards and will be minimum three inches in width. The detectable marking tape will be buried one to two feet below finish grade as is practical for optimum delectability. The tape should be placed into backfill and allowed to settle into place in the backfill. The tape shall be specially designed for prolonged underground use and shall be easily detectable with an electronic locator.
(3) 
Gaskets. Joints shall be flexible elastomeric gasket type conforming to ASTM D3212, Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals. Gasket material shall conform to ASTM F477, Specification for Elastomeric Seals (gaskets) for Joining Plastic Pipe.
C. 
Assembly of Sanitary Sewer Pipe.
(1) 
Pipe joints shall be carefully lowered into the excavated trenches to avoid damage to the bell and spigot ends. All rubber gaskets shall be examined to assure that there is no apparent damage during handling and shipment.
(2) 
Both the bell and spigot ends shall be wiped clean and then lubricated by an application of a suitable grease like product which will not adversely affect either the gasket or the pipe wall. The entire circumference of the spigot shall be coated and the lubricated spigot shall be inserted into the bell.
(3) 
Installation of plastic pipe shall be in conformance with ASTM D2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications.
D. 
Sanitary Sewer Manholes.
(1) 
All sanitary sewer manholes shall be fabricated of precast concrete in accordance with the requirements of ASTM C478, Precast reinforced Concrete Manhole Sections. The base section(s) shall be the extended-base type, mono-bottom base sections shall not be accepted.
(2) 
The base slab section shall be installed on a minimum of twelve-inch thick subbase of AASHTO No. 57 compacted crushed stone. Prior to installing the subbase stone, the excavated subbase area below the manhole shall be thoroughly and evenly compacted. All sections of the manhole shall be precast, the use of a cast in-place base over an existing sanitary sewer line is not acceptable.
[Amended by Ord. 2006-372, 5/4/2006, § 8]
(3) 
The exterior wall of the manhole shall be sealed with an asphaltic compound such as a foundation sealer or other material(s) suitable for this type of application per the requirements of Pennsylvania Department of Environmental Protection. The manhole(s) shall be seal coated by the manhole manufacturer at the manufacturer's plant and not at the construction site. Manholes four feet in diameter shall have walls at least five inches thick. Manholes five feet in diameter shall have walls at least six inches thick.
(4) 
Joints at the bottom of the pre-cast manhole barrel where connection is made with the pre-cast base section shall be made to produce a watertight installation. The manhole barrel sections shall be sealed with a flexible butyl rubber manhole joint sealant meeting Federal Specification SS-S-00210(210-A) and AASHTO M198, minimum three-fourths-inch thickness, as manufactured by Concrete Sealents, Inc. or approved equal, and shall be installed at the time of the installation of the manhole. Two rings of the material shall be installed, one on the inside of the joint in the groove and the other in the outside of the tongue.
(5) 
A flexible manhole sleeve shall be installed in the precast base or riser section by the manhole manufacturer for a watertight installation. The flexible watertight sleeve shall be set a minimum of four inches above the manhole floor. The influent and effluent flexible sleeves shall be set at elevation, which will maintain a minimum uniform grade through the manhole, equal to the grade of the sewers upstream or downstream of the respective manholes. The resilient connectors shall conform to the requirements of ASTM C923, Resilient Connector Between Reinforced Concrete Manhole Structures and Pipes. When core drilling and connecting to an existing manhole, a PSX:NYLO drive boot shall be utilized.
[Amended by Ord. 2014-440, 1/30/2014]
(6) 
The contractor shall continuously check for vertical alignment such that the completed manhole is set true to grade and plumb to within one inch tolerance. If this tolerance is not met, the manholes shall be removed and reset.
(7) 
All concrete utilized for bench and invert areas shall be high early strength class concrete. Carefully form all full pipe depth channels and bench areas in manhole bottoms such that the least amount of turbulence will be caused in the sewage flow. All channels shall be steel trowel finished. All bench areas shall be sloped at 1/2 inch per foot from the inside wall of the manhole to the edge of the full pipe flow channel.
(8) 
All of the manhole sections shall be handled according to the manufacturer's recommendations so as to avoid chipping, cracking, or breaking. Any section damaged in transporting, handling, or installation shall be replaced by the contractor.
(9) 
Manhole eccentric cone sections, precast base sections, flat top sections, and barrel sections shall not have more than two lifting holes per section for handling and installation purposes. After installation, the holes shall be sealed and made watertight. The lifting rings/loops shall be removed after installation.
(10) 
Grade adjustments shall be accomplished with maximum one foot high precast concrete rings and/or cast iron pavings rings. The use of brick for grade adjustments is not acceptable.
(11) 
Manholes where the largest connecting sanitary sewer is 18 inches in diameter or less shall have a four-foot diameter barrel manhole. Where any connecting sewer exceeds 18 inches in diameter, the manhole barrel sections shall be five feet in diameter.
(12) 
Wherever sanitary sewers enter manholes such that the influent invert(s) are 24 inches or greater above the effluent invert, drop connections shall be required. Inside drop connections are not acceptable on manhole(s) with a barrel diameter of four feet, an outside drop shall be installed. Inside drop manholes shall only be permitted on manholes with a barrel diameter of five feet, outside drop connections are also acceptable on five-foot barrel diameter manhole(s).
(13) 
Drop connections shall not be permitted on sanitary sewer pipe(s) greater than or equal to 15 inches in diameter.
(14) 
If an inside drop is installed, the drop pipe shall be secured with stainless steel straps.
(15) 
Wherever sanitary sewers enter manholes such that the influent invert(s) are less than 24 but more than three inches above the effluent invert, a channeled concrete fillet shall be constructed to prevent the flow from splashing into the manhole. The channeled concrete fillet shall be troweled finished.
(16) 
Sanitary sewer manhole(s) shall be in accordance with standard Detail SW-7, SW-8, SW-9, or SW-10.
E. 
Frames and Covers.
(1) 
Frames and covers for all standard manholes shall be heavy duty fabricated of cast iron, and be of uniform quality, free of bubbles and other sand or air imperfections. All castings shall be designated for H-20 highway loading as designated by AASHTO Standards. Materials used in the manufacture of castings shall conform to ASTM A48 of latest revision, Class 30 or better. All frames and covers shall have machined bearing surfaces to prevent rocking and rattling in any direction or orientation.
(2) 
Where noted on the drawings or directed by the Township, a special watertight frame and cover shall be installed.
(3) 
The final setting of the manhole casting(s) shall be such that they conform with the existing ground slopes and contours so that the surrounding area is mow-able without any interference of the frame and cover.
(4) 
Where manholes are located along creeks or low areas subject to flooding and in areas where they are subject to being covered, the top elevation shall be set above ground as determined by the Township. Sanitary sewer line delineators shall be installed as requested by the Township in areas where the top elevation of the manhole is set above ground.
(5) 
On each manhole, two complete rings of flexible butyl rubber manhole joint sealant, minimum three-fourths-inch thickness, meeting Federal Specification SS-S-00210(210-A) and AASHTO M198 shall be installed between the bottom of the frame and the top of the concrete manhole.
(6) 
Four 3/4 inch stainless steel anchor bolts shall be installed on all manhole frames. Anchor bolts shall have a minimum embedment of four inches with plastic inserts or six inches with epoxy grouted holes.
(7) 
Frames and covers shall be coated with a corrosion resistant bitumastic material.
(8) 
The sanitary manhole covers shall be inscribed with "Cranberry Twp. Sanitary."
[Amended by Ord. 2006-372, 5/4/2006, § 8]
(9) 
The frames and covers shall be:
(a) 
Neenah R1753-A
(b) 
East Jordan 1890
(c) 
Or approved equal
(10) 
The frame(s) and cover(s) shall be in accordance with standard Detail SW-12.
F. 
Manhole Inserts.
(1) 
All manholes, except those designated as watertight, shall be furnished with manholes inserts or inflow protectors which shall be fabricated to fit the specified frames and covers and for use in the collection system. The dimensions shall allow for easy installation within the manhole frame.
(2) 
The manhole insert shall be manufactured from ABS material that meets the specifications of ASTM D4673.
(3) 
The pre-molded thickness of the insert shall be no less than 1/8 inch or greater than 3/16 inch. The inserts shall not be more than six-inch deep with a minimum lip size of one inch.
(4) 
The manhole rim shall be cleaned of all dirt and debris before placing the insert upon the rim. The insert shall be fully seated around the rim of the manhole frame.
(5) 
The insert shall have two corrosion resistant lifting lugs molded into the insert for easy removal and reinstallation. The lifting lugs shall be located at 180° apart and shall be functional with a standard J hook.
(6) 
The insert shall have a closed cell neoprene gasket with adhesive backing.
(7) 
The insert shall be:
(a) 
Man-Pan Manhole Insert as manufactured by Advanced Inflow Protection.[1]
[1]
Editor's Note: Amended at time of readoption of Code.
(b) 
Or approved equal.
(8) 
The insert shall be in accordance with standard Detail SW-11.
G. 
Manhole Steps.
(1) 
The step shall be fabricated of a minimum of 1/2 inch round grade 60 steel step encapsulated with a copolymer polypropylene plastic. The steps shall have a flat serrated tread with end lugs to prevent feet from slipping off and be of a size and shape as detailed on the standard drawings.
(2) 
The steps shall be aligned vertically to within one-inch tolerance. Any step or steps not meeting or exceeding the tolerance shall be removed and recored into the manhole barrel section. Loose and poorly aligned steps shall be a cause of rejecting the manhole.
(3) 
The steps shall be installed at 12 inches, measured from center of step to center of step. Any step or steps not meeting this requirement shall be removed and reinstalled to meet this specification.
(4) 
The steps shall be capable of withstanding the design loading required in ASTM C478 specifications.
(5) 
The manhole step(s) shall be in accordance with standard Detail SW-13.
H. 
Ladder Bars.
(1) 
Ladder bar(s) are acceptable for use in concrete vaults. The ladder bars shall be designed in accordance with the latest requirements of ASTM C478.
I. 
Concrete Encasement.
(1) 
Concrete cradle and/or encasement shall be furnished and installed where specified on the plans and profiles. The concrete cradle and/or encasement shall be installed in accordance with standard Detail SW-15 and/or SW-16.
(2) 
Care shall be exercised in placing encasement or cradle to provide adequate anchorage for the pipe(s) in order to prevent flotation and/or displacement of the pipe.
(3) 
Concrete anchors shall be utilized for pipes on steep grades, in accordance with standard Detail SW-14.
J. 
Roadway Sanitary Sewer Clean-out; Frame and Cover.
(1) 
The frame and cover shall be installed when the required clean-out is located in an improved area.
(2) 
The frame and cover shall be suitable for H-20 loading and conforms to ASTM A-48. The frame and cover shall be Class 30, furnished with one coat of black asphaltum paint.
(3) 
The cover shall be inscribed with the "sewer."
(4) 
The frame and cover shall be as manufactured by:
(a) 
Drainage and Water Solutions, Model SC60
(b) 
East Jordan, Model 1575
(c) 
Or approved equal
K. 
Low Pressure Sewer System Grinder Pump.
(1) 
All grinder pumps including, but not limited to, the installation, operation, maintenance, and power requirements/costs are the responsibility of the property owner and not the responsibility of the Township.
(2) 
The Township is responsible for the section of low pressure sewer lateral from the effluent side of the isolation valve to the low pressure main and/or gravity manhole.
(3) 
The isolation valve shall be located on the property owner's side of the road right-of way or public sanitary sewer easement.
(4) 
Grinder pumps for individual sewer service to private properties are used only when gravity service is not available.
(5) 
The recommended grinder pump for this type of service shall be the E-One grinder pump, model GP 2010, as manufactured by Environment One Corporation.
(6) 
The low pressure lateral shall be installed as recommended by the pump manufacturer.
L. 
Connection to Existing Sanitary Sewer Main.
(1) 
All non residential connections to the sanitary sewer system shall be directly into a manhole, connections to the main line pipe are not acceptable.
(2) 
At no time shall sanitary sewer service be interrupted to existing sanitary sewer customers during the installation. Connections shall be made at low flow periods and/or in conjunction with by-passing operations.
(3) 
Residential connections may be accomplished by utilizing a three piece service connection such as manufactured by Inserta Fittings Company or approved equal. Also, a sanitary sewer may be installed on the main line if performed in conjunction with a solid sleeve and by-pass pumping.
(4) 
Any sanitary sewer service connection to a sanitary sewer main constructed of material other than SDR35 sewer, IPS/SCH40, SDR26HWS, C900 or corrugated polyethylene shall have prior approval from the Township.
(5) 
The manufacturer's recommended installation procedures shall be followed.
M. 
Air Testing of Gravity Sanitary Sewers.
(1) 
The contractor shall provide a minimum of 48 hours of notice to the Township of the contractor's intent to perform any sanitary sewer testing.
(2) 
All sections of gravity sanitary sewer pipe shall be tested, any section showing leakage shall be rejected.
(3) 
All repairs that are necessary shall be made promptly and retested to the satisfaction of the Township. Grouting and/or any means of repairs other than replacement are not acceptable. The installation of a fernco type fitting is not acceptable. The pipe shall be replaced by using a solid sleeve and pipe.
(4) 
The procedure and criteria to be used for air testing shall conform to that described by the manufacturer of the respective pipe used and shall be in conformance with ASTM F1417, Standard Test Method for Installation Acceptance of Plastic Gravity Sewer Lines Using Low Pressure Air.
(5) 
The air shall be slowly introduced into the pipe and the pressure shall be gradually increased with the test section to five psi.
(6) 
All pipe tested shall be required to sustain the five psi test pressure without loss or drop in pressure for a time period of five minutes. In event that a loss in pressure does occur, appropriate repairs or reconstruction shall be made and the test procedure shall be rerun until the test criteria (5.0 psi for five minutes) are successfully accomplished.
(7) 
A water test shall be permitted for cast iron pipe only. All other pipe material shall be air tested. A written request for a water test shall be submitted to the Township for approval. The request shall include the testing procedure(s), methods and equipment. Township approval is required for a water test prior to scheduling and completing the water test.[2]
[2]
Editor”s Note: Added at time of readoption of Code.
N. 
Deflection Testing of Gravity Sanitary Sewers.
(1) 
The contractor shall provide a minimum of 48 hours of notice to the Township of the contractor's intent to perform any sanitary sewer testing.
(2) 
All sections of gravity sanitary sewer pipe shall be tested. The pipelines shall be thoroughly cleaned before testing.
(3) 
The test shall be not be performed until the backfill has been in place, compacted, and tamped to final grade for at least 30 days.
(4) 
The maximum acceptable deflection shall be 5% of the vertical internal diameter. The mandrel shall be supplied by the Township and shall have a diameter not less than 95% of the base inside diameter or average inside diameter of the pipe. The pipe shall be measured in compliance with ASTM D2122, Standard Test Method of Determining Dimensions of Thermoplastic Pipe and Fittings.
(5) 
The test shall be performed without mechanical pulling devices.
(6) 
Any section of pipe that fails the test shall be repaired by rebedding and replacement or reinstallation of the pipe and retesting of the repaired pipe after an additional 30 days have passed.
O. 
Vacuum Testing of Manholes.
