[Amended 5-6-1996 STM by Art. 16]
The purpose of this article is to manage traffic so as to:
(1)
Provide for the orderly movement of traffic, reduce accidents,
allow adequate emergency response and maintain adequate and safe streets;
(2)
Discourage the use of neighborhood streets as shortcuts by promoting
the use of arterial and collector streets;
(3)
Encourage the use of traffic engineering design standards appropriate
for a residential suburban community;
(4)
Encourage private sector participation in managing traffic;
(5)
Create and maintain safe and convenient pedestrian access and
bike paths;
(6)
Encourage the use of public transit, car pools and van pools;
(7)
Promote clean air by reducing exhaust emissions.
For the purposes of this article the following terms shall have
the following meanings:
Level of Service (LOS) D or better on every major approach
for arterial and collector streets; LOS C or better for residential
and subcollector streets.
The number of vehicles passing a point on a street during
a twenty-four-hour period on a typical day.
The maximum number of vehicles which can reasonably be expected
to be processed through an intersection or street segment during a
one-hour peak time period.
The fifth year after a development is scheduled to be completed.
An exceptional hourly, daily or seasonal period of trip generation
(i.e., the December holiday).
A residential or subcollector street or intersection receiving
25 or more peak hour trips from a development; a collector arterial
street or intersection receiving 50 or more peak hour trips from a
development.
A measure of the operating conditions of an intersection
or street segment ranked on a scale from LOS A (optimum) to LOS F
(failing) as defined in the Highway Capacity Manual, latest edition,
Transportation Research Board.
The number of trips captured by a land use from existing
traffic on an adjacent street.
3:00 p.m. to 6:00 p.m.
7:00 a.m. to 9:00 a.m.
12:00 noon to 4:00 p.m.
That part of a traffic signal's time cycle allocated to a
traffic movement or a combination of movements (including exclusive
pedestrian movements) receiving the right-of-way simultaneously.
An interregional street with an ADT of more than 5,000 conveying
traffic between centers.
A street carrying large volumes of traffic (maximum ADT of
5,000) between arterial streets and residential and subcollector streets
and having limited direct access to lots.
SUBCOLLECTOR — A street with a maximum ADT of
1,000 to 2,000 which provides access to lots and carries residential
traffic to collector and arterial streets.
|
A street with low traffic volume (maximum ADT of 1,000) which
provides frontage for access to lots and carries traffic with destination
or origin on the street itself.
An area which encompasses all impacted streets.
A single or one-directional vehicle movement.
Assignment of development generated and through trips to
municipal streets and a development's driveways.
The number of trips per unit of independent variable (e.g.,
trips per dwelling unit, employee or square footage).
Article XIV shall apply to every application for a special permit (SP) or site plan review (SPR).
A.
A traffic study, prepared by a professional engineer registered in
Massachusetts or other appropriate professional specializing in traffic
planning, shall be submitted with each application for a SP or SPR
in which the proposed activity will generate 50 or more new trips
during the peak hour of the development. If no streets are impacted
by a development, the SPGA may determine that a traffic study is not
required. The applicant, at his discretion, may consult with the SPGA
or its designees prior to the submission of a SP or SPR in order to
identify the intersections to be studied and the appropriate elements
to include in the study.
B.
Trip rates may be based on Institute of Transportation Engineers
Trip Generation, latest edition (ITE), or data from similar developments
in similar settings in Massachusetts.
(1)
If ITE is used, the land use code, number of studies, weighted
average trip rate, trip generation equation standard deviation and
coefficient for each land use used shall be provided. Use of the weighted
average trip rate or trip generation equation to predict trips for
each land use shall be based on the procedures set forth in ITE.
(2)
If local trip rates are used, the methodology used and the applicability
of the data shall be provided.
(3)
It data is available from ITE and local sources, the applicant
may demonstrate why the ITE data is not accurate and should not be
used. The SPGA shall determine which data source will be used.
C.
All traffic counts including turning movements shall have been taken
within 12 months of the date of submission and shall be adjusted for
seasonal variation with an explanation as to how the adjustment was
made.
D.
