Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Hellertown, PA
Northampton County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
A. 
All regulated activities in the Borough shall be subject to the stormwater management requirements of this chapter.
B. 
Storm drainage systems shall be provided to permit unimpeded flow in natural watercourses except as modified by stormwater detention facilities, pipe systems or open channels consistent with this chapter.
C. 
The existing locations of concentrated drainage discharge onto adjacent property shall not be altered without written approval of the affected property owner(s).
D. 
Areas of existing diffused drainage discharge onto adjacent property shall be managed such that, at minimum, the peak diffused flow does not increase in the general direction of discharge, except as otherwise provided in this chapter. If diffused flow is proposed to be concentrated and discharged onto adjacent property, the developer must document that there are adequate downstream conveyance facilities to safely transport the concentrated discharge to the point of predevelopment flow concentration, to the stream reach, or otherwise prove that no harm will result from the concentrated discharge. Areas of existing diffused drainage discharge shall be subject to any applicable release rate criteria in the general direction of existing discharge whether they are proposed to be concentrated or maintained as diffused drainage areas.
E. 
Where a site is traversed by watercourses other than those for which a one-hundred-year floodplain is defined by the Borough, there shall be provided drainage easements conforming substantially with the line of such watercourses. The width of any easement shall be adequate to provide for unimpeded flow of storm runoff based on calculations made in conformance with § 378-17 for the one-hundred-year return period runoff and to provide a freeboard allowance of 1/2 foot above the design water surface level. The terms of the easement shall prohibit excavation, the placing of fill or structures, and any alterations which may adversely affect the flow of stormwater within any portion of the easement. Also, periodic maintenance of the easement to ensure proper runoff conveyance shall be required. Watercourses for which the one-hundred-year floodplain is formally defined are subject to the applicable Borough floodplain regulations.[1]
[1]
Editor's Note: See Ch. 204, Flood Damage Prevention.
F. 
When it can be shown that, due to topographic conditions, natural drainage swales on the site cannot adequately provide for drainage, open channels may be constructed conforming substantially to the line and grade of such natural drainage swales. Capacities of open channels shall be calculated using the Manning Equation.
G. 
Post-construction BMPs shall be designed, installed, operated and maintained to meet the requirements of the Clean Streams Law[2] and implementing regulations, including the established practices in 25 Pa. Code Chapter 102 and the specifications of this chapter, to prevent accelerated erosion in watercourse channels and at all points of discharge.
[2]
Editor's Note: See 35 P.S. § 691.1 et seq.
H. 
No earth disturbance activities associated with any regulated activities shall commence until approval by the Borough of a plan which demonstrates compliance with the requirements of this chapter.*
I. 
Techniques described in Appendix D (Low-Impact Development)[3] of this chapter are encouraged because they reduce the costs of complying with the requirements of this chapter and the state water quality requirements.*
[3]
Editor's Note: Appendix D is included at the end of this chapter.
J. 
Infiltration for stormwater management is encouraged where soils and geology permit, consistent with the provisions of this chapter and, where appropriate, the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix B.[4] Infiltration is encouraged for capturing and treating the water quality volume (as calculated in § 378-14), any part of the water quality volume, or for otherwise meeting the purposes of this chapter.
[4]
Editor's Note: Appendix B is included at the end of this chapter.
The following permit requirements apply to certain regulated and earth disturbance activities and must be met prior to commencement of regulated and earth disturbance activities, as applicable:
A. 
All regulated and earth disturbance activities subject to permit requirements by DEP under regulations at 25 Pa. Code Chapter 102.
B. 
Work within natural drainageways subject to permit by DEP under 25 Pa. Code Chapter 102.
C. 
Any stormwater management facility that would be located in or adjacent to surface waters of the commonwealth, including wetlands, subject to permit by DEP under 25 Pa. Code Chapter 105.
D. 
Any stormwater management facility that would be located on a state highway right-of-way or require access from a state highway shall be subject to approval by the Pennsylvania Department of Transportation (PennDOT).
E. 
Culverts, bridges, storm sewers or any other facilities which must pass or convey flows from the tributary area and any facility which may constitute a dam subject to permit by DEP under 25 Pa. Code Chapter 105.
A. 
No regulated earth disturbance activities within the Borough shall commence until approval by the Borough Engineer of an erosion and sediment control plan for construction activities. Written approval by DEP or a delegated county conservation district shall satisfy this requirement.
B. 