(1) 
The contractor shall provide a minimum of 48 hours of notice to the Township of the contractor's intent to perform any sanitary sewer testing.
(2) 
All manholes shall be tested.
(3) 
Testing shall be in accordance with ASTM C1244, Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test.
(4) 
Manholes shall be tested after the manhole has been assembled and placement of the backfill to the approximate finished ground elevation.
(5) 
No standing water shall be allowed in the manhole.
(6) 
All pipes, manhole boots, stub-outs, and other openings into the manhole shall be suitably plugged in such a manner to prevent displacement of the plugs while the vacuum is drawn.
(7) 
Installation and operation of the vacuum equipment and indicating devices shall be in accordance with the equipment specifications and instructions provided by the manufacturer.
(8) 
The casting frame/top barrel section (including risers) shall be tested.
(9) 
A vacuum of 10 inches of mercury (Hg) shall be drawn on the manhole. After which, the vacuum pump shall be shut off.
(10) 
If the indicated vacuum pressure drops to nine inches in less than one minute, the test apparatus shall be removed and the appropriate repair(s) shall be performed. The result of the test is considered to be failed until a time period of one minute occurs before the vacuum pressure drops one inch.
(11) 
Appropriate repairs is defined as sealing the grade rings and inside joints with an epoxy compound or approved equivalent.
(12) 
If the manhole joint mastic is displaced during the vacuum test, the mastic shall be cut away and the manhole shall be retested.
P. 
Lamping of the Sewer Main.
(1) 
The Township shall lamp each section of the sanitary sewer pipe, at the time of final inspection, by placing a light at one manhole and observing the pipe at either the next upstream or downstream manhole. Sanitary sewer(s) not constructed on a uniform line and/or grade and therefore not showing a full circle of light during the lamping shall not be approved.
(2) 
Appropriate repairs shall be done as needed until all sections of the sanitary sewer line(s) have successfully passed the lamping test.
Q. 
Television Inspection of the Sanitary Sewer Mains.
(1) 
After cleaning and prior to the acceptance of the sanitary sewer main line(s), the sewer(s) shall be visually inspected by the contractor by means of closed circuit television. The inspection shall be done one manhole section at a time.
(2) 
The contractor shall be allowed to attach the camera to the mandrel to perform the television inspection and mandrel test simultaneously.
(3) 
The television camera used for the inspection shall be specifically designated and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear color picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor and other components of the video system shall be capable of producing a color picture quality to the satisfaction of the Township.
(4) 
The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of the sewer's condition. In no case, shall the television be pulled at a speed greater than 30 feet per minute.
(5) 
Manual winches, power winches, TV cable, and power rewinds or other devices that do not obstruct the camera view or interfere with the proper documentation of the sewer conditions may be used.
(6) 
Any section of gravity sewer which is found by internal TV inspection to be defective, to contain silt and/or debris, or to be otherwise unacceptable to the Township shall be corrected and retested and televised.
(7) 
The importance of accurate distance measurements is emphasized.
(8) 
Documentation of the television results shall be as follows:
(a) 
Television Inspection Log. Printed location records shall be kept and submitted to the Township. The log shall identify points of infiltration, broken pipe, separated joints, and other discernible features. The location of all laterals shall be identified by stationing and position of the wye.
(b) 
Video Recording. The purpose shall be to supply a visual and audio recording of the condition of the line. The playback feature shall be at the same speed that it was recorded.
(9) 
Submit two copies of the television inspection log to the Township prior to Township acceptance of the sanitary sewer infrastructure.
(10) 
The video format shall be mpeg compatible and shall be submitted on DVD format. One copy of the video recording shall be submitted at the same time the television inspection log is submitted.
R. 
Acceptance of Sanitary Sewer.
(1) 
The sanitary sewer(s) shall not be accepted by the Board of Supervisors until all required testing has successfully been completed and the internal television inspection report has been submitted and reviewed. As-builts shall also be submitted in accordance with the Township's specification prior to acceptance.
S. 
Sanitary Sewer Service Line and Connection.
[Added by Ord. 2010-403, 10/7/2010]
(1) 
General. Sewer service line shall include connection to sewer main line, test tee, house trap with fresh air vent, a grease trap where required and connection to the building drain. Downspouts, rain conductors, driveway drains, area drains or french drains shall not be connected to the sewer service line.
[Amended by Ord. 2011-410, 3/3/2011, § 1]
(2) 
Size:
(a) 
Residential (minimum size): four-inch minimum diameter pipe that is installed to a minimum slope of 1/4 inch per foot.
(b) 
Nonresidential: six-inch minimum diameter pipe that is installed to a minimum slope of 1/8 inch per foot.
(3) 
Materials:
(a) 
All sewers below floors of buildings and to a maximum of five feet outside the building wall and the sewer service line shall be Schedule 40 PVC or ABS. A house trap with a vent pipe and Pittsburgh pattern vent cap shall be installed at the end of the drain as shown on Detail SW-29. All pipes under the floor and passing through the floor shall be a minimum of four inches unless prior approval is granted by the Township. The pipe as it exits the building wall shall be installed at a minimum depth of 36 inches. From the trap to the main line connection, the pipe shall be the same as listed above or PVC SDR 35. Vent pipes and cleanouts are not permitted to be located in driveways, cart paths, walkways or other finished surface areas unless prior approval is granted by the Township. The vent cap shall be installed four inches above grade to prevent the inflow of water into the sewer line.
[Amended by Ord. 2011-410, 3/3/2011, § 1]
(b) 
The transition point (change in pipe diameter) shall be located at a distance of not to exceed three feet from the fixture trap. All floor drains shall be four inches in size or larger.
[Amended by Ord. 2011-410, 3/3/2011, § 1]
(c) 
Food preparation establishments and other establishments at the discretion of the Township shall install grease traps of a style and size acceptable to the Township. Sinks in food preparation areas of these establishments shall also have under-sink grease traps. Refer to Details SW-39 and SW-40 for grease interceptor specifications.
(4) 
Cleanouts and Directional Changes. Cleanouts, consisting of a wye branch fitting, a curved fitting, riser pipe and a watertight cap are required every 100 feet or at all directional changes greater than 45°. Cleanouts located in lawns, open fields, or other unfinished surface areas, shall be installed at grade and encased in concrete to provide support for the riser pipe. No ninety-degree bends shall be permitted except on an inside vertical end of run.
(5) 
Adapters. Approved adapters such as donuts or couplings by Fernco, Inc., or approved equivalent, may be used to connect pipe joints, reduce six-inch pipe to four-inch and connect the building drain to the running trap. The couplings shall be shielded to provide the maximum transfer of pressure from the clamp to the gasket to the pipe.
(6) 
Installation. Before digging the trench, the installer should expose the lateral connection and the building drain. Trench width shall be kept to a minimum width and have uniform slope as near as possible at right angles to the street. Excavate all trenches at least six inches below the bottom of the pipe. Place an aggregate backfill, maximum of three-fourths-inch gravel size, in the trench to grade of the pipe. Install the pipe keeping any gravel, dirt or water from entering the pipe. Place twelve-inch soft aggregate on top of the pipe ensuring uniform bedding to all sides of the pipe. The remainder of the trench may be backfilled with material from the original excavation if suitable, as determined by the Township. The sewer line trench shall have a minimum three-foot horizontal separation and eight-inch vertical separation from other pipelines such as water service lines, gas lines, french drains or storm sewers. A Township inspector must be present to visually inspect the backfilling of the pipe zone on sewer lateral trench.
[Amended by Ord. 2011-410, 3/3/2011, § 1]
(7) 
Inspection. The Township shall be notified at least 24 hours prior to the inspection of the building drain, sewer service line and related appurtenances. The inspection shall be conducted prior to the connection to the trap, unless the building drain and the sewer service line are to be inspected at the same date and prior to any backfilling. All lines shall be capped prior to inspection. The inspection shall consist of an air test of five pounds for 15 minutes without any loss of pressure, a visual inspection of the pipe and the recording of pertinent information relating to the installation of the pipe. Inspection will not be scheduled until all applications for service have been submitted. An as-built plumbing plan shall be submitted to the Township prior to service being rendered. If the sewer lines do not pass inspection after two scheduled site visits by the Township, a fee of $262.50 will be levied and must be paid before reinspection of the sewer lines will be scheduled.
(8) 
Final Connection. If a completed connection to the building drain is not made at the time of the installation of the building sewer, a temporary plug shall be solvent-welded into the end of the lateral and shall not be removed until such time as the connection is made to the building drain. A Township representative is to be present to visually inspect the final connection and backfilling of the trench. The connection to the main shall be the responsibility of the property owner.
(9) 
Final Inspection. Prior to the issuance of an occupancy permit by Cranberry Township, the Township will conduct a final inspection of the property to ensure that all sewer facilities located within the property have been installed and maintained in accordance with specifications. The Township’s inspector will complete and sign a final inspection form to be forwarded to Cranberry Township for its subsequent issuance of the occupancy permit. Any deficiencies cited during the final inspection must be corrected prior to the release of the final inspection form by Cranberry Township.
(10) 
Grinder Pump.
(a) 
All grinder pumps, including, but not limited to, the installation, operation, maintenance, and power requirements/costs are the responsibility of the property owner and not the responsibility of the Township.
(b) 
The Township is responsible for the section of low-pressure sewer lateral from the effluent side of the isolation valve to the low-pressure main and/or gravity manhole.
(c) 
The isolation valve shall be located on the property owner's side of the road right-of-way or public sanitary sewer easement.
(d) 
Grinder pumps for individual sewer service to private properties are used only when gravity service is not available.
(e) 
The recommended grinder pump for this type of service shall be the E-One grinder pump, model GP 2010, as manufactured by Environment One Corporation.
(f) 
The low-pressure lateral shall be installed as recommended by the pump manufacturer.
5. 
Water Line.
A. 
General. All pipe shall be transported, unloaded, handled and installed in strict accordance with the recommendations of the pipe manufacturer.
B. 
Ductile Iron Pipe and Fittings.
(1) 
Ductile iron pipe furnished shall be designed in accordance with ANSI Standard A-21.50 and manufactured in accordance with ANSI Standard A-21.51.
(a) 
Mechanical joint water main fittings with accessories, three-inch through thirty-six-inch, shall be produced in the USA of ductile iron in accordance with and meet all applicable terms and provisions of Standards ANSI/AWWA C-153/A-21.53 (current revisions). Ductile iron mechanical joint fittings three-inch through twenty-four-inch shall be rated for 350 PSI working pressure. All ductile iron mechanical joint fittings thirty-inch through thirty-six-inch and all sizes of mechanical joint fittings with flange branches shall be rated for 250 PSI working pressure.
(b) 
Fittings are double cement-lined and seal coated in accordance with standards ANSI/AWWA C-104/A-21.4 and meet the requirements of NSF-61.
(c) 
Fittings shall have distinctly cast on them the pressure rating and the nominal diameter of the openings.
(d) 
All fittings and accessories shall be of domestic manufacture. The approved fitting manufacturers are Clow Pipe, Tyler Pipe, Union Foundry or an approved equivalent.
(e) 
All fittings and pipe installed exposed in buildings or structures shall be flanged joints conforming to ANSI A-21.15. Fittings shall be furnished to conform with the changes in horizontal and vertical alignment indicated on the plans.
(2) 
Pipe shall be furnished in ASTM special thickness Class 52. Fittings shall be a minimum 350 psi pressure classification.
(3) 
Ductile iron pipe and fittings used for water lines shall be double cement lined, and lined and coated with a standard thickness bituminous material in accordance with ANSI/AWWA C-104/A-21.4, Cement-Mortar Lining for Ductile Iron and Gray Iron Pipe and Fittings for Water.
(4) 
Pipe having damaged lining or coating shall be replaced as determined by the Township's representative in the field at no additional cost to the Township.
(5) 
Installation procedures for ductile iron mains and their appurtenances for water service shall also be in general conformance to AWWA C-600, of latest revision. Unless otherwise approved by the Township, all water lines shall be installed at a depth of 4.0 to 4.5 feet of cover over the top of the pipe.
(6) 
All water mains, including those not designed to provide fire protection, shall be sized after a hydraulic analysis based on flow demands, pressure requirements and future requirements.
(7) 
The minimum size of water mains for providing fire protection and serving fire hydrants shall be six inches in diameter. Larger sized mains will be required if necessary to allow the withdrawal of the required fire flow while maintaining the minimum residual pressure of 20 psig.
(8) 
Dead ends shall be minimized by looping all mains whenever practical. Where dead end lines are necessary, the lines shall be provided with the appropriate flushing devices as outlined in § 17-403.2.N Blow-Off Assemblies.
(9) 
Water mains shall be installed at least 10 feet horizontally from any existing or proposed sanitary sewer. The distance shall be measured edge to edge.
(a) 
When it is impossible to achieve the horizontal separation, the proposed sanitary sewer shall be concrete encased as per Detail SW-5.
(b) 
When an existing sewer line is encountered and the water line is proposed and the horizontal separation cannot be met, the water line shall be poly wrapped and the joints shall be concrete encased, three feet on each side of the joint at each joint.
Whenever water mains cross building drains, storm drains or sanitary sewers, the water main shall be laid at such an elevation that the bottom of the water main is 18 inches above the top of the drain or sewer. Where less than 18 inches of vertical separation exists, the sewer line shall be encased in concrete, 10 feet on either side of the water main and relocated in accordance with Detail SW-18.
The fire line entering a structure shall be in accordance with Detail SW-19.
C. 
Restraints. Restrained joint gaskets (field-loc) shall be required in all areas where the water line will be installed in fill and/or inside all casings and/or on slopes that are 20% or greater. Where tees, valves and plugs are provided for future extensions, fittings shall be secured with the use of an ductile iron restraint gland. Restraint glands shall be used on all fittings that require a thrust restraint, therefore, restraint glands and concrete shall be used. Retainer glands shall be made in the USA of ductile iron only.
(1) 
Glands shall be manufactured of ductile iron conforming to ASTM A-536-80. Restraining devices shall be of ductile iron heat treated to a minimum hardness of 370 BHN. Dimensions of the gland shall be such that it can be used with the standardized mechanical joint bell and tee-head bolts conforming to ANSI/AWWA A-21.11 and ANSI/AWWA C-153/A-21.53 of the latest revision. Twist-off nuts shall be used to insure proper actuating of the restraining devices.
(2) 
The mechanical joint restraint device shall have a working pressure of at least 350 psi in sizes four-inch through sixteen-inch and 250 psi of sizes eighteen-inch through forty-eight-inch and a minimum safety factor of 2:1.
(3) 
Twist-off nuts shall be standard on all sizes. The same size socket used to tighten the T-bolts on the four-inch through twenty-four-inch sizes shall be used to tighten and shear the twist-off nuts in all sizes.
Nominal Pipe Size
(inches)
Number of Wedges
4
2
6
3
8
4
10
4
12
6
14
8
16
10
18
10
20
12
24
14
30
18
The restraint gland shall be EBBA iron, Ford/Uni-Flange or approved equal.
[Amended by Ord. 2014-440, 1/30/2014]
(4) 
Joint restraint for Tyton joint pipe and fittings shall be U.S. Pipe's field-loc 350 gaskets, or approved equivalent. The gaskets shall be accordance with the performance requirements of ANSI/AWWA C-111/A-21.11, rubber-gasket joints for ductile-iron pipe and fittings.
