Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Bath, NY
Steuben County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
The Town Board acknowledges that, prior to construction of a WTG, a wind site assessment is conducted to determine the wind speeds and the feasibility of using particular sites. Installation of wind measurement towers, also known as meteorological ("met") towers, shall be permitted on the issuance of a wind energy permit in accordance with this article.
An application for a wind measurement tower shall include:
A. 
Applicant information. Name, address and telephone number of the applicant. If the applicant is represented by an agent, the application shall include the name, address and telephone number of the agent as well as an original signature of the applicant authorizing the representation.
B. 
Property owner information and authorization. Name, address and telephone number of the property owner. If the property owner is not the applicant, the application shall include a letter or other written permission signed by the property owner:
(1) 
Confirming that the property owner is familiar with the proposed applications; and
(2) 
Authorizing the submission of the application.
C. 
Site information. Address of each proposed tower location, including tax map section, block and lot number.
D. 
Map. A map showing proposed location of the wind measurement tower and any roads, parcel boundaries or structures within one times the height of the wind measurement tower.
A. 
Setback. The distance between a wind measurement tower and the property line shall be at least one times the height of the wind measurement tower. Sites for a wind measurement tower can include more than one piece of property and the requirement shall apply to the combined properties. Exceptions for neighboring property are also allowed with the consent of those property owners.
B. 
Permit duration. Wind energy permits for wind measurement towers may be issued for a period of up to two years. Permits shall be renewable upon application to the Town Board.