Collier Township Municipal Authority, PA
Allegheny County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Collier Township Municipal Authority 6-1-1977, as amended 7-14-1977, 9-8-1983 and 9-1988. Subsequent amendments noted where applicable.]
GENERAL REFERENCES
Meters — See Ch. 35.
Rates and charges — See Ch. 45.
Sewer connections — See Ch. 60.
Sanitary sewer construction — See Ch. 260.
Attachment 1 - Standard Details Diagrams
Article I Definitions

§ 65-1 Terms defined; word usage.

Article II Discharge of Sanitary Sewage to Public Sanitary Sewage System Required

§ 65-2 Connection to sewer system required.

§ 65-3 Connection standards.

§ 65-4 Private systems prohibited.

Article III Exclusion of Stormwater Runoff

§ 65-5 Discharge to sanitary sewers prohibited.

§ 65-6 Provisions for excluding runoff required.

§ 65-7 Drain or water connections prohibited.

§ 65-8 Combined sewers.

Article IV Industrial Use of Sewerage System

§ 65-9 Purpose of regulations; federal requirements.

§ 65-10 Prohibited discharges.

§ 65-11 Pretreatment requirements.

§ 65-12 Rate of discharge.

§ 65-13 Surcharges.

§ 65-14 Discharge permits.

§ 65-15 Manholes or metering chambers required.

§ 65-16 Monitoring and reporting requirements.

Article V Prohibitions and Limits for Waste Discharges

§ 65-17 Excessive discharges prohibited.

§ 65-18 Garbage discharge restricted.

§ 65-19 Permit required for certain discharges.

§ 65-20 Discharge restrictions.

Article VI Sewage Collection, Transportation and Treatment Charges

§ 65-21 Charges imposed; liability for payment.

§ 65-22 Payment due dates; billing.

§ 65-23 Basis for determining rates.

§ 65-24 Meters for measurement of water from outside sources.

§ 65-25 Determination of water entering system.

§ 65-26 Water excluded from system.

Article VII Surcharge for Certain Compatible Constituents of Industrial Wastes

§ 65-27 Surcharge imposed.

§ 65-28 Determination of constituents.

§ 65-29 Amount of surcharge.

Article VIII Billing and Collection

§ 65-30 Billing address.

Article IX Connections to System

§ 65-31 Application required.

§ 65-32 Payment of fees.

§ 65-33 Permit and payment of fees required for work to commence.

§ 65-34 Determination of fees.

§ 65-35 Time frame for connection.

§ 65-36 Discharge restrictions.

§ 65-37 Inspection of sewer and connection.

§ 65-38 Access to facilities for inspection.

§ 65-39 Number of inspections.

§ 65-40 Pipe specifications.

§ 65-41 Pipe cradles.

§ 65-42 Pipe slope and installation.

§ 65-43 Trap and vent.

§ 65-44 Commercial installations.

§ 65-45 Maintenance and repair.

§ 65-46 Use of old sewers.

§ 65-47 Optional connection for residential dwellings.

§ 65-48 Exhibits.

Article X Proposed Extensions of System by Developers

§ 65-49 Plan requirements.

§ 65-50 Sewer design.

§ 65-51 State permits required.

§ 65-52 As-built plans required.

§ 65-53 Easements.

§ 65-54 Pipe material.

§ 65-55 Pipe diameter and laying length.

§ 65-56 Jointing connections.

§ 65-57 Installation.

§ 65-58 Manholes.

§ 65-59 Testing.

§ 65-60 Permits and fees.

§ 65-61 Engineering reviews and inspection.

§ 65-62 Conditions for approval.

§ 65-63 Conveyance to Authority.

§ 65-64 Responsibility for cost.

§ 65-65 Deposits.

§ 65-66 Agreement between developer and Authority.

§ 65-67 General plans.

§ 65-68 Detailed plans.

§ 65-69 Engineer's report.

§ 65-70 Maintenance bond requirements.

Article XI Delinquencies, Violations and Remedies

§ 65-71 Delinquent payments.

§ 65-72 Notice of violation.

§ 65-73 Violations and penalties.

§ 65-74 Liability for expenses.