An erosion and sediment control plan is required by DEP regulations for any earth disturbance activity of 5,000 square feet or more under 25 Pa. Code § 102.4(b).
C. 
A DEP NPDES Stormwater Discharges Associated with Construction Activities Permit is required for regulated earth disturbance activities under 25 Pa. Code Chapter 92.
D. 
Evidence of any necessary permit(s) for regulated earth disturbance activities from the appropriate DEP regional office or county conservation district must be provided to the Borough before the commencement of an earth disturbance activity.
E. 
A copy of the erosion and sediment control plan and any permit, as required by DEP regulations, shall be available at the project site at all times.
A. 
No regulated earth disturbance activities within the Borough shall commence until approval by the Borough Engineer of a plan which demonstrates compliance with this chapter. DEP has determined that this chapter meets state water quality requirements. Therefore, any approvals under this chapter would satisfy the post-construction stormwater management requirements associated with an NPDES permit for stormwater discharges associated with construction activities.*
B. 
The water quality volume (WQv) shall be captured and treated. The WQv shall be calculated two ways.
(1) 
First, WQv shall be calculated using the following formula:
WQv = (c)(P)(A)/12
Where
WQv
=
Water quality volume in acre-feet
c
=
Rational Method post-development runoff coefficient for the two-year storm
P
=
1.25 inches
A
=
Area in acres of proposed regulated activity
(2) 
Second, the WQv shall be calculated as the difference in runoff volume from predevelopment to post development for the two-year return period storm. The effect of closed depressions on the site shall be considered in this calculation. The larger of these two calculated volumes shall be used as the WQv to be captured and treated, except that in no case shall the WQv be permitted to exceed 1.25 inches of runoff over the site area.
C. 
The WQv shall be calculated for each post-development drainage direction on a site for sizing BMPs. Site areas having no impervious cover and no proposed disturbance during development may be excluded from the WQv calculations and do not require treatment.
D. 
If an applicant is proposing to use a wet pond, constructed wetland or other BMP that ponds water on the land surface and may receive direct sunlight, the discharge from that BMP must be treated by infiltration, a vegetated buffer, filter strip, bioretention, vegetated swale or other BMP that provides a thermal benefit to protect the high quality waters of the Saucon Creek from thermal impacts.
E. 
Any stormwater runoff from the site as a result of the regulated activities must either be treated with infiltration or two acceptable BMPs, such as those listed in Subsection N.
F. 
Infiltration BMPs shall not be constructed on fill.
G. 
The applicant shall document the bedrock type(s) present on the site from published sources. Any apparent boundaries between carbonate and noncarbonate bedrock shall be verified through more detailed site evaluations by a qualified geotechnical professional.
H. 
For each proposed regulated activity in the watershed, the applicant shall conduct a preliminary site investigation on the portion of the site that is judged to be the best candidate hydrogeologically for possible infiltration, including gathering data from published sources, a field inspection of the site, a minimum of one test pit and a minimum of two percolation tests, as outlined in Appendix E.[1] This investigation will determine depth to bedrock, depth to the seasonal high-water table, soil permeability and location of special geologic features, if applicable. The location(s) of special geologic features shall be verified by a qualified geotechnical professional.
[1]
Editor's Note: Appendix E is included at the end of this chapter.
I. 
For entirely noncarbonate sites, the WQv shall be infiltrated unless the applicant demonstrates that it is infeasible to infiltrate the WQv for reasons of seasonal high-water table, permeability rate, soil depth or isolation distances; or except as provided in Subsection T. The preliminary site investigation described in Subsection H shall continue on different areas of the site until a suitable infiltration location is found or the entire site is determined to be infeasible for infiltration. For proposed infiltration areas, the additional site investigation and testing as outlined in Appendix E [2] shall be completed. The Borough may determine infiltration to be infeasible if there are known existing conditions or problems that may be worsened by the use of infiltration. The following conditions are suitable for infiltration in noncarbonate areas:
(1) 
Depth to bedrock below the invert of the BMP greater than or equal to two feet.
(2) 
Depth to seasonal high-water table below the invert of the BMP greater than or equal to three feet. (If the depth to bedrock is between two and three feet and the evidence of the seasonal high-water table is not found in the soil, no further testing to locate the depth to seasonal high-water table is required.)
(3) 
Soil permeability greater than or equal to 0.5 inches/hour and less than or equal to 12 inches per hour.
(4) 
Setback distances or buffers as follows:
(a) 
One hundred feet from water supply wells.
(b) 
Ten feet downgradient or 100 feet upgradient from building foundations.