(5) 
Field-loc gaskets shall not be used on Tyton joint plugs.
(6) 
Thrust Restraints
(a) 
Concrete blocks shall be cast in place in accordance with the configurations in Detail SW-17. Such blocks shall be required to be poured, after installation of the adjacent piping at all fittings installed along the pipeline.
(b) 
The 4,000 psi concrete shall be placed such that it is supported against undisturbed earth along the excavated trench wall and the trench bottom and shall be thoroughly worked and vibrated to insure complete contact with the walls of the fittings being restrained.
(c) 
No trench backfill shall be placed at the locations of the thrust blocks until 24 hours after placement, and/or until the Township has inspected the installation. Refer to cast-in-place concrete specification for minimum strength of concrete.
(d) 
Where existing conditions do not allow for the use of thrust blocking, restraint fittings only shall be permitted. All other applications shall be thrust blocked and restraint glands installed.
(7) 
Anchoring and Blocking.
(a) 
All bends in excess of 10 degrees, plugs, caps, tees and wye branches along pipelines shall be adequately blocked or anchored to prevent the lines from pulling apart under pressure. Blocking shall conform to Detail SW-17 and SW-18. Blocking shall be placed between undisturbed earth and the fittings to be anchored. Blocking shall be placed so that the fitting joints are accessible for repair.
(b) 
Tie rods, clamps, collars, restrained joints and anchoring fittings may be substituted in lieu of blocking after having received the approval of the Township.
(8) 
Concrete Work. The contractor shall take all necessary precautions to insure that concrete placed during hot or cold weather is not damaged by the extremities of temperature. To this end, the contractor shall place the concrete in accordance with the applicable portions of ACI Standards 305 and 306. No concrete will be accepted which is frozen or damaged due to extremes in weather.
D. 
Polyethylene Encasement for Ductile Iron Pipe/Fittings.
(1) 
Polyethylene encasement (polyethylene film in tube or sheet form) shall be required around all ductile fittings (D.I.) and/or in areas where corrosive soils are present.
(2) 
The polyethylene film shall have a minimum nominal thickness of 0.008 inches and shall be manufactured of virgin polyethylene material conforming to the latest requirements of ASTM D-1248, Polyethylene Plastics Molding and Extrusion Materials.
E. 
Detectable Mylar Marking Tape. A detectable mylar marking tape shall be installed over all water lines by the contractor. It shall be inductively locatable and conductively traceable using standard pipe and/or cable locating devices. Care will be taken to insure that the buried marking tape is mylar encased aluminum foil. The detectable marking tape will bear the words "Caution — Water Line Buried Below." The printing will be under mylar so as to be readable through the clear mylar. Maximum spacing between the continuous warning message shall be 16 inch — 36 inch. The tape shall be highly visible color and the tape will be color coded in accordance with the American Public Works Association and Utility Location Coordination Council Standards and will be minimum three inches in width. The detectable marking tape will be buried one to two feet below finish grade as is practical for optimum detectability. The tape should be placed into backfill and allowed to settle into place in the backfill. The tape shall be specially designed for prolonged underground use and shall be easily detectable with an electronic locator. The detectable mylar marking tape shall be brought to finished grade at all valve box locations, unless directed otherwise by Township.
F. 
Fire Hydrants.
(1) 
Fire hydrants installed shall meet or exceed all applicable requirements and tests of the latest revisions of ANSI/AWWA Standard C-502. Fire hydrants shall meet all test requirements and be listed by Underwriters Laboratories, Inc. A hydrant shall be installed complete where shown on the drawings and as approved by the Township. The installation shall be in general accord with Detail SW-23. In addition, fire hydrants shall meet the following:
(a) 
One anchor tee with a six-inch diameter branch.
(b) 
One six-inch gate valve installed directly onto the anchor tee.
(c) 
One six-inch diameter anchor coupling, length as required, 12 inches minimum separation between the valve and the hydrant. Where anchor coupling length exceed 10 feet, restraint glands shall be installed. All pipe shall be ductile iron pipe.
(d) 
Concrete blocking.
(e) 
One fire hydrant complying with AWWA Specification C-502 Dry-Barrel Fire Hydrant. It shall be the self-oiling, dry bonnet type with o-ring seal, the high pressure type designed to operate under a live pressure of 250 psi, and traffic type to provide a break flange and stem for protection against water loss if the hydrant barrel is broken. It shall meet the following requirements:
(a) 
Fire hydrants shall be rated for a working pressure of 250 psig (1,725 kPa) and subjected to a hydrostatic test at the factory at least 300 psig.
(b) 
Fire hydrants shall be of the compression type, opening against the pressure and closing with the pressure.
(c) 
Fire hydrants shall have a minimum five-and-one-fourth-inch main valve opening and a minimum inside lower/upper barrel diameter (I.D.) of seven inches to assure maximum flow performance. Pressure loss at 1,000 GPM shall not exceed the following values:
4-inch pumper nozzle
2.70 psi
4.5-inch pumper nozzle
2.50 psi
(d) 
Fire hydrants shall be three-way in design, having one pumper nozzle (size as specified) and two-and-one-half-inch hose nozzle(s). Nozzle thread type shall be National Standard Thread. Nozzles shall thread counterclockwise into hydrant barrel utilizing o-ring seals. A suitable nozzle lock shall be in place to prevent inadvertent nozzle removal.
(e) 
The bonnet assembly shall provide an oil reservoir and lubrication system that automatically circulates lubricant to all stem threads and bearing surfaces each time the hydrant is operated. This lubrication system shall be sealed from the waterway and any external contaminants by use of o-ring seals. An anti-friction washer shall be in place above the thrust collar to further minimize operating torque. The oil reservoir shall be factory filled with a low viscosity, FDA approved nontoxic oil lubricant which will remain fluid through a temperature range of -60° F. to + 150° F.
(f) 
The operating nut shall be a one piece design, manufactured of ASTM B-584 bronze. It shall be pentagon/square in shape and the nut dimensions shall be as specified by the end-user. The operating nut shall be affixed to the bonnet by means of an ASTM B-584 bronze hold down nut. The hold down nut shall be threaded into the bonnet in such a manner as to prevent accidental disengagement during the opening cycle of the hydrant. The use of Allen head set screws as a means of retention is unacceptable. A resilient weather seal shall be incorporated into the hold down nut, for the purpose of protecting the operating mechanism from the elements.
(g) 
The direction of the opening shall be counter clockwise. An arrow shall be cast on the bonnet flange to indicate the specified opening direction.
(h) 
The hydrant bonnet shall be attached to the upper barrel by not less than eight bolts and nuts and sealed by an o-ring.
(i) 
Hydrants shall be a traffic-model having upper and lower barrels joined at the ground line by a separate and breakable swivel flange providing 360° rotation of upper barrel for proper nozzle facing. This flange shall employ not less than eight bolts. The safety flange segments shall be located under the upper barrel flange to prevent the segments from falling into the lower barrel when the hydrant is struck. The pressure seal between the barrels shall be an o-ring. The proper ground line shall be cast clearly on the lower barrel and shall provide not less than 18 inches of clearance from the center line of the lowest nozzle to the ground.
(j) 
The operating stem shall consist of two pieces, not less than 1-1/4 inch diameter (excluding threaded or machined areas) and shall be connected by a stainless steel safety coupling. The safety coupling shall have an integral internal stop to prevent the coupling from sliding down into the lower barrel when the hydrant is struck. Screws, pins, bolts or fasteners used in conjunction with the stem couplings shall also be stainless steel. The top of the lower stem shall be recessed two inches below the face of the safety flange to prevent water hammer in the event of a drive over where a vehicle tire might accidentally depress the main valve.
(k) 
The lower barrel shall be an integrally cast unit. The use of threaded on or mechanically attached flanges is deemed unacceptable. The hydrant bury depth shall be clearly marked on the hydrant lower barrel.
(l) 
Composition of the main valve shall be a molded rubber having a durometer hardness of 95 +/- 5 and shall be reversible in design to provide a spare in place. Plastic (polyurethane) main valves are unacceptable. The main valve shall have a cross section not less than one inch.
(m) 
Hydrants shall be equipped with two drain valves which drain the barrel when the hydrant is closed and seal shut when the hydrant is opened. These drain valves shall be an integral part of the one piece bronze upper valve plate. They shall operate without the use of springs, toggles, tubes, levers or other intricate synchronizing mechanisms.
(n) 
The upper valve plate, seat ring and drain ring (shoe bushing) must be ASTM B-584 bronze and work in conjunction to form an all bronze drain way. A minimum of two internal and two external drain openings are required. Drains ported through an iron shoe must be bronze lined.
(o) 
The bronze seat ring shall thread into a bronze drain ring (or shoe bushing) providing a bronze to bronze connection. Seat rings shall be o-ring pressure sealed.
(p) 
The shoe inlet size and connection type shall be as specified (flanged, MJ, etc.), having ample blocking pads for sturdy setting and the MJ connection must have two strapping lugs to secure the hydrant to piping. A minimum of six bolts and nuts is required to fasten the shoe to the lower barrel.
(q) 
The interior of the shoe including the lower valve plate and stem cap nut shall have a protective coating that meets the requirements of AWWA C-550. If a stem cap nut is utilized, it must be locked in place by a stainless steel lock washer or similar non-corrosive device that will prevent the cap nut from backing-off during normal use.
(r) 
Hydrants shall be warranted by the manufacturer against defects in materials or workmanship for a period of 10 years from the date of manufacture.
(s) 
Hydrants shall be Mueller Super Centurion 250 or approved equal.
(t) 
Depth of bury shall be 4 1/2 feet.
(u) 
Hydrants shall be prime coated and receive two finish coats of paint as shown in Detail SW-23. Sherwin-Williams Company paint product: KEM®400.
[Amended by Ord. 2011-410, 3/3/2011 § 2]
1) 
Red: F75KXR2171-1497.
2) 
Orange: F75KXE9978-1497.
3) 
Green: F75KXG9977-1497.
4) 
Blue: F75KXL9979-1497.
(v) 
Fire hydrants shall be located as shown or as directed and in a manner to provide complete accessibility, and also in such a manner that the possibility of damage from vehicle or injury to pedestrians will be minimized. The arrangements and details of construction shall conform to those shown on Detail SW-23.
(w) 
Fire hydrants shall be spaced to provide a minimum of 500 feet radius of coverage from each fire hydrant or as deemed necessary by the Township.
(x) 
Each hydrant shall be connected to the main with a six-inch ductile branch controlled by an independent six-inch gate valve, except as otherwise directed. Each hydrant lateral valve shall be fastened to the main with a special adapter, special hydrant tee or by suitable cable, harness or tie rods.
(y) 
A stone and concrete foundation, at least six inches thick and 18 inches square, shall be placed underneath the base of the hydrant. This foundation shall be placed on a firm subbase and shall be level so as to support the underbase of the hydrant. The hydrant base shall be braced and blocked, as indicated in Detail SW-23. It is of utmost importance that solid bearing be obtained from the blocking and that such blocking be completely adequate.
(z) 
The space around the slabs and above the base of the hydrant to a height of at least 18 inches and a distance of at least 12 inches from the hydrant around the entire circumference shall be filled with broken stone or gravel absolutely clean, not less than 3/4 inch in size. Not less than 12 cubic feet of broken stone or gravel shall, in all cases extend at least six inches above the waste opening in the hydrant.
(aa) 
In locations where the hydrants are to be placed in a sloping area, a clear area shall be provided in back of and along the sides of the fire hydrants and the earth shall be supported by an adequate stone wall on all three sides.
(bb) 
Fire hydrants shall be required on all nonresidential development sites at a rate of one hydrant per each 150,000 gross square feet of building area. The number of hydrants required does not take into account the one required hydrant for sprinkler buildings as part of this calculation. The spacing and location of all proposed hydrants shall be at the discretion of Township staff, according to fire company needs. For any building(s) that are below the threshold of 150,000 gross square feet, one mainline hydrant shall be required within 500 feet of the proposed building in addition to any required hydrant for a sprinklered building.
[Added by Ord. 2011-410, 3/3/2011, § 2]
(2) 
In general all fire hydrants shall be set plumb with the pumper nozzle facing the roadway, and with the center of the lowest outlet not less than 18 inches above the finished surrounding grade, and the operating nut not more than 48 inches above the finished surrounding grade.
(3) 
One hydrant wrench, as approved by the Township, shall be furnished to the Township when less than five hydrants are installed. When five or more hydrants are installed, two hydrant wrenches, as approved by the Township, shall be furnished. All wrenches supplied shall be heavy duty.
G. 
Resilient Wedge Gate Valves — 4-12 inch.
(1) 
The resilient seat gate valves shall fully comply with the latest revision of AWWA C-509 and shall also be UL listed and FM approved. The valves shall be tested and certified to ANSI/NSF 61.
(2) 
The valve shall have a 250 psig working pressure. Each valve shall be factory seat tested to 250 psig and shell tested to 500 psig.
(3) 
The valve type shall be NRS (non-rising stem) or OS&Y (outside screw and yoke) as specified.
(4) 
The valve shall have an arrow cast on the operating nut or handwheel showing opening direction. The direction of opening shall be counterclockwise.
(5) 
The NRS valves shall be provided with a two-inch square operating nut and OS&Y valves shall be provided with a handwheel. The bolt that attaches the operating nut to the stem shall be recessed into the operating nut so as not to interfere with valve wrench operation.
(6) 
The valves shall have bolts and nuts for the stuffing box and bonnet with one of the following compositions:
—Steel, ASTM A-307, Grade B zinc plated
—Type 304 stainless steel
—Type 316 stainless steel
(7) 
The valve stem shall be made of bronze ASTM B-132 alloy C-67600 bar stock material. The stem shall have at least one anti-friction thrust washer above and below the stem collar to reduce operating torque. The design of the NRS valve stem shall be such that if excessive input torque is applied, stem failure shall occur above the stuffing box at such a point as to enable the operation of the valve with a pipe wrench or other readily available tool. The stem material shall provide a minimum 70,000 psi tensile strength with 15% elongation and yield strength of 30,000 psi. Valves with two-piece stem collars do not meet the requirements of AWWA C-509 and are unacceptable.
(8) 
The NRS valves shall have a stuffing box that is o-ring sealed. Two o-rings shall be placed above and one o-ring below the stem thrust collar. The thrust collar shall be factory lubricated. The thrust collar and its lubrication shall be isolated by the o-rings from the waterway and from outside contamination providing permanent lubrication for long term ease of operation. Valves without a stuffing box are unacceptable. Valves without at least three stem orings are also unacceptable.
(9) 
The valve body, bonnet, stuffing box and disc shall be composed of ASTM A-126 Class B grey iron or ASTM A-395 or A-536 ductile iron. The body and bonnet size shall also adhere to the minimum wall thickness as set forth in Table 2, § 4.3.1 of AWWA C-509. Wall thickness less than those in Table 2 are not acceptable.
(10) 
The valve disc and guide lugs must be fully (100%) encapsulated in SBR ASTM D-2000 rubber material (or EPDM as a specified alternative). The peel strength shall not be less than 75 pounds per inch. Guide caps of an Acetal bearing material shall be placed over solid guide lugs to prevent abrasion and to reduce the operating torque. Guide lugs place over bare metal are not acceptable.