Projections of ADT's, turning movements and capacity analyses shall
be adjusted for (where appropriate):
(1)
Background traffic with an explanation as to how said adjustment
was made;
(2)
Truck traffic and buses;
(3)
Vacant space in existing buildings in the study area;
(4)
Trips generated by the proposed development on full occupancy;
and
(5)
Trips generated by developments in the study area that are under
review or approved by a municipal agency or in the MEPA process.
E.
If an exceptional peak period is likely to occur, the SPGA may require
analysis or traffic for said period.
F.
Trips from an existing land use that are being replaced by a new
land use may be subtracted as follows:
(1)
If trip generation and distribution for the new land use have
the same characteristics as the land use being replaced, trips generated
by the new land use may be reduced by an amount to exceed the trips
generated by the land use being replaced.
(2)
If trip generation and distribution for the new land use do
not have the same characteristics as the land use being replaced,
trips generated by the existing land use may be subtracted from the
street system.
G.
Where a project accesses or impacts a state highway, evidence of
consultation with MHD shall be provided.
H.
The traffic study shall have the following elements (when applicable):
(1)
Executive summary with:
(a)
Scope of work to include location of the project locus map and
site plan, description of type and intensity of existing and proposed
development and description of study area;
(b)
Schedule for project development;
(c)
Summary of existing and future traffic conditions including
deficiencies in the street system;
(d)
Summary of traffic impacts and proposed mitigation;
(e)
Listing of all permits required by the project and a summary
of the status of permitting process for each required permit.
(2)
Review of traffic studies undertaken within the study area in
the prior five years on file in the municipalities within the study
area.
(3)
Description of roadway characteristics for all impacted streets
to include:
(a)
Inventory of land uses within 500 feet of the development and
on each impacted street;
(b)
Identification of all curb cuts and driveways within 500 feet
of the development;
(c)
Physical characteristics including number of travel lanes; widths
of right-of-way, travel lanes, sidewalks and shoulders; conditions
of pavement, sidewalk and curbing; and roadway geometry and grades;
(d)
Inventory of traffic control devices including regulatory parking
and warning signs, traffic signal permits, control units and description
of signal phasing;
(e)
Sight distances and obstructions to sight lines;
(f)
Location and type of streetlighting;
(g)
Actual and posted traffic speeds;
(h)
Number, type and location of accidents by year for the most
recent three years;
(i)
Description or transit system serving the study area including
mode, frequency, schedule, routes, stop location and patronage;
(j)
Time and peak volume of parking for the development;
(k)
Location of pedestrian and bicycle routes;
(l)
Location of churches, schools, parks and similar public or civic
uses within the study area.
(4)
Description of traffic improvements to be completed in the study
area prior to the design year with a schedule of implementation and
identification of the parties responsible for implementing the improvements.
(5)
ADT's on all impacted streets for the current year and the no-build
and build conditions of the design year (no-build and build conditions).
Current ADT's shall be counted for a forty-eight-hour period on a
typical weekday.
(6)
Existing site generated trips with a trip assignment.
(7)
Identification of the peak hours (a.m., p.m., and Saturday)
of the development and for adjacent streets with an explanation as
to how the peak hours were selected.
(8)
Development generated trips for the peak hours of the development
and for adjacent streets and a trip assignment with an explanation
as to how the assignment was made. If projected trips are adjusted
for pass-by or diverted trips, an explanation as to how the adjustment
was made shall be provided. Adjustment for pass-by trips shall be
limited to 25% of site generated trips and 5% of the volume the traffic
on the street serving the site.
(9)
Peak hour(s) turning movement counts on all impacted intersections
for the current year and the no-build and build conditions.
(10)
Capacity analysis for the current year and the no-build and
build conditions on all impacted streets and street segments. Said
analysis shall be based on the Highway Capacity Manual Transportation
Research Board, latest edition (where applicable), and shall include
a queue analysis and critical volumes by signal phase or turning movement
for each intersection studied.
(11)
Gap analysis for unsignalized intersections and site driveways
which experience excessive delay or are approaching capacity.
(12)
Measures to mitigate traffic impacts to include:
(a)
The process through which the mitigation will be authorized,
financed, designed and implemented.
(b)
Capacity analysis on all impacted streets and intersections
based on the mitigation proposed.
(c)
Review of potential impact to utilities, wetlands, archaeological/historical
sites, etc.
