[Ord. No. 2002.10, 2-5-2002]
All persons shall, before beginning any installation, alteration
or change of electrical wiring or equipment in the City, obtain a
permit for such work. Permits for installation, alteration and use
of electrical equipment shall be issued upon receipt of an application
made out on a printed form furnished by the Electrical Inspector.
The fee is to be paid in advance as provided for in this division.
Permits shall be posted in plain view, inside the building near the
entrance switch or inside the service switch when installed.
[Ord. No. 2002.10, 2-5-2002]
The application for an electrical permit shall contain the name
of the owner or user of the electrical equipment to be installed,
altered or changed, and the location of such work by correct address,
street and number, and the name and address of the person making the
installation.
[Ord. No. 2002.10, 2-5-2002; Ord. No. 2003.68, 7-1-2003; Ord. No. 2004.35, 6-1-2004; amended 6-1-2010 by Ord. No.
2010.44; 6-6-2017 by Ord. No. 2017.52]
(a)
Effective July 1, 2017, Electrical Permit Fee Schedule.
(1)
New Residential Electrical Permit Fee Schedule. All permits
for residential installations shall be charged an administrative fee
of $25.
c.
Garage (per bay), under, attached, unattached: $20.
h.
Central heating/cooling: $1 per BTU.
i.
Electrical heating: $1 per kilowatt.
j.
Exhaust fan: $5.
k.
Pump(s), water, sewage, other: $10, each.
l.
Low voltage wiring (i.e., fire, security, voice, data): $50.
m.
Smoke/carbon monoxide/heat detectors (not part of a system):
$10 each.
n.
GFCI/AFCI: $5 each.
p.
Permit not specified: $50.
q.
Minimum fee: $50.
r.
NOTE: For fee purposes, outlets will be classified as lights,
lighting and small appliance receptacles and lighting switches. Unless
otherwise stated, each permit issued under this Subsection (a)(1)
will be valid for one year from date of issuance.
(2)
New Commercial-Industrial Electrical Permit Fee Schedule. All
permits for commercial-industrial installations shall be charged an
administrative fee of $50.
a.
New building (does not include electrical service): $0.055 per
square foot.
c.
Temporary service: $60.
f.
Illuminated sign(s): $20 each.
g.
Area light pole(s): $5 each.
i.
Central heating/cooling: $1 per BTU.
j.
Electrical heating: $1 per kilowatt.
k.
Exhaust fan: $5.
l.
Pump(s), water, sewage, other: $10 each.
m.
Low voltage wiring (i.e., fire, security, voice, data): $50.
n.
Smoke/carbon monoxide/heat detectors (not part of a system):
$10.
o.
GFCI/AFCI: $5 each.
r.
Permit not specified: $50.
s.
Minimum fee: $50.
t.
NOTE: For fee purposes, outlets will be classified as lights,
lighting and small appliance receptacles and lighting switches. Unless
otherwise stated, each permit issued under this Subsection (a)(2)
will be valid for one year from date of issuance.
u.
Each commercial permit is entitled to eight inspections without
additional fees. A fee of $25 will be charged for each additional
inspection.