Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Pottstown, PA
Montgomery County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 2125, 7/14/2014]
This Part 2 shall be known and may be cited as the "Borough of Pottstown MS4 Stormwater Management Ordinance."
[Ord. 2125, 7/14/2014; as amended by Ord. No. 2217, 9/12/2022]
The governing body of the Borough of Pottstown finds that:
A. 
Inadequate management of accelerated runoff of stormwater resulting from development throughout a watershed increases runoff volumes, flows and velocities, contributes to erosion and sedimentation, overtaxes the carrying capacity of streams and storm sewers, greatly increases the cost of public facilities to carry and control stormwater, undermines floodplain management and flood control efforts in downstream communities, reduces groundwater recharge, threatens public health and safety, and increases non-point-source pollution of water resources.
B. 
A comprehensive program of stormwater management, including reasonable regulation of development and activities causing accelerated runoff, is fundamental to the public health, safety, and welfare and the protection of people of the commonwealth, their resources, and the environment.
C. 
Stormwater is an important water resource, which provides groundwater recharge for water supplies and base flow of streams, which also protects and maintains surface water quality.
D. 
Federal and state regulations require certain municipalities to implement a program of stormwater controls. These municipalities are required to obtain a permit for stormwater discharges from their separate storm sewer systems under the National Pollutant Discharge Elimination System (NPDES).
E. 
The use of green infrastructure and low-impact development (LID) are intended to address the root cause of water quality impairment by using systems and practices which use or mimic natural processes to: 1) infiltrate and recharge. 2) evapotranspire. and/or 3) harvest and use precipitation near where it falls to earth. Green infrastructure practices and LID contribute to the restoration or maintenance of pre-development hydrology.
[Ord. 2125, 7/14/2014; as amended by Ord. No. 2217, 9/12/2022]
The purpose of this Part 2 is to promote health, safety, and welfare within the municipality and its watershed by minimizing the harms and maximizing the benefits described in § 202 of this Part through provisions designed to:
A. 
Meet legal water quality requirements under state law, including regulations at 25 Pa. Code Chapter 93, to protect, maintain, reclaim, and restore the existing and designated uses of the waters of this commonwealth.
B. 
Preserve the natural drainage systems as much as possible.
C. 
Manage stormwater runoff close to the source, reduce runoff volumes and mimic pre-development hydrology.
D. 
Provide procedures and performance standards for stormwater planning and management.
E. 
Maintain groundwater recharge to prevent degradation of surface water and groundwater quality and to otherwise protect water resources.
F. 
Prevent scour and erosion of stream banks and stream beds.
G. 
Provide proper operation and maintenance of all SWM BMPs that are implemented within the municipality.
H. 
Provide standards to meet NPDES permit requirements.
[Ord. 2125, 7/14/2014; as amended by Ord. No. 2217, 9/12/2022]
The municipality also is empowered to regulate land use activities that affect runoff by the authority of the Act of July 31, 1968, P.L. 805, No. 247, the Pennsylvania Municipalities Planning Code, as amended,[1] the Borough Code, 8 Pa.C.S, § 101 et seq., as amended, and/or the Act of October 4, 1978, P.L. 864 (Act 167), 32 P.S. § 680.1 et seq., as amended, the Stormwater Management Act.
[1]
Editor's Note: See 53 P.S. § 10101 et seq.
[Ord. 2125, 7/14/2014]
All regulated activities and all activities that may affect stormwater runoff, including land development and earth disturbance activity, are subject to regulation by this Part 2.
[Ord. 2125, 7/14/2014]
Any other ordinance provision(s) or regulation of the municipality inconsistent with any of the provisions of this Part 2 is hereby repealed to the extent of the inconsistency only. It is specifically intended that this Part shall repeal, in its entirety, Ordinance No. 1977, adopted March 8, 2004, and [previously] codified in Pottstown Borough Code of Ordinances, Chapter 26, Part 2.
[Ord. 2125, 7/14/2014]
In the event that a court of competent jurisdiction declares any section or provision of this Part 2 invalid, such decision shall not affect the validity of any of the remaining provisions of this Part.
[Ord. 2125, 7/14/2014]
Approvals issued and actions taken under this Part 2 do not relieve the applicant of the responsibility to secure required permits or approvals for activities regulated by any other code, law, regulation, or ordinance.
[Ord. 2125, 7/14/2014]
Any permit or authorization issued or approved based on false, misleading or erroneous information provided by an applicant is void without the necessity of any proceedings for revocation. Any work undertaken or use established pursuant to such permit or other authorization is unlawful. No action may be taken by a board, agency or employee of the municipality purporting to validate such a violation.
[Added by Ord. No. 2217, 9/12/2022]
1. 
If the municipality determines that any requirement under this Part cannot be achieved for a particular regulated activity, the municipality may, after an evaluation of alternatives, approve measures other than those in this Part, subject to § 210, Subsection 2 to 3.
2. 
Waivers or modifications of the requirements of this Part may be approved by the municipality if enforcement will exact undue hardship because of peculiar conditions pertaining to the land in question, provided that the modifications will not be contrary to the public interest and that the purpose of the Part is preserved. Cost or financial burden shall not be considered a hardship. Modification may be considered if an alternative standard or approach will provide equal or better achievement of the purpose of the Part. A request for modifications shall be in writing and accompany the Stormwater Management Site Plan submission. The request shall provide the facts on which the request is based, the provision(s) of the Part involved and the proposed modification.
3. 
No waiver or modification of any regulated stormwater activity involving earth disturbance greater than or equal to one acre may be granted by the municipality unless that action is approved in advance by the Department of Environmental Protection (DEP) or the delegated county conservation district.