(c) 
Fifty feet from septic system drainfields.
(d) 
Fifty feet from a geologic contact with carbonate bedrock unless a preliminary site investigation is done in the carbonate bedrock to show the absence of special geologic features within 50 feet of the proposed infiltration area.
(e) 
One hundred feet from the property line unless documentation is provided to show that all setbacks from wells, foundations and drainfields on neighboring properties will be met.
(5) 
If it is not feasible to infiltrate the full WQv, the applicant shall infiltrate that portion of the WQv that is feasible based on the site characteristics.
[2]
Editor's Note: Appendix E is included at the end of this chapter.
J. 
In entirely carbonate areas, in addition to the testing required in Subsection H, the preliminary site investigation shall include an assessment of the remainder of the site for possible infiltration based on required isolation distances from special geologic features and the likely soil depth and permeability based on published data or other site data available. Where infiltration BMPs are proposed, the applicant shall conduct the additional site investigation and testing as outlined in Appendix E.[3] The soil depth, percolation rate and proposed loading rate, each weighted as described in § 378-17, along with the buffer from special geologic features shall be compared to the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix B[4] to determine if the site is recommended for infiltration. If at any point in the preliminary site investigation the data (e.g., location of Karst features on the site or the published soils data for the site) indicates that the entire site will not be recommended for infiltration based on the chapter standards, then no further investigation is required. In addition to the recommendation from Appendix B, the following conditions are required for infiltration in carbonate areas:
(1) 
Depth to bedrock below the invert of the BMP greater than or equal to two feet.
(2) 
Depth to seasonal high-water table below the invert of the BMP greater than or equal to three feet. (If the depth to bedrock is between two and three feet and the evidence of the seasonal high-water table is not found in the soil, no further testing to locate the depth to seasonal high-water table is required.)
(3) 
Soil permeability greater than or equal to 0.5 inches/hour and less than or equal to 12 inches per hour.
(4) 
Setback distances or buffers as follows:
(a) 
One hundred feet from water supply wells.
(b) 
Ten feet downgradient or 100 feet upgradient from building foundations.
(c) 
Fifty feet from septic system drainfields.
(d) 
One hundred feet from the property line, unless documentation is provided to show that all setbacks from wells, foundations and drainfields on neighboring properties will be met.
(5) 
Applicants are not required to use infiltration BMPs on a carbonate site even if the site falls in the "Recommended" range on the chart in Appendix B.[5] If infiltration is not proposed, the WQv shall be treated by two acceptable BMPs, as specified in Subsection O.
[5]
Editor's Note: Appendix B is included at the end of this chapter.
[3]
Editor's Note: Appendix E is included at the end of this chapter.
[4]
Editor's Note: Appendix B is included at the end of this chapter.
K. 
If a site has both carbonate and noncarbonate areas, the applicant shall investigate the ability of the noncarbonate portion of the site to fully meet this chapter to control runoff for the whole site through infiltration. If that proves infeasible, the applicant shall perform the preliminary site investigation for the carbonate area to determine the appropriate design strategy. No infiltration structure in the noncarbonate area shall be located within 50 feet of a boundary with carbonate bedrock, except when a preliminary site investigation has been done showing the absence of special geologic features within 50 feet of the proposed infiltration area.
L. 
If infiltration BMPs are proposed in carbonate areas, the post-development two-year runoff volume leaving the site shall be 80% or more of the predevelopment runoff volume for the carbonate portion of the site to prevent infiltration of volumes far in excess of the predevelopment infiltration volume.
M. 
Site areas proposed for infiltration shall be protected from disturbance and compaction except as necessary for construction of infiltration BMPs.
N. 
If infiltration of the entire WQv is not proposed, the remainder of the WQv shall be treated by two acceptable BMPs in series for each discharge location. Sheet flow draining across a pervious area can be considered as one BMP. Sheet flow across impervious areas and concentrated flow shall flow through two BMPs. If sheet flow from an impervious area is to be drained across a pervious area as one BMP, the length of the pervious area must be equal to or greater than the length of impervious area. In no case may the same BMP be employed consecutively to meet this requirement. Acceptable BMPs are listed below along with the recommended reference for design.