(11) 
The valves shall have all internal and external ferrous surfaces coated with a fusion bonded thermosetting powder epoxy coating of 10 mils nominal thickness. The coating shall conform to AWWA C-550.
(12) 
The valves shall be warranted by the manufacturer against defects in materials or workmanship for a period of 10 years from the date of manufacture.
The NRS valves shall be Mueller A-2360 series or approved equal.
The OS&Y valves shall be Mueller R-2360 series or approved equal.
H. 
Butterfly Valves - Sixteen-inch and Larger. All butterfly valves shall be rated for 250 psig service.
(1) 
Valve bodies shall be constructed of cast iron ASTM A-126 Class B. End connections shall be as specified on the plans.
(2) 
Valve discs shall be constructed of cast iron ASTM A-40 Class 40 Class 40 (ten-inch to twenty-inch) or ductile iron ASTM A-536 Grade 65-45-12 (six-inch, eight-inch, twenty-four-inch to forty-eight-inch). Disc shall be furnished with 316 stainless steel seating edge to mate with the rubber seat.
(3) 
Valve seat shall be Buna-N rubber located on the valve body and shall be retained without the use of metal retainers or other devices located in the flowstream.
(4) 
Valve shafts shall be stainless steel ASTM A-564 Type 630 Condition H-1150. Stub shafts or through shafts are acceptable. Shaft seals shall be standard self-adjusting chevron V-type packing. Shaft seals shall be of a design allowing replacement without removing the valve shaft.
(5) 
Valve bearings shall be sleeve type that are corrosion resistant and self-lubricating. Bearing load shall not exceed 1/5 of the compressive strength of the material.
(6) 
Valve actuators shall be fully grease packed and have stops in the open/close position. The actuator shall have a mechanical stop which will withstand an input torque of 450 ft. lbs. against the stop. The traveling nut shall engage alignment grooves in the housing.
(7) 
The valve interior and exterior surfaces except for seating shall be coated with two coats of asphalt varnish in accordance with TT-C-494A and AWWA C-504.
(8) 
All valves shall be hydrostatic and leak tested. The leak test shall be performed at a differential pressure of 250 psig with the disc in a closed position. In a slightly open position, internal hydrostatic pressure equal to 500 psig shall be applied to the inside of the valve body for five minutes.
(9) 
Valves shall be Mueller Lineseal XP, Class 250B, or approved equal.
I. 
All valves, gate, butterfly, and tapping shall have a maximum depth of 48 inches from finished grade to the operating nut. Where valves are deeper, one extension, approved by the Township, shall be installed by the Contractor to bring the operating nut to within 36 inches of finished grade.
J. 
There shall be a main line (gate or butterfly) installed immediately following each fire hydrant assembly. Also, a main line gate valve shall be installed immediately prior to the main line tee at all cul-de-sac loops.
K. 
Valve Boxes.
(1) 
Each valve installed shall be equipped with a valve box. Valve boxes shall be made of cast iron ASTM A-48 and two piece construction of the screw type and shall have a five-and-one-forth-inch diameter shaft. The minimum thickness of the metal shall be one-forth-inch thick.
The screw type extension range shall be 39 to 60 inches and shall have "water" cast on the lid.
All castings shall be made accurately to all required dimensions and shall be smooth, sound and free of any blemishes or other defects. The valve boxes shall be given two coats of coal tar varnish.
(2) 
All valve boxes located in improved areas shall be installed with a foam mud plug as approved by the Township.
(3) 
The top of the valve box shall be set flush with final grade, when an extension is necessary or deemed required by the Township, the extension shall be of cast iron and shall be of the same manufacturer as the valve box. Ductile iron and/or PVC pipe for use as an extension is not acceptable.
(4) 
In general, all valve boxes shall be set plumb and centered on the valves. One steel tee-handle operating valve wrench shall be furnished when less than 10 main line valves and valve boxes are required, with a stem length sufficient to suit all installations and socket-fitting valve-operating nut. When ten or more main line valves and valve boxes are required, two steel tee-handle operating valve wrenches shall be furnished. All valve wrenches shall fit the valves and boxes required. All wrenches supplied shall be heavy-duty and have a protective paint coating.
(5) 
The boxes shall be Tyler Series 6850, 664-S or Bingham & Taylor No. 4905, size no. 22 or approved equivalent.
L. 
Tapping Sleeves.
(1) 
A connection larger than two inches to the existing water main is the contractor's responsibility. The Township will be responsible to make connections of three-forths inch, one inch, one and one-half inches and two inches only.
(2) 
Connection to the existing water main requires the approval and direct observation of a Cranberry Township Representative. The contractor shall schedule an inspection with the Township 72 hours in advance of the work being performed.
(3) 
Tapping sleeves shall be of the heavy body cast iron, mechanical joint type or stainless steel wrap around type as approved by the Township.
Manufacturers:
(a) 
Mueller - H-615 (cast iron).
(b) 
Ford — 304L Series, Style — Fast, Mueller H-304, stainless steel.
(c) 
Approved equivalent.
(4) 
All tapping assemblies shall be pressure tested and witnessed by the Township's Representative prior to use to assure the integrity of the connection. The tapping sleeves and valves shall be tested at not less than 400 pounds per square inch hydrostatic pressure and be suitable and guaranteed to stand a working pressure of 200 pounds per square inch.
(5) 
All tapping sleeves shall be installed at a minimum of three feet from pipe joints. The pipe coupon shall be given to the Township's representative. Provide minimum 3,000 psi concrete thrust restraints in accordance with Detail SW-17.
M. 
Resilient Wedge Tapping Valves — 2-12 inch.
(1) 
The resilient seat gate valves shall fully comply with the latest revision of AWWA C-509 and shall also be UL listed and FM approved. The valves shall be tested and certified to ANSI/NSF 61.
(2) 
The valve shall have a 250 psig working pressure. Each valve shall be factory seat tested to 250 psig and shell tested to 500 psig.
(3) 
The valve type shall be NRS (non-rising stem).
(4) 
The valve shall have an arrow cast on the operating nut showing opening direction. The direction of opening shall be counterclockwise.
(5) 
The NRS valves shall be provided with a two-inch square operating nut. The bolt that attaches the operating nut to the stem shall be recessed into the operating nut so as not to interfere with valve wrench operation.
(6) 
The valves shall have bolts and nuts for the stuffing box and bonnet with one of the following compositions:
(a) 
Steel, ASTM A-307, Grade B zinc plated
(b) 
Type 304 stainless steel
(c) 
Type 316 stainless steel
(7) 
The valve stem shall be made of bronze ASTM B-132 alloy C-67600 bar stock material. The stem shall have at least one anti-friction thrust washer above and below the stem collar to reduce operating torque. The design of the NRS valve stem shall be such that if excessive input torque is applied, stem failure shall occur above the stuffing box at such a point as to enable the operation of the valve with a pipe wrench or other readily available tool. The stem material shall provide a minimum 70,000 psi tensile strength with 15% elongation and yield strength of 30,000 psi. Valves with two-piece stem collars do not meet the requirements of AWWA C-509 and are unacceptable.
(8) 
The NRS valves shall have a stuffing box that is o-ring sealed. Two o-rings shall be placed above and one o-ring below the stem thrust collar. The thrust collar shall be factory lubricated. The thrust collar and its lubrication shall be isolated by the o-rings from the waterway and from outside contamination providing permanent lubrication for long term ease of operation. Valves without a stuffing box are unacceptable. Valves without at least three stem orings are also unacceptable.
(9) 
The valve body, bonnet, stuffing box and disc shall be composed of ASTM A-126 Class B grey iron or ASTM A-395 or A-536 ductile iron. The body and bonnet size shall also adhere to the minimum wall thickness as set forth in Table 2, § 4.3.1 of AWWA C-509. Wall thickness less than those in Table 2 are not acceptable.
(10) 
The valve disc and guide lugs must be fully (100%) encapsulated in SBR ASTM D-2000 rubber material (or EPDM as a specified alternative). The peel strength shall not be less than 75 pounds per inch. Guide caps of an Acetal bearing material shall be placed over solid guide lugs to prevent abrasion and to reduce the operating torque. Guide lugs place over bare metal are not acceptable.
(11) 
The valves shall have all internal and external ferrous surfaces coated with a fusion bonded thermosetting powder epoxy coating of 10 mils nominal thickness. The coating shall conform to AWWA C-550.
(12) 
The valves shall have an inlet flange conforming to ANSI B-16.1 Class 125 for attachment to a tapping sleeve or cross. In addition, the valve inlet flange shall have a machined projection or raised face complying with MSS SP-60 for accurate alignment to the mating recess in the tapping sleeve flange. The seat opening of the tapping valves shall be at least .30 inch larger than the nominal pipe size to permit full size shell cutters.
(13) 
The valves shall be warranted by the manufacturer against defects in materials or workmanship for a period of 10 years from the date of manufacture.
The NRS valves shall be Mueller T-2360 series or approved equal.
N. 
Blow-Off Assemblies. Blow-off connections shall be installed at the ends of lines, on cul-de-sacs and where directed by the Township. They shall, whether side or end connection, conform to Details SW-20 and SW-21.
O. 
Copper Loop.
(1) 
All copper cul-de-sac loops shall be two-inch type K copper, see Detail SW-22. The copper shall be sleeved under any proposed roadway in four-inch PVC conduit, minimum SDR-35.
(2) 
The loop shall consist of a main line tee with two two-inch iron pipe threaded (1.P.T.) plugs. Two two-inch iron pipe threaded to compression adaptors, Mueller H-15428, or approved equal.
(3) 
Each service connection shall consist of the following (typical):
Two two-inch iron pipe threaded to compression adaptors, Mueller H-15428, or approved equal.
One two-inch-by-two-inch-by-three-fourths-inch
two-inch-by-two-inch-by-three-fourths-inch female iron pipe threaded brass tee, meeting or exceeding ASTM B-584.
One three-forths-inch pipe threaded to compression adaptor, Mueller H-15428, or approved equal.
Ten feet of three-forths-inch type K copper.
One ball curb stop, Mueller B-25209, or approved equal.
One curb box Tyler 94E.
One four-inch-by-four-inch-by-eight-foot woolmanized marking stake.
(4) 
The blow-off assembly shall be located at the property line closest to the above-mentioned main line tee. The blow-off assembly shall consist of the following:
Three two-inch ball curb valves, Mueller B-25172, or approved equal.
Four two-inch-by-one-foot red brass nipples meeting or exceeding ASTM B-687.
One two-inch-by-two-inch-by-two-inch female iron pipe threaded tee meeting or exceeding ASTM -584.
One two-inch ninety-degree red brass elbow with a one-eight-inch diameter drain hole.
One two-inch red brass vertical nipple, with a minimum length of three feet six inches.
One two-inch red brass coupling with female iron pipe thread meeting or exceeding ASTM B-584.
One two-inch PVC, Schedule 40, male threaded plug.
Four valve boxes, Tyler 664-S or Bingham and Taylor 4905, size number 22.
P. 
End Blow-Off.
(1) 
A typical end blow-off as shown in Detail SW-21 shall consist of the following:
One two-inch female iron pipe threaded plug.
Two two-inch-by-one-foot red brass nipples meeting or exceeding ASTM B-687.
One ball curb valve, Mueller B-20283, or approved equal.
One two-inch ninety-degree red brass elbow with a one-eighth-inch diameter drain hole.
One two-inch red brass vertical nipple, with a minimum length of three feet six inches.
One two-inch red brass coupling with female iron pipe thread meeting or exceeding ASTM B-584.
One two-inch PVC, schedule 40, male threaded plug.
Two valve boxes, Tyler 664-S or Bingham and Taylor 4905, size number 22 or approved equal.
Q. 
Copper Service Line Fittings.
(1) 
All underground service line valves and fittings shall be in accordance with ANSI/AWWA C-800, Underground Service Line Valves and Fittings. The metal alloy shall be Red Brass of 85-5-5 content. All underground fittings shall be of the conductive compression type, flared fittings shall not be permitted.
(a) 
Ball Corporation Stops.
1)
The stops shall be designed for insertion into water mains under pressure. The stop shall be of the conventional plug type design, the thread shall be AWWA taper thread (CC) on the inlet side and male iron pipe (MIP) thread on the outlet side for use with compression copper service tubes, type K copper. The corporation stop shall be of the conductive compression type, with 300 psig maximum working pressure. The stop shall have a blow out proof stem design with the stem built from the inside out and with double o-ring stem seals. The stem shall have full 360° rotation.
2)
The compression nut is coated on the inside to prevent the gripper band and gasket from turning during installation. The compression connection has a positive stop thereby decreasing the potential for over torquing or under torquing during installation. The compression nut shall have eight flats for griping.
3)
The ball corporation stops for three-fourths inch, one inch, one and one-half inches and two inches shall be Mueller B-25008 or approved equal.
(b) 
Ball Curb Stops.
1)
The curb stop shall be of a ball valve design. It shall have the standard tee head design and the body permits only a 90° turn off and on. The stop shall have a blow out proof stem design with the stem built from the inside out and with double o-ring stem seals. The cap is pinned to the stem. The curb stop shall be of the conductive compression type, with 300 psig maximum working pressure.
2)
The compression nut is coated on the inside to prevent the gripper band and gasket from turning during installation. The compression connection has a positive stop thereby decreasing the potential for over torquing or under torquing during installation. The compression nut shall have eight flats for griping. The stops shall be constructed with an inlet and outlet having fitting threads for use with compression copper service tubes, type K copper.
3)
The Ball Corporation Stops for three-forths inch, one inch, one and one-half inches, and two inches shall be Mueller B-25209 or approved equal.
(c) 
Meter Valve.
1)
The meter valve shall be located immediately inside of the structure. The valve shall be of brass, meeting or exceeding ASTM B-584. The valve shall be female iron pipe thread on the outlet side, with the inlet side flared. The valve shall open counterclockwise.
2)
The valve shall be manufactured by legend valve, model T-441/T-442 or approved equal.
3)
For use with SDR-9, HDPE, an E-22 style compression ball valve shall be permitted at the meter spread only. HDPE service lines require the anchoring of meter spreads to the floor or wall. The ball style meter stop shall be A.Y. McDonald, Model 4602B-22 or approved equal.
[Added by Ord. 2012-429, 6/7/2012, § 4; amended by Ord. 2016-465, 6/30/2016]
R. 
Domestic Service Saddles.
(1) 
A tapping saddle shall be required on all one-and-one-half-inch and two-inch service connections and/or reconnections. The saddle shall have a brass body and double brass straps. The saddle shall be tapped with AWWA Taper (CC) Threads. The saddle shall meet or exceed all applicable parts of ANSI/AWWA C-800.
(2) 
Tapping saddles are required on all connections (three-fourths inch, one inch, one and one-half inches and two inches) to asbestos-cement or cast iron pipe.
(3) 
The service saddle shall be Mueller BR 2B, Ford Style 202B or approved equal.
S. 
Domestic Service Lines three-forths inch, one inch, one and one-half inches and two inches Within Road Right-of-Way and Waterline Easements.