(d)
Implementation schedule. If the development or the mitigation
is phased, the study shall show how the mitigation will be implemented
and function for each phase.
(e)
If site design and geometric changes are proposed, said changes
shall be based on current engineering standards for turn pocket transition
tapers, lane widths, sight distance, multiple lane configuration,
and right-of-way widths. A description of said changes shall include:
[1]
Scaled plan(s) (one inch equals 40 feet preferred)
showing:
[a]
Existing and proposed layout lines, building footprint(s),
parking lot areas and driveways;
[b]
The relationship of the site layout to existing
rights-of-way with sight distances;
[c]
Proposed geometric changes and widening (driveways,
storage lanes, acceleration and deceleration lanes, turning lanes,
etc.).
[2]
A traffic management plan to maintain traffic flow
on impacted street(s) and allow access to abutting properties by vehicles,
pedestrians, and handicap persons during construction.
[3]
Measures to mitigate traffic-generated noise and
dust pollution.
(f)
If traffic signalization is proposed, a signal warrant analysis
based on Manual on Uniform Traffic Control Devices (FHWA, latest edition).
(g)
Program to monitor the effects of the mitigation for a period
of three years after implementation.
(h)
If signalization of an unsignalized intersection is proposed
as mitigation, the applicant shall also provide alternative mitigation
for the intersection.
[Amended 5-4-1999 STM by Art. 26]
A.
Prior to granting a SP or SPR, the SPGA shall determine there will
be adequate capacity on all impacted streets for the build condition.
(1)
If adequate capacity is projected on any impacted street for
the no-build condition and a development causes a decease in LOS the
SPGA may require implementation of mitigative measures to restore
the LOS to the no-build condition.
B.
Prior to granting a special permit or site plan review, the SPGA
shall determine if any impacted street will be the receptor of excessive
traffic. If the special permit granting authority finds that there
will be an increase in projected traffic (any peak hour or ADT) between
"No Build" and "Build" condition of the design year greater than that
indicated in Figure 1 below, the special permit granting authority
shall take one of the following measures:
(1)
The special permit granting authority may require the implementation
of mitigative measures to reduce the volume of traffic.
(2)
The special permit granting authority may deny the application.
Figure 1
| ||
---|---|---|
ADT
|
Allowable Increase In % of Traffic
| |
1 to 2,000
|
30%
| |
2,001 to 5,000
|
20%
| |
5,001 to 10,000
|
15%
| |
10,000+
|
10%
|
C.
The SPGA may condition its approval on:
(1)
Completion of mitigation prior to issuing any occupancy permit.
(2)
Posting surety to guarantee implementation of mitigation.
(3)
Implementing measures to reduce trips generated by development
including use of:
(a)
Employer-subsidized passes for public transit;
(b)
Car pools and van pools;
(c)
Flex time or staggered work hours;
(d)
Preferential parking for high occupancy vehicles;
(e)
Restricting access to or egress from off-street parking areas
during peak hours;
(f)
Measures to promote pedestrian access;
(g)
Measures to encourage bicycle commuting such as secured bike racks and locker and shower facilities. The SPGA may require the submission of periodic reports on the effectiveness of the trip reduction programs as part of the monitoring required under § 135-1404H(12)(g).
(4)
Reducing of the size or intensity of the project.
(5)
Phasing the development of the project.
(6)
Obtaining all other permits where applicable.
A.
If a development impacts streets in another municipality, the traffic
study shall be submitted to the municipality for review and comment
concurrently with the filing. The SPGA shall not take final action
on a SP or SPR until it has received comments from the municipality
or until 35 days have elapsed from the transmittal of the traffic
study.
B.
The SPGA may require the study and mitigation of impacted streets
in an abutting municipality provided that the abutting municipality
has adopted this article and the development is not being independently
permitted by the municipality. An abutting municipality(ies) shall
approve any mitigation proposed for any street in its jurisdiction.
If the SPGA determines that its conditions on traffic are not
being met, the SPGA shall require the applicant to bring the development
into compliance.
If the SPGA finds that any section or provision of this article
does not apply, it may be waived by vote of the SPGA.
Should any section or provision of this article be declared
to be invalid, said section or provision shall not invalidate any
other section or provision of this article.