Best Management Practice
Design Reference
Bioretention
Low Impact Development Design Strategies, Prince George's County, Md., June 19992
Capture reuse
Texas Guide to Rainwater Harvesting, 2nd Edition. Texas Water Development Board, Center for Maximum Potential Building Systems, 19973
Constructed wetlands
2000 Maryland Stormwater Design Manual, Maryland Department of the Environment4
Minimum disturbance/minimum maintenance practices
Conservation Design for Stormwater Management Delaware Dept. of Natural Resources and Brandywine Conservancy, September 19975
Oil/water separators
Georgia Stormwater Management Manual Volume 2 Technical Handbook, August 20016
Sediment traps/catch basin sumps
U.S. Environmental Protection Agency's Post-Construction Stormwater Management in New Development & Redevelopment BMP Fact Sheet for "Catch Basins/Catch Basin Insert"7
Significant reduction of existing impervious cover
N/A
Stormwater filters (sand, peat, compost, etc.)
Design of Stormwater Filtering Systems. Claytor, R. and Schueler, T., Center for Watershed Protection, December 19968
Trash/debris collectors in catch basins
Pennsylvania Handbook of BMPs for Developing Areas9 or latest PA Department of Environmental Protection Manual
Vegetated buffers/filter strips
Pennsylvania Handbook of BMPs for Developing Areas9 or latest PA Department of Environmental Protection Manual
Vegetated roofs
Roof Gardens: History, Design, and Construction. Osmundson, T., W. W. Norton & Co., 199810
Vegetated swales/filter strips
2000 Maryland Stormwater Design Manual, Maryland Department of the Environment4
Water quality inserts for inlets
Pennsylvania Handbook of BMPs for Developing Areas9 or latest PA Department of Environmental Protection Manual
Wet detention ponds
Pennsylvania Handbook of BMPs for Developing Areas9 or latest PA Department of Environmental Protection Manual
NOTES:
1
If this BMP is used to treat the entire WQv, then only one BMP is required because of this BMP's superior water quality performance.
2
Available at www.co.pg.md.us/Government/AgencyIndex/DER/PPD/LID/LiDNatl.pdf as of January 2004
3
Available at www.twdb.state.tx.us/publications/reports/RainHarv.pdf as of January 2004
4
Available at www.mde.state.md.us as of January 2004
5
Available at www.dnrec.state.de.us/dnrec2000/Divisions/Soil/Stormwater/Apps/ DesignManualRequest.htm as of January 2004
6
Available at www.georgiastormwater.com as of January 2004
7
Available at http://cfpub.epa.gov/npdes/stormwater/menuofbmps/post_7.cfm as of January 2004
8
Available from the Center for Watershed Protection (www.cwp.org) as of January 2004
9
Available at www.dep.state.pa.us (keyword "stormwater") as of January 2004
10
Available at www.wwnorton.com as of January 2004
O. 
Stormwater runoff from hot spot land uses shall be pretreated. In no case, may the same BMP be employed consecutively to meet this requirement and the requirement in Subsection N.
(1) 
Acceptable methods of pretreatment are listed below.
Hot Spot Land Use
Pretreatment Method(s)
Vehicle maintenance and repair facilities including auto parts stores
Oil/water separators
Use of drip pans and/or dry sweep material under vehicles/equipment
Use of absorbent devices to reduce liquid releases
Spill prevention and response program
Vehicle fueling stations
Oil/water separators
Water quality inserts for inlets
Spill prevention and response program
Storage areas for public works
Oil/water separators
Sediment traps/catch basin sumps
Water quality inserts for inlets
Use of drip pans and/or dry sweep material under vehicles/equipment
Use of absorbent devices to reduce liquid releases
Spill prevention and response program
Diversion of stormwater away from potential contamination areas
Outdoor storage of liquids
Spill prevention and response program
Commercial nursery operations
Vegetated swales/filter strips
Constructed wetlands
Stormwater collection and reuse
Salvage yards and recycling facilities*
BMPs that are a part of a stormwater pollution prevention plan under an NPDES Permit
Fleet storage yards and vehicle cleaning facilities*
BMPs that are a part of a stormwater pollution prevention plan under an NPDES Permit
Facilities that store or generate regulated substances*
BMPs that are a part of a stormwater pollution prevention plan under an NPDES Permit
Marinas*
BMPs that are a part of a stormwater pollution prevention plan under an NPDES Permit
Certain industrial uses (listed under NPDES)*
BMPs that are a part of a stormwater pollution prevention plan under an NPDES Permit
NOTES:
*
Regulated under the NPDES Stormwater Program
(2) 
Design references for the pretreatment methods, as necessary, are listed below. The applicant may demonstrate that, due to the site characteristics, the land use is not a hot spot land use.