(1) 
Materials.
[Amended by Ord. 2010-403, 10/7/2010]
(a) 
All services, prior to the meter, meter pit or meter vault, identified above, shall be Type K copper, annealed soft copper tubing, in accordance with ANSI/ASTM B.88 (only direct burial; copper shall not be sleeved) Type K copper (without conduit and/or plastic sleeve), polyethylene coated Type K copper or SDR-9 HDPE pipe. The copper tubing shall be in accordance with ASTM B-88 and NSF-61. The copper tubing shall be manufactured by Kam Co. or an approved equal.
[Amended by Ord. 2011-410, 3/3/2011, § 2]
(b) 
The SDR-9 shall be rated for 200 psi and shall be CTS. The line shall be installed such that there shall be no unions utilized prior to the meter, meter pit or meter vault.
(c) 
All plastic water line shall be installed with 10 Gauge solid coated tracer wire. The tracer wire shall be attached to the plastic water line by using a high shear rubber adhesive tape specifically designed as a universal abatement prep tape. The tape shall be manufactured by Repcor E-Z Tear Polywrap Tape or approved equal. The tape shall be a minimum of two inches in width and shall be attached at the corporation stop and at five-foot intervals along the length of the service line.
[Amended by Ord. 2011-410, 3/3/2011, § 2]
(d) 
The tracer wire and tape shall be attached at the corporation stop and installed to and up through the top of the curb box or valve box. The tracer wire shall be brought to the surface at the curb box or valve box.
(e) 
In the event that the tracer wire needs to be repaired, extended or replaced, connection/repair shall be made via weatherproof and underground wire connectors for tracer wire. The connector(s) shall be manufactured by Ideal or approved equal.
[Added by Ord. 2011-410, 3/3/2011, § 2]
(2) 
Cranberry Township is not responsible for the excavation, installation, material and/or other costs (traffic control, road occupancy permit, etc.) associated with the installation of all domestic services.
(3) 
The service line shall be one continuous length of copper from the corporation stop to the curb stop.
[Amended by Ord. 2010-403, 10/7/2010]
(a) 
Lay in a line as straight as possible at a right angle to the street and/or water main. Minimum depth shall be four feet below finished grade. Depths greater than four feet will not be permitted unless prior approval is granted by the Township. Bottom of trench shall be excavated to conform to the curvature of the pipe and afford uniform bearing surface. Bedding material may be required if a severe rock condition is encountered. Polyethylene wrap and/or bedding material may be required if corrosive soils are encountered.
(b) 
Service lines shall be installed in a conduit under the floor or through a structure wall. A conduit shall also be installed in areas where the service line crosses other utilities. The service line shall be located a minimum of three feet from parallel utility lines. The curb stop and curb box shall not be located within three feet of perpendicular utility lines or other underground appurtenances, and shall not be located in driveways, walkways, parking lots or other finished surface areas.
(c) 
A Fernco adaptor or approved equivalent shall be utilized inside the structure and shall connect from the sleeve to the service line.
[Added by Ord. 2011-410, 3/3/2011, § 2]
(4) 
No union connections shall be permitted on service lines of less than 100 feet in length for three-forths-inch and one-inch type K Copper services, 60 feet in length for one-and-one-half-inch type K Copper services and 40 feet in length for two-inch type K Copper services. The length is defined as the distance from the curb stop to the meter spread inside the structure.
(5) 
The service line shall be installed in PVC Schedule 40 conduit under the floor and/or through the structure wall. The conduit shall extend a minimum of five feet from the structure, toward the curb stop. A conduit shall also be installed in areas where the service line crosses other utilities.
(6) 
For services that require more than one union, a meter pit or meter vault shall be required. Refer to § 17-403.5.BB for specific meter pit/meter vault requirements. The costs associated with the meter pit/meter vault is the responsibility of the applicant requesting service. The meter pit/meter vault shall not be located with the public right-of-way.
(7) 
See Detail SW-34 for required minimum size of excavation associated with water tap and domestic service line connections.
T. 
Domestic Services — Long Side.
(1) 
Long side services are those in which the water main is located on the opposite side of the roadway. A plastic conduit consisting of a minimum of PVC SDR-35 or thicker wall and of two-inch inside diameter shall be installed for all three-fourths inch and one inch type K Copper services. For one-and-one-half-inch and two-inch type K Copper services, the conduit shall have a minimum inside diameter of four inches and shall be installed in PVC Schedule 40 pipe.
(2) 
Cranberry Township is not responsible for the excavation, installation, material, and/or other costs (traffic control, road occupancy permit, etc.) associated with the installation of long side domestic services.
(3) 
See Detail SW-34 for required minimum size of excavation associated with water tap and domestic service line connections.
U. 
Curb Box.
(1) 
The curb box shall be the buffalo type and have an extension range of 42 to 60 inches. The curb box shall be constructed of cast iron. The screw for the curb box lid shall be pentagonal and made of red brass, seventeen-thirty-seconds-inch in diameter, 1 12/32 inches long and have 12 threads to the inch. The curb box lid shall be furnished with the word "water" cast thereon.
(2) 
The curb box shall be Tyler pipe, Model 94-E or approved equal.
(3) 
For one-and-one-half-inch and two-inch curb stops, the curb box shall be fitted with a Tyler 14 curb box base.
(4) 
Curb boxes shall not be located in driveways, walkways, parking lots or other improved areas. For new services, the curb box shall be relocated, at the builder's expense, if it is located in one of the above referenced areas.
(5) 
All water service lines constructed of Type "K" copper or HDPE material shall have a twenty-four-inch curb stop extension rod installed. The extension rod shall be attached to the curb stop key with a stainless steel connection mechanism, and the extension rod shall have a permanently attached center ring.
[Added by Ord. 2012-429, 6/7/2012, § 4]
(6) 
The curb box rod shall be manufactured by C.P. Test Services, Valvco, Inc., No. 24VROD or approved equal.
[Added by Ord. 2012-429, 6/7/2012, § 4]
V. 
Service Line Repairs. Any existing service line requiring repairs shall be replaced in full from the curb box to the structure for distances up to and including 100 feet in length unless otherwise approved by the Township. The curb box and curb stop may also require replacement at the time of repair as deemed necessary by the Township.
W. 
Inspection.
[Amended by Ord. 2010-403, 10/7/2010]
(1) 
All domestic service lines (residential) including new installation, the repair/replacement, or the relocation of an existing domestic service line shall be subjected to inspection by the Township. The domestic service line shall remain exposed until a site inspection has been performed. Notify the Township at least 24 hours in advance of requested inspection. If the water service line does not pass inspection, a fee of $262.50 will be levied and must be paid prior to the reinspection of the service line being scheduled.
(2) 
A final inspection is required prior to the issuance of the certificate of occupancy. The Township will conduct a final inspection of the sewer and/or water facilities located within the property. All manholes shall be visible and to finish grade, all cleanouts and fresh air vents shall be visible, straight and in accordance with Detail SW-29, all valve boxes, curb boxes, and fire hydrants shall be visible, straight, and to finish grade. Any deficiencies cited during the final inspection must be corrected prior to the release of the final inspection form by Cranberry Township.
(3) 
Hot Water Heater Thermal Expansion Absorber. To protect the interior plumbing system and appurtenant fixtures from the hazards of thermal expansion, all connections to the water system shall have installed a thermal expansion absorber in accordance with Detail SW-28. Tank shall be Amtrol Therm-X-Trol or approved equal. A thermal expansion absorber is not required on tank-less water heaters.
X. 
Domestic Water Meter.
(1) 
Installation.
[Amended by Ord. 2010-403, 10/7/2010]
(a) 
All domestic water meters (master meters only) are supplied by the Township and are included in the cost of the tapping fee/facility fee. The meter spread shall conform to Details SW-31 and SW-32 for full three-quarter-inch and one-inch meters. For domestic meters 1 1/2 inches and larger, refer to Detail SW-38 for the appropriate meter spread. Under no circumstance shall water service be initiated prior to the installation of the water meter. No meter shall be delivered or installed until all applicable tapping fees/facility fees have been paid. The Township requires a minimum of 24 hours' advance notice prior to scheduling the meter installation.
[Amended by Ord. 2011-410, 3/3/2011, § 2; and by Ord. 2016-465, 6/30/2016]
(b) 
The Township shall provide and install the following meter size(s): full three-quarter-inch meter and/or a one-inch meter. Meters that are 1 1/2 inches in size or larger, the Township is responsible for supplying and delivering the meter (after the tap fee has been received) only to the construction site. The property owner shall be responsible for the installation of any meter 1 1/2 inches in size or larger.
[Amended by Ord. 2016-465, 6/30/2016]
(c) 
The on-demand remote reading system and interconnection wires shall be furnished and installed by the Township for all sizes of domestic water meters.
[Amended by Ord. 2016-465, 6/30/2016]
(d) 
The Township requires a minimum of 24 hours’ advance notice prior to scheduling domestic water meter installations or meter delivery. If the interior of the structure is finished prior to the meter install, the property owner is responsible for installing the remote wire.
[Amended by Ord. 2011-410, 3/3/2011, § 2]
(e) 
Each multifamily building and/or each nonresidential building shall have one master meter per building. The Township shall invoice one account, the owner of the building. The owner may submeter each tenant if necessary. The owner assumes all responsibility for purchasing, installing, reading and billing of submeter(s).
[Added by Ord. 2011-410, 3/3/2011, § 2]
(f) 
For use with SDR-9, HDPE, an E-22 style compression ball valve shall be permitted at the meter spread only. The ball style meter stop shall be A.Y. McDonald, Model 4602B-22 or approved equal. HDPE service lines require the anchoring of meter spreads to the floor or wall.
[Added by Ord. 2012-429, 6/7/2012, § 4; amended by Ord. 2016-465, 6/30/2016]
(2) 
The meter valve shall be located immediately inside of the structure. The valve shall be of brass, meeting or exceeding ASTM B-584. The valve shall be female iron pipe thread on the outlet side, with the inlet side flared. The valve shall open counterclockwise.
(3) 
The valve shall be manufactured by legend valve, model T-441/T-442 or approved equal.
Y. 
Water Pressure Reducing Valve.
(1) 
The valve shall be suitable for maximum line pressure of 300 psi with a built-in bypass, manufactured in accordance with ASSE 1003-1 and have a delivery pressure of 50 to 60 psi.
[Amended by Ord. 2010-403, 10/7/2010]
(2) 
The pressure reducing valve shall be manufactured by watts regulator series 25AUB or an approved equal.
Z. 
Backflow Preventor.
(1) 
All domestic services shall include a backflow prevention device. All backflow devices shall be tested upon initial installation, repair and/or replacement by a Pennsylvania State ASSC certified inspector. Test forms are available through the Township. All inspectors shall be registered with the Township.
[Amended by Ord. 2010-403, 10/7/2010; and by Ord. 2012-429, 6/7/2012, § 4]
(2) 
Residential and multifamily services shall use a double check valve assembly. The double check valve shall be a Watts No. 007 or an approved equal.
(3) 
All fire line services require the use of a double detector check backflow assembly as manufactured by Watts, Series 709. All backflow devices shall be tested upon initial installation, repair and/or replacement by a Pennsylvania State ASSC certified inspector. Test forms are available through the Township. All inspectors shall be registered with the Township.
[Amended by Ord. 2012-429, 6/7/2012, § 4]
(4) 
All irrigation services shall require the use of a reduced-pressure backflow assembly (RPBA) as manufactured by Watts Series 909 or approved equal. All backflow devices shall be tested upon initial installation, repair and/or replacement by a Pennsylvania State ASSC certified inspector. Test forms are available through the Township. All inspectors shall be registered with the Township.
[Added by Ord. 2012-429, 6/7/2012, § 4]
AA. 
Water Meter Pits and Vaults.
(1) 
For services that require more than one union or utilize ductile iron pipe and measures over 400 feet from the public right-of-way to the structure, a meter pit or meter vault shall be required. The costs associated with the meter pit/meter vault is the responsibility of the applicant requesting service. The meter pit/meter vault shall not be located within the public right-of-way. The meter pit and/or meter vault shall be owned and maintained by the property owner and/or the applicant requesting service. The Township shall only be responsible for the domestic meter(s).
[Amended by Ord. 2010-403, 10/7/2010; and by Ord. 2011-410, 3/3/2011, § 2]
(2) 
All mobile homes shall have a meter pit, regardless of the length of service and number of unions.
(3) 
When a meter pit/meter vault is required and the size of the domestic meter is full three-quarter-inch or one inch, an eighteen-inch diameter thermalcoil meter box is required. The meter pit shall be manufactured by Mueller/McCullough Ford Mete Box Company, A.Y. McDonald Mfg. Company or an approved equal and installed in accordance with Detail SW-24.
[Amended by Ord. 2010-403, 10/7/2010; and by Ord. 2016-465, 6/30/2016]
(4) 
For services requiring a meter 1 1/2 inch or larger, a meter vault shall be installed. The vault shall be sized by the applicant requesting service and in accordance with Detail SW-25.
(5) 
The location of the on-demand remote meter reading device shall be in accordance with Detail SW-25 or otherwise approved by the Township. A meter pit/meter vault with the on-demand meter reading device built into the lid shall be clear of all obstructions and remain accessible at all times. It is the customers' responsibility to ensure access to the device, including inclement weather. If the device is inaccessible, the customer will be notified and the obstruction removed within 48 hours.
[Amended by Ord. 2016-465, 6/30/2016]
(6) 
If a meter vault is installed, the meter spread shall be anchored and supported to the wall and/or floor. The use of concrete blocks, bricks or wood shall not be utilized in supporting the meter spread.
[Added by Ord. 2010-403, 10/7/2010]
(7) 
If a regulator is not required, a premanufactured meter idler shall be added. The idler shall conform to AWWA Standard C800 (ASTM B-62 and ASTM B-584, UNS No. C83600-85-5-5-5). The Township shall determine the location of the regulator, if required.
[Added by Ord. 2010-403, 10/7/2010]
BB. 
Pressure and Leakage Tests — Ductile Iron Pipe/Force Main.
(1) 
Water Supply for Pressure Testing.
(a) 
The contractor shall be responsible for providing the quantity and quality of water necessary for proper pressure testing of pipe. At the option of the Township, the contractor shall reimburse the Township directly for all water used, at the current usage rate.
(b) 
The contractor shall be responsible for coordinating and transporting the supply of water from the Township's existing distribution system supply points to the various pressure test locations.
(c) 
Water supply for water line testing shall be potable water. Water supply for gravity sanitary sewer, force mains or other nonpotable water lines, shall be free of sand, mud, solids, oil, acids and any other deleterious material.
(2) 
All pressure pipelines shall be tested by the contractor in a manner satisfactory to and witnessed by the Township. The contractor shall furnish all equipment, apparatus, temporary blocking, pumps, taps and gages to conduct the following tests:
(a) 
The section under test shall be filled with water and all air expelled from the line and maintained full of water for a period of not less than 24 hours.
(b) 
The pressure and leakage tests shall be conducted concurrently, and consist of raising the water pressure (based on the elevation of the lowest point of the section under test and corrected to the gage elevation) to a pressure in pounds per square inch numerically equal to 1.5 times the normal working pressure or, 50 lbs. greater than the normal working pressure of the pipe, which ever is greater, and maintaining such pressure for a period of two hours.
