Exciting enhancements are coming soon to eCode360! Learn more 🡪
Village of Richfield, WI
Washington County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
A final certified survey map prepared by a registered land surveyor shall be required for all minor land divisions within the Village and the Village's extraterritorial jurisdiction. It shall comply in all respects with the requirements of § 236.34, Wis. Stats. When required as set forth in § 330-20, a preliminary certified survey map shall also be prepared as set forth in this article. The design and improvements relating to a minor land division shall also comply with the design standards and improvement requirements set forth in Articles VI and VII.
A. 
Both preliminary and final certified survey maps shall show correctly on their face, in addition to the information required by § 236.34, Wis. Stats., the following:
(1) 
All existing buildings, watercourses, drainage ditches, and other features pertinent to proper land division;
(2) 
Minimum setback or building lines required by Village ordinances;
(3) 
Utility and drainage easements;
(4) 
All lands dedicated for public use or reserved for future acquisition;
(5) 
Date of the certified survey map;
(6) 
Graphic scale and North point;
(7) 
Name and address of the owner, developer, and surveyor;
(8) 
Location of soil boring and soil evaluation tests conducted in accordance with Chapter SPS 385 Wis. Adm. Code. The written results of such test shall be submitted along with the certified map;
(9) 
All proposed streets, roads, or highways within 200 feet of the boundaries of the parcels created by the minor land division; and
B. 
In addition, a required preliminary certified survey map shall include existing and proposed contours as set forth in § 330-23.
A. 
Where the certified survey map is located within or adjacent to a United States Public Land Survey one-quarter section the corners of which have been relocated, monumented, and coordinated by the county, the Village, or the Southeastern Wisconsin Regional Planning Commission, the certified survey map shall be tied directly to one of the section or quarter corners as set forth in § 330-31.
B. 
Where the certified survey map is located within or adjacent to a United States Public Land Survey one-quarter section the corners of which have not been relocated, monumented, and coordinated by the county, the Village, or the Southeastern Regional Planning Commission, both ends of each property boundary line shall be tied to the nearest one-quarter corner and as required by Ch. 236, Wis. Stats.
The surveyor shall certify on the face of the certified survey map that he has fully complied with all the provisions of this chapter. The Village Plan Commission and Village Board shall each certify its approval on the face of the certified survey map. Dedication of streets and other public areas shall require, in addition, the owner's certificate and the mortgagee's certificate in substantially the same form as required by § 236.21(2)(a), Wis. Stats.