Pretreatment Method
Design Reference
Constructed wetlands
2000 Maryland Stormwater Design Manual, Maryland Department of the Environment1
Diversion of stormwater away from potential contamination areas
Pennsylvania Handbook of BMPs for Developing Areas2 or latest PA Department of Environmental Protection Manual
Oil/water separators
Georgia Stormwater Management Manual Volume 2 Technical Handbook, August 20013
Sediment traps/catch basin sumps
U.S. Environmental Protection Agency's Post-Construction Stormwater Management in New Development and Redevelopment BMP Fact Sheet for "Catch Basins/Catch Basin Insert"4
Stormwater collection and reuse (especially for irrigation)
Texas Guide to Rainwater Harvesting, 2nd Edition, Texas Water Development Board, Center for Maximum Potential Building Systems, 19975
Stormwater filters (sand, peat, compost, etc.)
Design of Stormwater Filtering Systems. Claytor, R. and Schueler, T., Center for Watershed Protection, December 19966
Trash/debris collectors in catch basins
Pennsylvania Handbook of BMPs for Developing Areas2 or latest PA Department of Environmental Protection Manual
Vegetated swales/filter strips
2000 Maryland Stormwater Design Manual, Maryland Department of the Environment1
Water quality inserts for inlets
Pennsylvania Handbook of BMPs for Developing Areas2 or latest PA Department of Environmental Protection Manual
NOTES:
1
Available at www.mde.state.md.us as of January 2004
2
Available at www.dep.state.pa.us (keyword Stormwater) as of January 2004
3
Available at www.georgiastormwater.com as of January 2004
4
Available at http://cfpub.epa.gov/npdes/stormwater/menuofbmps/post_7.cfm as of January 2004
5
Available at www.twdb.state.tx.us/publications/reports/RainHarv.pdf as of January 2004
6
Available from the Center for Watershed Protection (www.cwp.org) as of January 2004
P. 
The use of infiltration BMPs is prohibited on hot spot land use areas.
Q. 
Stormwater infiltration BMPs shall not be placed in or on a special geologic feature(s). Additionally, stormwater runoff shall not be discharged into existing on-site sinkholes.
R. 
Applicants shall request, in writing, public water suppliers to provide the Zone I wellhead protection radius, as calculated by the method outlined in the Pennsylvania Department of Environmental Protection Wellhead Protection Regulations, for any public water supply well within 400 feet of the site. In addition to the setback distances specified in Subsections I and J, infiltration is prohibited in the Zone I radius as defined and substantiated by the public water supplier in writing. If the applicant does not receive a response from the public water supplier, the Zone I radius is assumed to be 100 feet.
S. 
The volume and rate of the net increase in stormwater runoff from the regulated activities must be managed to prevent the physical degradation of receiving waters from such effects as scour and stream bank destabilization, to satisfy state water quality requirements.
T. 
The Borough may, after consultation with DEP, approve alternative methods for meeting the state water quality requirements other than those in this section, provided that they meet the minimum requirements of and do not conflict with state law, including but not limited to the Clean Streams Law.[6]
[6]
Editor's Note: See 35 P.S. § 691.1 et seq.
A. 
To implement the provisions of the Saucon Creek Watershed Stormwater Management Plan, the Borough is hereby determined to be a "conditional no-detention district."
B. 
Conditional no-detention districts. Within these districts, the capacity of the "local" runoff conveyance facilities (as defined in Article II) must be calculated to determine if adequate capacity exists. For this determination, the developer must calculate peak flows assuming that the site is developed as proposed and that the remainder of the local watershed is in the existing condition. The developer must also calculate peak flows assuming that the entire local watershed is developed per current zoning and that all new development would use the runoff controls specified by this chapter. The larger of the two peak flows calculated will be used in determining if adequate capacity exists. If adequate capacity exists to safely transport runoff from the site to the main channel (as defined in Article II), these watershed areas may discharge post-development peak runoff without detention facilities. If the capacity calculations show that the "local" runoff conveyance facilities lack adequate capacity, the developer shall either use a one-hundred-percent release rate control or provide increased capacity of downstream elements to convey increased peak flows consistent with § 378-16P. Any capacity improvements must be designed to convey runoff from development of all areas tributary to the improvement consistent with the capacity criteria specified in § 378-16D. By definition, a storm drainage problem area associated with the "local" runoff conveyance facilities indicates that adequate capacity does not exist.
A. 