(c) 
For all piping at the end of the test period, the section test will be accepted if the total leakage is not greater than 10 gals/inch dia/mile/24 hours. Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe, or any valve section thereof, to maintain pressure after the pipe has been filled with water and the air in the pipeline has been expelled.
L = S D ÷ P\133,200
Where:
L
Allowable leakage in gallons per hour
D
Nominal diameter of pipe in inches
P
Average test pressure in pounds per square inch gauge
S
Length of pipe in feet
(3) 
If the section fails to pass the pressure and leakage tests, the contractor shall do everything necessary to locate, uncover and repair or replace the defective pipe, fittings or joints; all at his own expense and without extension of time for completion of the work. Additional test and repairs shall be made until the section passes the specified test.
(4) 
All visible leaks are to be repaired regardless of whether or not the pipe meets the test requirements.
(5) 
All testing shall be made from valve to valve (maximum) throughout the system to insure the proper operation of each valve.
CC. 
Disinfection.
(1) 
All potable water lines and piping shall be sterilized by the use of chlorine or chlorine compound tablets in such amounts as to produce a concentration of 50 mg/l. Chlorinated water shall be retained in the pipe long enough to destroy all nonspore forming bacteria. This period shall be at least 24 hours and preferably longer, as may be directed. After the chlorinated water has been retained for the required time, disinfection shall conform to AWWA Standard C-651, Standard for Disinfecting Water Mains.
(2) 
Following disinfection, all treated water shall be thoroughly flushed from the pipe until the water through its entire length shall, upon test, be proven bacteriologically safe. The water line shall remain off during this period.
(3) 
Contractor shall be responsible for properly disposing of all chlorinated water in accordance with all local, state and federal regulations.
(4) 
The following number of 5g tablets shall be placed in each 18 feet length of pipe:
Diameter Pipe, Inches
Number of 5g Tablets per 18 ft. Length of Pipe
4
1
6
1
8
2
10
3
12
4
16
6
(5) 
The tablets shall be attached to the top of the inside of the pipe by utilizing an adhesive material that is approved for contact with potable water under the requirements of NSF Standard 61. Filling of the completed pipe line with water shall be accomplished at a rate which will assure a maximum velocity of one foot per second so that the tablets do not become displaced. Retention time after filling of the main, to accomplish disinfection, shall be a minimum of 24 hours.
(6) 
After the time of retention has been achieved, the water shall be flushed from within the pipe until chlorine concentrations are no higher than 1.0 p.p.m.
(7) 
The Township will employ a competent independent commercial testing laboratory to perform bacteriological tests to assure the effectiveness of the disinfection operations. At least one sample shall be obtained from each end of the constructed pipe lines and branches and such additional samples as directed by the Township. All sampling and analyses shall be performed in accordance with the procedures set forth in standard methods and in AWWA C-601.
DD. 
Contractor Not to Operate Existing Valves and/or Other Existing System Appurtenances. The contractor shall schedule and coordinate all construction activities and shall cooperate with the Township's operating personnel such that a minimum of interrupted service results. The contractor shall not operate existing system valves, hydrants or other appurtenances at any time, but when the same is needed to facilitate and accommodate construction, the contractor shall request such operation from the Township. The contractor shall provide the Township with reasonable advance notice for such assistance, however.
EE. 
Water Lines to Be Abandoned. All existing water lines that are designated to be abandoned shall be removed, capping or plugging the existing line(s) shall not be permitted. All valves, fittings and pipe shall be removed and disposed of at the contractor's expense.
FF. 
Abandoning Taps. When a domestic service line/tap or a testing port, two inches and smaller in diameter, will be abandoned, the corporation stop shall be removed from the water main. A plug shall be installed. The plug shall be brass, with a square head and shall have AWWA tapered threads. The plug shall be Mueller H-1003, or approved equal. The plug shall be concrete encased.
[Amended by Ord. 2014-440, 1/30/2014]
GG. 
Abandoning Service Lines Larger than two inches. When a service line (fire, domestic or temporary) is abandoned, the service line shall be disconnected at the water main. The main line tee or the tapping valve shall be plugged. A Class 350, mechanical joint plug shall be installed with blocking and anchoring. The tapping valve shall remain closed. Any fire hydrants removed from service shall be returned to the Township.
HH. 
Pipe Soldering.
[Added by Ord. 2011-410, 3/3/2011, § 2]
(1) 
Solder fittings shall not be utilized within a meter spread, meter pit, meter vault or any location prior to the downstream meter spread isolation valve.
(2) 
All fittings prior to the outlet/discharge side of the isolation valve shall be threaded fittings or compression fittings only.
[Ord. 96-273, 9/5/1996; as amended by Ord. 99-298, 10/6/1999 §§ 4-5; and by Ord. 2005-362, 12/15/2005]
1. 
Sidewalks (Concrete).
[Amended by Ord. 2006-372, 5/4/2006, §§ 4, 9]
A. 
Slope separation. All sidewalks shall be separated from downgrade slopes that are steeper than 3h:1v by guiderail, fencing, a five-foot grading strip that is no steeper than 10h:1v, or shrubbery as approved by the Township Engineer in conjunction with the Township Manager.
B. 
Sidewalks (Concrete). All sidewalks shall be constructed in accordance with the following standards and as illustrated in RD-09, Typical Sidewalk Detail, or SD-09, Concrete Walk\Vert Curb\Bituminous Paving Section, Typical Road Section. Ramps for the physically challenged shall be provided at intersections and crosswalks.
2. 
Walkways.
A. 
Minimum width. Walkways shall be a minimum of four feet wide unless specified otherwise in § 17-401 or Chapter 27.
[Amended by Ord. 2006-372, 5/4/2006, § 9]
B. 
Height. Walkways in relation to parking lots and driveways shall be raised to the same height as sidewalks in relation to streets. See RD-04, Typical Road Section, and SD-09, Concrete Walk\Vert Curb\Bituminous Paving Section.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
3. 
Multipurpose Walking and Biking Paths.
A. 
Minimum width: six feet.
B. 
Material: asphalt paving or other material approved by the Township.
[Ord. 96-273, 9/5/1996]
1. 
General Requirements. All driveways shall be located, designed, constructed, and maintained in such a manner as not to interfere or be inconsistent with the design, maintenance and drainage of the street.
2. 
General Location Restrictions. Access driveways shall be permitted at locations in which:
A. 
Sight distance is adequate to safely allow each permitted movement to be made into or out of the access driveway.
B. 
The free movement of normal highway traffic is not impaired.
C. 
The driveway will not create a hazard.
D. 
The driveway will not create an area of undue traffic congestion on the highway.
E. 
Residential Driveway (SD-01). Within the right-of-way of Township streets, residential driveways shall be constructed in accordance with SD-01, Residential Driveway Detail.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
3. 
Grade. Driveways shall be constructed to conform to the grade of the finisher shoulders. All descending or ascending grades of driveways shall begin at the street right of way. No stormwater shall be permitted to drain onto Township roadways.
[Ord. 96-273, 9/5/1996; as amended by Ord. 2001-316, 9/9/2001, § 15]
1. 
Minimum Paving Standards.
A. 
For driveways and parking areas for single family — None.
B. 
For all driveways and parking areas other than single family shall have an aggregate base course, a bituminous hinder course and a bituminous wearing course with sufficient structural strength to carry anticipated wheel loads.
2. 
Parking Area Standards.
A. 
Slopes.
(1) 
Maximum 5% cross slope (along length of vehicle).
(2) 
Maximum 7% longitudinal slope (perpendicular to vehicle).
(3) 
Minimum 1% cross slope or longitudinal slope.
B. 
Concrete Mountable Curbs (SD-05). When required, mountable curbs shall be constructed to the standard in SD-05.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
(1) 
Curb Detail (SD-12). When required, curbs shall be constructed to the standard in SD-12.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
C. 
Curb Ramps. The location and design of all curb ramps for access by disabled persons shall be approved by the Engineer. Such approval does not represent compliance with the Accessibility Guidelines of the Americans with Disabilities Act.
D. 
Accessible Parking Sign (SD-11). Parking spaces required or designated to be accessible for the physically challenged shall be identified by the installation of an accessible parking sign meeting the requirements of SD-11, Typical Accessible Parking Sign.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
E. 
Concrete Curb and Gutter (SD-16). When required, concrete curb and gutter shall be constructed to the standard in SD-16.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
F. 
Slope separation. All parking areas shall be separated from downgrades that are steeper than 3h:1v by guiderail or a ten-foot grading strip that is no steeper than 10h:1v.
[Added by Ord. 2006-372, 5/4/2006, § 10]
[Ord. 96-273, 9/5/1996; as amended by Ord. 99-298, 10/6/1999, § 6]
All guide rails shall be constructed in accordance with current PennDOT criteria.
[Ord. 96-273, 9/5/1996; as amended by Ord. 2004-350, 6/3/2004, § 6]
1. 
General Conditions.
A. 
All street excavation within Township rights-of-way or easements shall require a road opening permit.
B. 
No street opening shall extend across more than half of the cartway at a time. No street shall be closed at any time without prior approval from Cranberry Township.
C. 
Through way traffic should be maintained whenever possible.
D. 
Access to driveways and/or buildings located within the work zone shall be maintained at all times.
E. 
No more than 250 linear feet of excavation shall be opened at any one time.
F. 
Traffic control shall be maintained in accordance with Pennsylvania Department of Highways Publication 203. The permittee shall furnish and maintain such signs, barricades, lights and flag persons as may be necessary to provide a safe and compliant work zone. The Township may require a separate traffic control plan under special circumstances.
G. 
Provisions shall be made to accommodate stormwater runoff at all times. The work shall not be permitted to interfere with the normal flow of surface or subsurface water.
H. 
Future maintenance of any area disturbed as a result of the installation shall be the responsibility of the permittee during the first two years after completion.
2. 
Pavement Cuts. Open cutting of any road surface is not permitted unless authorized by the Township Engineer.
A. 
Cuts in the bituminous surface shall be a neat straight line the entire length and width of the trench using a concrete saw. Cuts through cement concrete shall be made to a sufficient depth to enable the removal of the concrete in a clear straight break.
B. 
All excavated material should be stored in such a manner as to not interrupt pedestrian or automobile traffic. Pedestrian crosswalks and sidewalks shall be kept clear at all times. Loose material shall be promptly cleaned from the streets and sidewalks using appropriate measures.
C. 
Special backfill requirements may be set by the Township Engineer. Backfill requirements will be determined at the time of application.
D. 
Restoration of Asphalt Pavement.
(1) 
Temporary pavement shall consist of the appropriate compacted backfill material and topped with not less than eight inches of cold patch. The temporary pavement shall be replaced with the permanent repair immediately upon suitable weather conditions or the work is completed.
(2) 
Permanent repair shall be in accordance with Detail RD-13.
3. 
Opening of Berm or Yard Areas (RD-15).
A. 
All work performed in areas other than the improved surface (asphalt or concrete) shall be performed in compliance with (Detail RD-15).
B. 
All disturbed yard areas shall be restored to original condition.
[Ord. 96-273, 9/5/1996; as amended by Ord. 99-298, 10/6/1999, §§ 7-8; by Ord. 2000-306, 8/3/2000, §§ 11-12; by Ord. 2001-316, 9/9/2001, § 13; by Ord. 2002-331, 6/26/2002, § 8; by Ord. 2003-339, 4/1/2003, §§ 5-6; by Ord. 2004-350, 6/3/2004, §§ 7, 8; by Ord. 2005-362, 12/15/2005; and by Ord. 2006-372, 5/4/2006, § 11]
1. 
Monuments and Markers. A table of existing monument locations are listed in Appendix D.
A. 
Monuments. All developments shall be required to place at least two new monuments. All new monumentation shall be located in open space areas with clear views to the atmosphere for GPS uses. The monuments shall be a Berntsen sectional rod monument 5/8 inch diameter or equal so as to accept a Cranberry Township monument cap and bench mark access cover in accordance with SD-18. All new monumentation shall be tied to an existing Cranberry Township monument and locational information included on the as-built drawings. Monuments shall be accompanied by a letter of certification from a professional land surveyor.
B. 
Markers. Markers shall be iron pins or pipes at least 1/2 inch in diameter and not less than 20 inches in length, and markers shall be located on all point of curves and point of tangent or roadway. Markers must be stable in all three dimensions.
2. 
Detection. Monuments and markers shall be detectable with conventional ferrous metal or magnetic locators.
3. 
Submission Requirements. No private or public improvements shall be accepted by the Township until all required monuments have been set and as-built drawings have been submitted and certified by a professional land surveyor, three paper copies (24 inches by 36 inches), and one Mylar copy. All as-built drawings shall be submitted electronically in accordance with the digital submission requirements (§ 17-409.3.B).
A. 
The following language shall be included on all as-built drawings:
I, ____________________ a registered professional land surveyor of the Commonwealth of Pennsylvania do hereby certify to the best of my knowledge, information and belief that this plan of subdivision and/or land development, meets the requirements of the Township of Cranberry's monumented grid system. The two Township control monuments used are number __________ and number as shown, and the angle of rotation to return the same back to the prevailing deed bearings is (CW-CCW) _____ degrees __________ minutes seconds. A minimum of two monuments are required to be set on the perimeter of the subdivision and/or land development with coordinates related to the Township of Cranberry monumented grid system.
Subdivision/Land Development
Subdivision/Land Development
Monument No. 1
Monument No. 2
Type __________
Type __________
North __________
North __________
East __________
East __________
B. 
Digital Submission Requirements. All as-built drawings submitted digitally shall meet the following standards.
(1) 
Data Integrity. All data submitted shall be in compliance with the "Manual of Practice for Professional Land Surveyors in the Commonwealth of Pennsylvania."
(2) 
Data Layering. Digital submissions shall have all layers clearly and separately represented. Included with all digital submissions a document shall be included outlining the following.
(a) 
A list of all layers used with a description of what those layers represent.
(b) 
A list of all point files and break lines with a description of any abbreviations.
(c) 
Coordinate System. All as-built drawings must be in PA State plane projection, PA South Zone, NAD83 datum. Units shall be in US feet.
(d) 
Format. All as-built drawings must be submitted in AutoCAD drawing (.dwg) or AutoCAD interchange (.dxf) format on either 3.5-inch floppy disk or CD-ROM.
(3) 
Coordinate System. All drawings must be in PA Stateplane project, PA South Zone, NAD83 datum. Units shall be in US feet. Cranberry Township's ground coordinate system is available.
4. 
As-Built Drawings. As-built drawings shall include, but need not be limited to the following items.
A. 
All stormwater management facility(s) as-built requirements are referenced in § 17-402.7.D(18).
B. 
Commercial and residential requirements as set forth in Appendix B.
C. 
All stormwater management facility(s) as-built requirements are referenced in § 17-402.7.D(18).
D. 
The professional land surveyor's certificate shall read as follows:
I, ____________________ a registered professional surveyor of the Commonwealth of Pennsylvania do hereby certify that this plan is prepared from a field survey made on this _____ day of, 20 _____ and it represents the location of structures, driveways, parking areas, landscaping, monuments, markers, roads, easements, property boundaries, water lines, sanitary sewer lines, stormwater facilities and elevations of the stormwater detention basin and its associated facilities as shown thereon by me for the owners or agents.
