The following fees shall be charged upon the filing of an application
for a zoning permit for a permitted use:
A. Base fee for a permitted use of any kind: $25.
B. Additional fee in residential zones for each dwelling unit sought:
$25, plus engineering costs anticipated by the town for the purpose
of evaluating the application, if needed.
C. Additional fee in business and industrial zones: $300, plus $25 per
acre, plus engineering costs anticipated by the town for the purpose
of evaluating the application, if needed.
D. Additional fee for revisions to application or resubmittal of application
required by the town: $25, plus engineering costs anticipated by the
town for the purpose of evaluating the revised or resubmitted application,
if needed.
The following fees shall be charged upon the filing of an application:
A. Special exception permit: $100.
B. Limited bed-and-breakfast permit: $100.
C. Home occupation permit: $100.
The town shall charge a fee upon the submission of an application
for a planned unit development in the amount of $400, plus $10 per
proposed dwelling unit, plus the town's actual engineering costs
as charged by a consulting engineer, if desired by the town, for services
in reviewing the application. The town may require that an estimate
of its actual engineering costs be paid upon submission of the application,
with the balance to be paid or the excess refunded upon the town's
request of an invoice from the engineer.