Applicants shall provide a comparative preconstruction and post-construction stormwater management hydrograph analysis for each direction of discharge and for the site overall to demonstrate compliance with the provisions of this chapter.
B. 
Any downstream capacity analysis conducted in accordance with this chapter shall use the following criteria for determining adequacy for accepting increased peak flow rates:
(1) 
Natural or man-made channels or swales must be able to convey the increased runoff associated with a two-year return period event within their banks at velocities consistent with protection of the channels from erosion.
(2) 
Natural or man-made channels or swales must be able to convey the increased twenty-five-year return period runoff without creating any hazard to persons or property.
(3) 
Culverts, bridges, storm sewers or any other facilities which must pass or convey flows from the tributary area must be designed in accordance with DEP Chapter 105 regulations (if applicable) and, at minimum, pass the increased twenty-five-year return period runoff.
C. 
For a proposed development site located within one release rate category subarea, the total runoff from the site shall meet the applicable release rate criteria. For development sites with multiple directions of runoff discharge, individual drainage directions may be designed for up to a one-hundred-percent release rate so long as the total runoff from the site is controlled to the applicable release rate.
D. 
For a proposed development site located within two or more release category subareas, the peak discharge rate from any subarea shall be the predevelopment peak discharge for that subarea multiplied by the applicable release rate. The calculated peak discharges shall apply regardless of whether the grading plan changes the drainage area by subarea. An exception to the above may be granted if discharges from multiple subareas recombine in proximity to the site. In this case, peak discharge in any direction may be a one-hundred-percent release rate, provided that the overall site discharge meets the weighted average release rate.
E. 
For a proposed development site located partially within a release rate category subarea and partially within a conditional no-detention subarea, a significant portion of the site area subject to the release rate control may not be drained to the discharge point(s) located in the no-detention subarea except as part of a no-harm or hardship waiver procedure.
F. 
No portion of a site may be regraded between the Saucon Creek Watershed and any adjacent watershed except as part of a no-harm or hardship waiver procedure.
G. 
Within a release rate category area, for a proposed development site which has areas which drain to a closed depression(s), the design release from the site will be the lesser of: (a) the applicable release rate flow assuming no closed depression(s) or (b) the existing peak flow actually leaving the site. In cases where (b) would result in an unreasonably small design release, the design discharge of less than or equal to the release rate will be determined by the available downstream conveyance capacity to the main channel calculated using Subsection D and the minimum orifice criteria.
H. 
Off-site areas which drain through a proposed development site are not subject to release rate criteria when determining allowable peak runoff rates. However, on-site drainage facilities shall be designed to safely convey off-site flows through the development site using the capacity criteria in Subsection D and the detention criteria in § 378-17.
I. 
For development sites proposed to take place in phases, all detention ponds shall be designed to meet the applicable release rate(s) applied to all site areas tributary to the proposed pond discharge direction. All site tributary areas will be assumed as developed, regardless of whether all site tributary acres are proposed for development at that time. An exception shall be sites with multiple detention ponds in series where only the downstream pond must be designed to the stated release rate.
J. 
Where the site area to be impacted by a proposed development activity differs significantly from the total site area, only the proposed impact area shall be subject to the release rate criteria. The impact area includes any proposed cover or grading changes.
K. 
Development proposals which, through groundwater recharge or other means, do not increase either the rate or volume of runoff discharged from the site compared to predevelopment are not subject to the release rate provisions of this chapter.
L. 
No-harm water quantity option. For any proposed development site not located in a conditional no-detention district, the developer has the option of using a less restrictive runoff control (including no detention) if the developer can prove that special circumstances exist for the proposed development site and that no harm would be caused by discharging at a higher runoff rate than that specified by the plan. Special circumstances are defined as any hydrologic or hydraulic aspects of the development itself not specifically considered in the development of the plan runoff control strategy. Proof of no harm would have to be shown from the development site through the remainder of the downstream drainage network to the confluence of the creek with the Lehigh River. Proof of no harm must be shown using the capacity criteria specified in Subsection D if downstream capacity analysis is a part of the no-harm justification.
(1) 
Attempts to prove no harm based upon downstream peak flow versus capacity analysis shall be governed by the following provisions:
(a) 
The peak flow values to be used for downstream areas for the design return period storms (two-, ten-, twenty-five-, and one-hundred-year) shall be the values from the calibrated Watershed Model for the Little Lehigh Creek or as calculated by an applicant using an alternate method acceptable to the Borough. The flow values from the watershed model would be supplied to the developer by the Borough upon request.