(SEAL)
Registration No.
Date
E. 
As-built drawings should also include items identified in § 17-409.3.A.
[Ord. 96-273, 9/5/1996; as amended by Ord. 99-298, 10/6/1999, § 9; by Ord. 2003-339, 4/1/2003, §§ 7-9; and by Ord. 2004-350, 6/3/2004, § 14]
1. 
All installations, locations and materials shall comply with Township and PennDOT standards.
A. 
Traffic/regulatory sign details and procedures.
(1) 
Stop signs.
(2) 
Speed limit signs (25 mph, unless noted).
(3) 
No outlet signs.
(4) 
Yield signs.
(5) 
Weight, size and load restrictions.
(6) 
Turning restrictions.
(7) 
Stopping, standing and parking restrictions.
(8) 
Hazardous grade speed limits.
(9) 
No passing zones.
(10) 
No turns on red restrictions.
(11) 
Removal of traffic hazards.
(12) 
School zones and school zone speed limits.
(13) 
Special speeds on bridges or elevated structures.
(14) 
Creation of one-way streets.
(15) 
Private drives.
2. 
All traffic control signs (other than street name signs) must use the following specifications:
A. 
One sign per post.
B. 
Must use a galvanized two-inch square post breakaway system or other system approved by the Engineer.
[Amended by Ord. 2014-440, 1/30/2014]
C. 
Ten-foot long galvanized steel posts.
D. 
Three-foot counter sink posts minimum four inches exposed maximum six inches exposed.
E. 
Break away hardware.
F. 
Theft proof nuts and bolts.
G. 
All traffic control signs must be at least seven feet to the bottom of the sign and two feet to five feet behind the curb but not behind sidewalk, if a sidewalk is installed.
H. 
Signs, when not at an intersection should be placed between lots, on lot lines.
I. 
Arrows indicate flow of traffic.
J. 
All signs shall be Type 3 high-intensity sheeting.
[Added by Ord. 2006-372, 5/4/2006, § 12]
3. 
Street Name Signs.
A. 
Developers may order street signs, through the Township, using attached form. See SD-14.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
B. 
The standard Cranberry Township street sign will have the following specifications.
(1) 
The street name shall appear on street name signs in capital letters six inches high.
(2) 
Prefixes such as "north" shall be abbreviated to N.
(3) 
Suffixes such as "drive" shall be abbreviated to DR.
(4) 
Prefixes and suffixes shall be four inches high.
(5) 
The street name sign shall have 3M, or equal white reflective lettering, on 3M 7725-58, or equal cranberry/burgundy background.
(6) 
Signs shall be mounted on nine-inch wide extruded aluminum blanks pre-drilled to accept vandal proof hardware.
(7) 
Required length of sign shall be determined by the road name.
(8) 
Post brackets and cross brackets for mounting the signs must have a 12 inch long slot for securing the signs and also be drilled to accept vandal proof hardware.
(9) 
The vandal-proof hardware shall consist of bolts with a 12 pt socket head.
(10) 
Sign post shall be a galvanized two-inch square post breakaway system.
[Amended by Ord. 2014-440, 1/30/2014]
C. 
Location.
(1) 
All street name signs should be located on the corner opposite of where a stop sign will be.
(2) 
Posts must be embedded in 24 inches to 30 inches of concrete and two feet to five feet behind the curb but not behind the sidewalk, if a sidewalk is installed.
D. 
Developers may install custom made street name signs. The specifications shall be as follows:
(1) 
Letter height must be six inches minimum for upper case letters and 4 1/2 inches for lower case.
(2) 
Letter width must be one inch minimum.
(3) 
Letter stroke width must be 3/4 inch minimum.
(4) 
Letter color must be white reflective material.
(5) 
The background color must be contrasting from that of the letters.
* Note: All custom made street name signs shall be the responsibility of the respective homeowners association or private entity and shall be identified in their documents. In the event that a custom made sign, for any reason, may need replaced, it shall be replaced in a reasonable amount of time or the Township may replace it with a standard Cranberry Township sign. If custom made signs are utilized, a street sign agreement shall be in place prior to Township acceptance of the streets.
E. 
Type of Installation Required.
(1) 
Four-way signs shall be installed at all intersections where at least one of the connecting roads are through ways that lead to another street. If one of the streets has no outlet, then only a two-way sign shall be required.
(2) 
Two-way signs shall be installed at intersections where none of the streets are through ways that lead to another street.
F. 
Private Drives. For streets that are private, they may be noted as such with a "Private Drive" sign at the entrance to each street. The specification shall be as follows:
(1) 
"Private Drive" street signs conform to § 17-414.B and the following:
(a) 
Letter height must be five inches minimum for upper case letters and four inches for lower case.
(b) 
Letter width must be 1 1/2 inches minimum.
(c) 
The background color must be contrasting from that of the letters.
* NOTE: All "Private Drive" street signs shall be the responsibility of the respective homeowners association or private entity and shall be identified in the their documents. Additionally, the Township may at its discretion install and maintain "Private Drive" signs.
4. 
The developer shall install the following signage at the entrance(s) to every plan.
[Amended by Ord. 2006-372, 5/4/2006; and by Ord. 2014-440, 1/30/2014]
A. 
A "No Street Parking by Cranberry Township Ordinance" sign.
(1) 
One sign must be installed within the first 100 feet of the entrance(s) to every development on the right-hand side of the street for developments that do not permit on-street parking.
(2) 
The sign design must be provided using specifications below (i.e., red lettering on reflective white background). See SD-13.
(a) 
Sign dimensions are 24 inches wide and 30 inches in height.
(b) 
The background must be white and be reflective.
(c) 
The lettering must be red.
(d) 
The sign must be outlined in red, which is to be five-eighths-inch stroke width.
(e) 
The lettering for "No Street Parking" is to be four inches in height and five-eighths-inch stroke width.
(f) 
The lettering for "by Cranberry Township Ordinance" is to be two inches in height and three-eighths-inch stroke width.
(g) 
Sign Layout.
1) 
The sign layout for plans that do not utilize designated on-street parking shall be shown on SD-13.
2) 
The sign layout for plans that do utilize designated on-street parking shall be shown on SD-13A.
B. 
"No Outlet" Sign, as applicable.
(1) 
One "No Outlet" sign shall be installed at the entrance to every plan that has only one ingress/egress location.
(2) 
Any required "No Outlet" sign shall be placed a minimum distance of 100 feet following any required "No Street Parking by Cranberry Township Ordinance" sign.
(3) 
Any required "No Outlet" sign shall be placed between lots, on lot lines, when possible.
C. 
Speed Limit Sign.
(1) 
The speed limit sign shall be 25 MPH unless otherwise noted.
(2) 
One speed limit sign shall be installed at the entrance to every plan.
(3) 
A speed limit sign shall be placed a minimum of 100 feet following other required entrance signs.
(4) 
Speed limit signs shall be placed between lots, on lot lines when possible.
(5) 
Additional speed limit signs shall be placed in a plan in accordance with Township and PennDOT standards.
5. 
Pedestrian Signage.
[Added by Ord. 2014-440, 1/30/2014[1]]
A. 
Crosswalks at Nonsignalized Intersections.
(1) 
Use the "Pedestrian Crossing" (W11-2) sign with the Diagonal Downward Pointing Arrow (W16-7P) plaque immediately at the crossing of noncontrolled approaches to an intersection. In addition, locate a "Yield Here to Pedestrian" sign with a right or left arrow (R1-5L or R1-5R) at the yield line.
B. 
Crosswalks at (Nonsignalized) Midblock Locations.
(1) 
Use the "Pedestrian Crossing" (W11-2) sign with the Diagonal Downward Pointing Arrow (W16-7P) plaque immediately at the crossing of noncontrolled approaches to an intersection. In addition, locate a "Yield Here to Pedestrian" sign with a right or left arrow (R1-5L or R1-5R) at the yield line.
(2) 
An advance "Pedestrian Crossing" (W11-2) sign with an AHEAD or a distance supplemental plaque shall be used on the approach to the same crosswalk.
C. 
The W11-2 signs and their related supplemental plaques shall have a florescence yellow-green background with a black legend and border.
D. 
The advance signage shall not block the road user's view of the W11-2 sign.
E. 
Crosswalk markings shall be placed and designed in accordance with Township and PennDOT standards.
[1]
Editor's Note: This ordinance also provided for the renumbering of former Subsection 5 as Subsection 6.
6. 
Final Approval.
A. 
All identification and traffic warning and regulatory signage must be installed prior to the Township issuing any building permits.
B. 
Bonds shall not be released for the streets until all signage installations receive final approval from the Township Engineering Department.
C. 
When all signs have been installed, the developer must request the project manager to review the installations. The project manager will give written acceptance/denial. (A copy must go to the plan file and project manager.)
D. 
All developers must purchase and install all signs. The Township will not order, pay for, receive, store or install any signs, posts, etc., for the developer.
* Note: All PennDOT Publications can be obtained from:
PA Department of Transportation
Publication Sales Store
P.O. Box 2028
Harrisburg, PA 17105-2028
[Ord. 96-273, 9/5/1996; as amended by Ord. 2004-350, 6/3/2004, § 15; Ord. 2005-362, 12/15/2005; and by Ord. 2006-372, 5/4/2006, § 4]
All street lighting shall be installed in compliance with Township standards for work in Township rights-of-way. (See SD-06.) A street lighting agreement between the Township and the association or private entity shall be provided prior to road occupancy permit issuance.
[Ord. 96-273, 9/5/1996; as amended by Ord. 2004-350, 6/3/2004, § 16; and by Ord. 2005-362, 12/15/2005]
1. 
Street Tree Planting Specifications. Trees shall be of substantially uniform size and shape, and have straight trunks. Trees shall be properly planted and staked and provision made by the developer for regular watering and maintenance until the development is complete, and Township acceptance of streets. Dead and dying trees shall be replaced by the developer during the next planting season after the initial planting. The following standards shall be used during planting as approved by the Engineer.
[Amended by Ord. 2006-372, 5/4/2006, § 4]
A. 
(SD-02) Evergreen/deciduous tree planting detail – See SD-02.
B. 
(SD-03) Shrub planting detail – See See SD-03.
2. 
Landscape Island Maintenance. A landscape maintenance agreement shall be in place for island areas in Township or PennDOT rights-of-way if requested by the Township.
[Ord. 96-273, 9/5/1996]
The maximum allowable slope on an embankment shall be z horizontal:1 vertical (ratio). All embankments steeper than z:1 shall require a retaining system.
[Ord. 96-273, 9/5/1996; as amended by Ord. 99-298, 10/6/1999, §§ 10-12; by Ord. 2000-306, 8/3/2000, §§ 13-19, 21-24; by Ord. 2001-316, 9/9/2001, §§ 16-20; by Ord. 2002-331, 6/26/2002, §§ 9-10; by Ord. 2003-339, 4/1/2003, §§ 10-21; by Ord. 2004-350, 6/2/2004, §§ 18, 19; by Ord. 2005-362, 12/15/2005; by Ord. 2006-372, 5/4/2006, § 13; and by Ord. 2010-403, 10/7/2010]
1. 
Traffic Signal Installation.
A. 
All Cranberry Township Signal Installation Details shall conform to all current PennDOT Publication 408 details and TC-8800 series traffic signal details.
[Amended by Ord. 2014-440, 1/30/2014]
B. 
All traffic signal installations, upgrades or modifications shall be submitted for approval to the Cranberry Township Engineering Department for review prior to submission to PennDOT. A copy of all equipment submittals and shop drawings shall also be submitted. All PennDOT submissions shall be made through the Township Engineering Department.
C. 
Format for all submittals shall include:
(1) 
For permit review: two full-sized sets of permit drawings and electronically via AutoCAD.
(2) 
For construction: one full-sized set, two half-sized sets and electronically via AutoCAD.
(3) 
On completion, as-built drawings will be required: two full-sized sets, two half-sized sets and electronically via AutoCAD.
D. 
All meetings, inspections and site visits relevant to any traffic signal installation, modification or upgrade shall be scheduled through the Cranberry Township Traffic Operations Department at 724-776-4806, extension 1507.
E. 
Cranberry Township operates a comprehensive traffic management network that follows the NEMA TS II format. The Township subscribes to standards as approved by the International Transportation Engineers (ITE) and the International Municipal Signal Association (IMSA).
2. 
Traffic Signal Supports.
A. 
All signal supports shall be galvanized mast arm type that meet or exceed the Township Streetscape Ordinance No. 2009-394,[1] with approved anchor base foundations up to 70 feet in length. Over 70 feet shall be by approved design only. Consideration will be given to monotube design, refer to Detail RD-29.
[1]
Editor's Note: See § 27-324, Streetscape Enhancement Overlay District.
B. 
Location, orientation and size of mast arm shall be as designated on the permit plan.
C. 
Additional information required on plans include foundation elevation, sidewalk (when required) finish elevation, PA One Call design information, all overhead and underground utility information.
D. 
An additional hand-hole access for wiring shall be required opposite of all horizontal flange locations at height for the purposes of future wiring access.
E. 
Where required, vertical supports shall include overbuilds to accommodate luminaire arms; refer to Detail RD-29-A or 29-B.
[Amended by Ord. 2014-440, 1/30/2014]
F. 
All bolted connections shall be tightened to manufacturer's specifications utilizing an approved tightening method.
(1) 
Torque wrench to manufacturer's specifications.
(2) 
Turn of the nut method as set forth by ASTM-325.
3. 
Controller Assembly.
A. 
Controller Cabinet.
(1) 
The controller cabinet shall conform to all NEMS TS II Type 1 standards. The cabinet shall be of a natural brushed aluminum finish. Minimum size shall be 55 inches high by 44 inches wide by 22 inches deep (commonly referred to as “P44”), base-mounted, with a minimum twelve-inch riser. The cabinet shall be installed on a PennDOT approved concrete pad that extends an additional 48 inches out from the cabinet face. Orientation and final location of said cabinet shall be coordinated with the Cranberry Township's Traffic Operations Department. Installation shall be such as to maintain safe distance between the traveled roadway and the cabinet.
(2) 
Install a minimum of two unused spare three-inch PVC conduits for future wiring; one between the controller pad and wiring JB and one between the controller pad and the Fiber Optic JB. (Detail RD-09).
B. 
Controller Details.
(1) 
Furnish and install a fully actuated, solid state digital microprocessor type controller with menu driven prompts, internal TBC, Ethernet telemetry port for central traffic management system communications and all other accessories that are required to make the controller completely functional and operational as shown in the plans.
(2) 
The controller assembly shall include a NEMA TS2 Type A1 Controller Unit, NEMA TS2 Type 1 Configuration 3 (12 Position) Terminals and Facilities and a NEMA TS2 Type 16 Malfunction Management Unit complete in a NEMA TS2 cabinet assembly. Separate harnesses to accommodate both NEMA TS2 Type A1 and Type A2 controllers shall be included and wired directly to the main terminals and facilities. Adapter harnesses shall not be allowed. NEMA TS2 BIUs and a cabinet power supply shall be provided as needed.
(3) 
The controller unit shall be manufactured by Econolite Control Products of Anaheim, CA, and be current with Cranberry Township’s operating standards. Contact the Traffic Operations Department for current details.
[Amended by Ord. 2012-429, 6/7/2012; and by Ord. 2014-440, 1/30/2014]
(a) 
Load switches and flash transfer relays shall be supplied in sufficient quantity to perform the operation as shown in the plans. The load switches provide indicators on both the inputs and outputs of each circuit.
(b) 
The controller unit shall be sixteen-phase fully actuated and shall meet all requirements for a NEMA TS2 Type 1 including SDLC (Port 1), RS-232 (Port 2) and FSK (Port 3) ports. The controller shall also include a 10/100 BaseT Ethernet port and data key to maintain back-up timing.
(c) 
A NEMA TS2 Type 16 Malfunction Management Unit shall be provided and shall include an LCD display and a 10/100 Ethernet/IP port. An SDLC cable assembly shall be provided to connect Port 1 of the controller to Port 1 of the MMU. This will enable the advanced error checking, event reporting and logging features as defined by NEMA. The MMU shall pass all tests as performed by an automatic monitor tester. Test results shall be printed and supplied with each cabinet. Connect the MMU to the optical ethernet transceiver using properly rated CAT5E cables with RJ45 connectors.
(d) 
Each cabinet shall be supplied with a NEMA TS2 Type 2 Detector Rack Configuration 2 (16 channels) minimum, or as appropriate for all necessary detection equipment supplied.
(e) 
The following switches shall be accessible via the police panel:
1) 
Signal on/off.
2) 
Flash control.
3) 
Automatic/manual transfer.
4) 
Timer reset pushbutton.
5) 
Manual pushbutton and ten-foot coiled hand cord.
(f) 
The following switches shall be mounted on a technician's switch panel on the inside of the main cabinet door.
1) 
Stop time, three-position-center off, on/controller run/normal.
2) 
Flash control.
3) 
Timer power on/off.
4) 
Pedestrian pushbutton detector test, momentary pushbutton.
(g) 
The maintenance panel and police panel shall be installed in the cabinet as a complete and independent assembly. A single multipin connector assembly shall be used to interface to the main back panel. Direct wiring from the back panel to the maintenance/police panel will not be allowed. The maintenance/police panel assembly shall be easily replaced without having to disturb any other wiring in the cabinet. The maintenance panel shall be hinged with a stainless steel hinge to the police panel to allow easy access to the wiring within the assembly.
(h) 
An LED cabinet lamp kit with door activated pushbutton shall be provided and shall consist of two LED light sources, the first mounted to the fan panel to illuminate the entire cabinet, the second mounted underneath the bottom shelf to illuminate the entire load bay area. Each light source shall be a minimum of 30 inches in length and be low profile so as not to interfere with the removal or maintenance of any cabinet equipment.
(i) 
Furnish a minimum of two copies of the cabinet wiring plan showing component layout.
(j) 
The main power surge protector shall be plug-in type, include a failure indicator and a set of dry contacts to indicate the unit has failed. The unit shall be an EDCO Model SHA1250 including base. The fail contacts of the surge protector shall be wired to an alarm input for reporting a failed device to a central computer.
(k) 
The cabinet shall be wired with a thirty-amp NEMA L1430FI flanged inlet, transfer switch and an on-line power LED-type indicator indicating line power is present. This external connection will allow for temporary connection of an emergency power source.
(l) 
The cabinet shall be fully wired to accommodate rack-mountable preemption equipment and perform the preemption sequences as specified in these plans.
(m) 
The cabinet shall contain a pull-out document drawer with hold-closed and lock-open feature. The document drawer shall measure 22 inches wide by 12 inches deep by 2.5 inches. The document drawer shall include a non-skid surface designed to support the weight of a typical laptop computer and shall be mounted below the timer shelf.
(n) 
The cabinet shall neatly house all required fiber optic equipment required to establish proper communications to the central communications server, including, but not limited to, the termination panel, patch cords, fan-out kits, connectors and optical Ethernet transceiver.
(o) 
The cabinet assembly shall be fully tested, with all components installed, at the factory prior to shipment. The controller, monitor and detectors shall be fully programmed per the plans and specifications, by a trained factory representative. The complete and fully programmed cabinet assembly shall be factory tested for a minimum of 24 hours prior to shipment. The supplier shall certify in writing that the tests have been successfully performed prior to installation in the field. All testing shall be supervised by a registered professional engineer.
C. 
Detection Equipment — Permissible Options.
(1) 
Stop Bar: programmable video type or radar.
[Amended by Ord. 2014-440, 1/30/2014]
(2) 
Advance: programmable radar type.
(3) 
System: programmable video or radar.
(4) 
Other options as approved by the Township.
D. 
Ethernet Capabilities.
[Amended by Ord. 2014-440, 1/30/2014]
(1) 
Provide hardened ethernet connections for each capable device. Include a switch approved for traffic use and all necessary wiring for the same. This item of work shall consist of furnishing and installing an industry hardened, fully managed ethernet switch providing dual gigabit fiberoptical ethernet (1,000 Base-T) ports using industry standard Lc Duplex fiberoptic connectors and eight fast ethernet (10/100 Base TX) RJ45 copper ports. The transceiver shall operate on 120 VAC, 10 watts, and shall meet and/or exceed NEMA TS2 environmental requirements.
(2) 
The fiberoptic transceiver shall interface to single-mode (8/125) fiberoptic cable with an optical wavelength of 1,310 nm using LC duplex connectors. It shall be capable of operating over a distance of at least 10 km with an optical power budget of 17 db. The transceiver shall be capable of operating in a fault-tolerant fiberoptic loop.
(3) 
Provide a transceiver that is fully compliant with IEEE 802.3, 802.3u and 802.3z. The transceiver shall provide full-duplex operation and flow control.
(4) 
Provide a simple intuitive user interface for configuration and monitoring of the transceiver via standard HTML graphical web browser, including detailed on-line help. Event logging and recording shall be included. All significant events shall be stored in a nonvolatile system log.
(5) 
The optical ethernet transceiver shall connect to all ethernet devices in the controller cabinet, including the controller (if applicable), video detection communications interface panel and video servers and any other ethernet devices using properly rated CAT5e cables with RJ45 connectors.
E. 
External Communications Connection.
[Amended by Ord. 2014-440, 1/30/2014]
(1) 
Each intersection shall be equipped with any and all peripheral equipment necessary to communicate into the existing Cranberry Township communications network. This system currently consists of an underground fiberoptic network utilizing a communication-style duct bank of 1.25 inch quad direct burial conduit (Detail RD-14). Typical intersection will include a working installation of single-mode and/or multi-mode cables patched and/or spliced into operation utilizing the latest edition of ANSI/ICEA standards for compliance. Any and all fiberoptic work shall be coordinated through Cranberry Township's Traffic Operations Department (724-776-4806, extension 1507). Coordination includes but is not limited to planning, design, installation, termination and testing of any communication wiring or cabling.
(2) 
Underground vaults utilized for these installations shall be a minimum of 24 inches wide by 36 inches long by 24 inches deep, constructed of fiberglass or polymer-concrete construction, with a 20,000# lid, have a Cranberry Township logo installed and be of an approved manufacturer (Detail SD-17).
(3) 
Conduit installed shall be of sufficient size and type as regulated by the NESC, ANSI/ICA standards. Minimum size for all installations shall be Schedule 40 1.25 inch quad duct or Schedule 40 three-inch PVC with a flexible inner duct installed.
F. 
Emergency Vehicle Preemption shall consist of a sound-based acoustical system capable of detecting yelp, wail and hi-lo emergency vehicle siren equipment such as is approved by PennDOT. The unit shall be programmable for frequency adjustment, distance and siren type. The unit shall be capable of storing logs of events that are retrievable via a Windows-based computer program. The computer program is to be supplied by the equipment manufacturer. The system is to include all hardware and software required to install said system in a permitted intersection. This would typically include speakers and phase selection apparatus, confirmation lights and drivers and all necessary cabinet installation wiring harnesses. Confirmation lights are to be programmed as per PennDOT specifications. Preemption equipment supplied must be compatible with all existing control equipment. Preemption confirmation lights shall be equipped with eight-inch white LED bulbs.
G. 
Power.
(1) 
All commercial electric services to signalized equipment shall be installed underground in accordance with all NEC regulations and all applicable Penn Power/First Energy installation practices. This includes but is not limited to all traffic signals, flasher installations, advance warning devices and bus and/or school zone flashers. This type of service is commonly known as a "PennDot Type-C."
(2) 
Coordination of all metered and nonmetered Penn Power accounts will be the responsibility of the Township. For coordination, please contact the Township's Traffic Operations Department.
(3) 
Expenses related to all new power services, all re-service and any modification in relation to the Penn Power Company will be the responsibility of the installation contractor. This includes all underground wiring costs, all permit fees or inspections and all power company service fees levied as a result of the project.
(4) 
Solar Power.
(a) 
Consideration shall be given to solar-powered devices where the combined working power load is less than the monthly minimum metered calculation. Solar engineering calculations shall be provided to the Township for review. These calculations should include the load to array ratio, autonomy and the loss of load probability information. The solar panel will be high-efficiency, single-crystal silicon solar cells that are laminated to glass with layers of ethylene vinyl acetate (EVA).
(b) 
The panel will be self-cleaning, impact-resistant, highly transmissive, tempered glass superstate. The panel module frame will be made of extruded, polymer-coated aluminum alloy or similar approved construction. The panel module junction box will be a UV-resistant, weatherproof wire termination system which handles No. 14 AWG to No. 8 AWG wiring. The minimum acceptable wattage of the solar panel will be 65 watts.
(5) 
Grounding. All power and cabinet grounding shall conform to the latest NEC standards. Accepted methods of ground connections will be limited to approved ground lug, high-pressure crimp or thermo-welded. All connections shall be tested and the results furnished to the Township. No connection with impedance that exceeds eight ohms resistance will be accepted.
(6) 
UPS. Uninterruptible power supplies capable of monitoring the incoming power supply and filtering the output shall be required at all intersections included in and/or slated to be part of the traffic management network. These units shall be capable of back-up power for a minimum of six hours and be included in the traffic cabinet wiring package. Battery storage vault typically designed to be located underground in a hand-hole adjacent to the controller and specifically installed for that purpose.
4. 
Traffic Signal Heads.
A. 
All traffic signal heads shall be of a yellow polycarbonate plastic polymer composition or approved equal.
B. 
All traffic signal faces including turning arrows shall be twelve-inch/three-hundred-millimeter ITE-compliant LED-type such as manufactured by Dailight - Model 433XL series or approved equal. Emergency vehicle preemption confirmation lights shall be permitted to be white eight-inch/two-hundred-millimeter LED-type.
C. 
All traffic signal heads, regardless of mounting direction, shall be equipped with black back-plates.
D. 
Pedestrian signal heads shall be single face ITE compliant countdown type, minimum 16 inches by 18 inches such as Dailight No. 4306479001X or approved equal.
5. 
Warning Devices. All traffic warning devices such as, but not limited to school zones, bus warnings, stop flashers and advance signing shall utilize LED technology for any required illumination devices. Minimum sizes shall be as per PennDOT Publication 408. Consideration shall be given to solar-powered devices on as-requested basis.
6. 
Streetlights.
[Amended by Ord. 2014-440, 1/30/2014]
A. 
All intersections shall include illumination for nighttime visibility. Design criteria should allow for general illumination levels and utilize LED or approved equal light source (King Luminaire Detail).
B. 
Install all circuit breakers as required for lighting disconnects in the power supply cabinet.
C. 
Include appropriate wiring diagrams for streetlight power, disconnects and wiring as part of the traffic signal permit wiring.
7. 
ADA Accessibility. Strict adherence to the American Disabilities Act standards shall be required at all installations. Special attention to access ramps and pedestrian activation equipment will be required. Consult with Township staff for approved device list and details.
8. 
Fiberoptic Cables and Plans.
[Amended by Ord. 2014-440, 1/30/2014]
A. 
Outdoor loose-tube (ALTOS®) all-dielectric gel-free cable, 2-288 fibers as per interconnectivity plan.
B. 
Cable shall be all-dielectric, stranded loose-tube design with dry water-blocking for outdoor duct and aerial installations in fiber counts from two to 288. Each fiber shall be distinguishable by means of color coding in accordance with TIA/EIA-598-B, "Optical Fiber Cable Color Coding." The fibers shall be colored with ultraviolet (UV) curable inks. Buffer tubes shall be made from polypropylene. Each buffer tube shall contain a water-swellable yarn or water-blocking element for water-blocking protection. The water-swellable yarn or water-blocking element shall be nonnutritive to fungus, electrically nonconductive and homogeneous. It shall also be free from dirt or foreign matter. This yarn or water-blocking element will preclude the need for other water-blocking material; the buffer tube shall be gel-free. The optical fibers shall not require cleaning before placement into a splice tray or fan-out kit. The buffer tube shall be manufactured to a nominal diameter of 2.5 mm or 3.0 mm, regardless of fiber count, to reduce the number of required installation and termination tools.
C. 
Parties should consult with Cranberry Township's Traffic Operations Department for specific Fiberoptic Plan Details.
9. 
Traffic Pole Specifications. Context Sensitive mast arms are required for all new and modified signal installations.
[Amended by Ord. 2014-440, 1/30/2014]
A. 
Traffic supports shall be designed in accordance with 2001 AASHTO (American Association of State Highway and Transportation Officials) criteria for a wind zone of 80 miles per hour with a thirty-percent gust factor. Signal loading for design purposes will be per PennDOT standard loadings as shown in the Commonwealth of Pennsylvania's TC-8800 Series Traffic Standards, as well as the Department's "Criteria for the Design and Construction of Traffic Related Structures" and with the actual plan loadings. Materials and workmanship will be in accordance with Publication 408. Design calculations and drawings bearing the stamp of a professional engineer registered in the Commonwealth of Pennsylvania certifying that these designs meet these requirements shall be provided by the manufacturer.
B. 
The pole and arm shaft shall be fabricated from commercial-quality hot rolled steel. The shaft shall have only one longitudinal, automatically, electrically welded joint and shall have no intermediate horizontal joints or welds. Only one length of steel sheet shall be used, which shall be formed into a continuously tapered shaft, having a taper of approximately 0.14 inch per foot.
C. 
Poles shall meet design criteria as specified by Cranberry Township's Streetscape Ordinance as follows: fluted uprights, straight mast arms, finials and caps and decorative bases (see Detail RD-29A or RD-29B for specific details) or approved equal.
D. 
The pole manufacturer shall be PennDOT approved Publication 35, Bulletin 15, listed for the manufacture of traffic signal poles. All welding is to be performed in accordance with the requirements of AWS D1.1 in a shop certified to the American Institute of Steel Construction (AISC) Simple Bridges. The shop shall all be certified ISO 9001.
E. 
Poles, arms and other structural steel items shall be hot-dipped galvanized to the requirements of ASTM A123. All exterior surfaces shall be powder-coated RAL 3005, cranberry color.
F. 
Pedestrian poles of matching style, sixteen-fluted and of appropriate scale will also be supplied by the mast arm manufacturer.