(b) 
Any available capacity in the downstream conveyance system as documented by a developer may be used by the developer only in proportion to his development site acreage relative to the total upstream undeveloped acreage from the identified capacity (i.e., if his site is 10% of the upstream undeveloped acreage, he may use up to 10% of the documented downstream available capacity).
(c) 
Developer-proposed runoff controls which would generate increased peak flow rates at storm drainage problem areas would, by definition, be precluded from successful attempts to prove no harm, except in conjunction with proposed capacity improvements for the problem areas consistent with Subsection O.
(2) 
Any no-harm justifications shall be submitted by the developer as part of the drainage plan submission per Article IV.
M. 
Regional detention alternatives. For certain areas within the Borough, it may be more cost-effective to provide one control facility for more than one development site than to provide an individual control facility for each development site. The initiative and funding for any regional runoff control alternatives are the responsibility of prospective developers. The design of any regional control basins must incorporate reasonable development of the entire upstream watershed. The peak outflow of a regional basin would be determined based on the required release rate at the point of discharge.
N. 
Capacity improvements.
(1) 
In certain instances, primarily within the conditional no-detention areas, local drainage conditions may dictate more stringent levels of runoff control than those based upon protection of the entire watershed. In these instances, if the developer could prove that it would be feasible to provide capacity improvements to relieve the capacity deficiency in the local drainage network, then the capacity improvements could be provided by the developer in lieu of runoff controls on the development site. Peak flow calculations shall be done assuming that the local watershed is in the existing condition and then assuming that the local watershed is developed per current zoning and using the specified runoff controls. Any capacity improvements would be designed using the larger of the above peak flows and the capacity criteria specified in Subsection D. All new development in the entire subarea(s) within which the proposed development site is located shall be assumed to implement the developer's proposed discharge control, if any.
(2) 
Capacity improvements may also be provided as necessary to implement any regional detention alternatives or to implement a modified no-harm option which proposes specific capacity improvements to provide that a less stringent discharge control would not create any harm downstream.
A. 
Stormwater runoff from all development sites shall be calculated using either the Rational Method or the Soil-Cover-Complex Methodology.
B. 
Infiltration BMP loading rate percentages in the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix B[1] shall be calculated as follows:
(Area tributary to infiltration BMP/base area of infiltration BMP) *100%
The area tributary to the infiltration BMP shall be weighted as follows:
All disturbed areas to be made impervious:
Weight at 100%
All disturbed areas to be made pervious:
Weight at 50%
All undisturbed pervious areas:
Weight at 0%
All existing impervious areas:
Weight at 100%
[1]
Editor's Note: Appendix B is included at the end of this chapter.
C. 
Soil thickness is to be measured from the bottom of any proposed infiltration system. The effective soil thickness in the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix D is the measured soil thickness multiplied by the thickness factor based on soil permeability, as follows:
Permeability Range*
(inches/hour)
Thickness Factor
6.0 to 12.0
0.8
2.0 to 6.0
1.0
1.0 to 2.0
1.4
0.75 to 1.0
1.2
0.5 to 0.75
1.0
NOTES:
*
If the permeability rate falls on a break between two thickness factors, the smaller thickness factor shall be used.
Sites with soil permeability greater than 12.0 inches/hour or less than 0.5 inch/hour are not recommended for infiltration.
D. 
The design of any detention basin intended to meet the requirements of this chapter shall be verified by routing the design storm hydrograph through the proposed basin using the Storage Indication Method or other methodology demonstrated to be more appropriate. For basins designed using the Rational Method technique, the design hydrograph for routing shall be either the Universal Rational Hydrograph or the modified rational method trapezoidal hydrograph which maximizes detention volume. Use of the modified rational hydrograph shall be consistent with the procedure described in Section "PIPE.RAT" of the Users' Manual for the Penn State Urban Hydrograph Method (1987).
E. 
BMPs designed to store or infiltrate runoff and discharge to surface runoff or pipe flow shall be routed using the Storage Indication Method.
F. 
BMPs designed to store or infiltrate runoff and discharge to surface runoff or pipe flow shall provide storage volume for the full WQv below the lowest outlet invert.
G. 
Wet detention ponds designed to have a permanent pool for the WQv shall assume that the permanent pool volume below the primary outlet is full at the beginning of design event routing for the purposes of evaluating peak outflows.
H. 
All stormwater detention facilities shall provide a minimum one foot freeboard above the maximum pool elevation associated with the two-year through twenty-five-year runoff events. A 0.5 foot freeboard shall be provided above the maximum pool elevation of the one-hundred-year runoff event. The freeboard shall be measured from the maximum pool elevation to the invert of the emergency spillway. The two-year through one-hundred-year storm events shall be controlled by the primary outlet structure. An emergency spillway for each basin shall be designed to pass the one-hundred-year return frequency storm peak basin inflow rate with a minimum 0.5 foot freeboard measured to the top of basin. The freeboard criteria shall be met considering any off-site areas tributary to the basin as developed, as applicable. If this detention facility is considered to be a dam as per DEP Chapter 105, the design of the facility must be consistent with the Chapter 105 regulations, and may be required to pass a storm greater than the one-hundred-year event.
I. 
The minimum circular orifice diameter for controlling discharge rates from detention facilities shall be three inches. Designs where a lesser-size orifice would be required to fully meet release rates shall be acceptable, provided that as much of the site runoff as practical is directed to the detention facilities.
J. 
Runoff calculations using the Soil-Cover-Complex Method shall use the Natural Resources Conservation Service Type II twenty-four-hour rainfall distribution. The twenty-four-hour rainfall depths for the various return periods to be used consistent with this chapter may be taken from NOAA Atlas 14, Volume 2 or the PennDOT Intensity — Duration — Frequency Field Manual ("PDT-IDF") (May 1986) for Region 4.
(1) 
The following values are taken from the PDT-IDF Field Manual:
Return Period
24-Hour Rainfall Depth
(inches)
1-year
2.40
2-year
3.00
5-year
3.60
10-year
4.56
25-year
5.52
50-year
6.48
100-year
7.44
(2) 
A graphical and tabular presentation of the Type II twenty-four-hour distribution is included in Appendix A.[2]
[2]
Editor's Note: Appendix A is included at the end of this chapter.
K. 
Runoff calculations using the Rational Method shall use rainfall intensities consistent with appropriate times of concentration and return periods and the intensity-duration-frequency curves as presented in Appendix A.[3]
[3]
Editor's Note: Appendix A is included at the end of this chapter.
L. 
Runoff Curve Numbers (CNs) to be used in the Soil-Cover-Complex Method shall be based upon the matrix presented in Appendix A.
M. 
Runoff coefficients for use in the Rational Method shall be based upon the table presented in Appendix A.[4]
[4]
Editor's Note: Appendix A is included at the end of this chapter.
N. 
All time of concentration calculations shall use a segmental approach which may include one or all of the flow types below:
(1) 
Sheet flow (overland flow) calculations shall use either the NRCS average velocity chart (Figure 3-1, Technical Release-55, 1975) or the modified kinematic wave travel time equation (Equation 3-3, NRCS TR-55, June 1986). If using the modified kinematic wave travel time equation, the sheet flow length shall be limited to 50 feet for designs using the Rational Method and limited to 150 feet for designs using the Soil-Cover-Complex Method.
(2) 
Shallow concentrated flow travel times shall be determined from the watercourse slope, type of surface and the velocity from Figure 3-1 of TR-55, June 1986.
(3) 
Open channel flow travel times shall be determined from velocities calculated by the Manning Equation. Bankfull flows shall be used for determining velocities. Manning "n" values shall be based on the table presented in Appendix A.[5]
[5]
Editor's Note: Appendix A is included at the end of this chapter.
(4) 
Pipe flow travel times shall be determined from velocities calculated using the Manning Equation assuming full flow and the Manning "n" values from Appendix A.
O. 
If using the Rational Method, all predevelopment calculations for a given discharge direction shall be based on a common time of concentration considering both on-site and any off-site drainage areas. If using the Rational Method, all post-development calculations for a given discharge direction shall be based on a common time of concentration considering both on-site and any off-site drainage areas.
P. 
The Manning Equation shall be used to calculate the capacity of watercourses. Manning "n" values used in the calculations shall be consistent with the table presented in Appendix A[6] or other appropriate standard engineering 'n' value resources. Pipe capacities shall be determined by methods acceptable to the Borough.
[6]
Editor's Note: Appendix A is included at the end of this chapter.
Q. 
The Pennsylvania DEP Chapter 105 Rules and Regulations apply to the construction, modification, operation or maintenance of both existing and proposed dams, water obstructions and encroachments throughout the watershed. Criteria for design and construction of stormwater management facilities according to this chapter may not be the same criteria that are used in the permitting of dams under the Dam Safety Program.